GENERAL COMMITTEE MEETING AGENDA 17 NOVEMBER 2014
Page 19 of 49
GENERAL COMMITTEE MEETING AGENDA 17 NOVEMBER 2014
Sr eae |
Document Capital /
Reference Cost Centre/Project Operating
CP003 Transport Infrastructure Planning Grants and Subsidies - Capital -$ 205,000.00 |Capital Bus Stop Program additional funding for 9 bus stops (50% funding).
‘CP003” [Transport infrastructure Planning ~~‘ |Materialsand Services. ~~ | $410,000.00 |Capital. [Bus Stop Program capital expenditure (Counciltofund50%)=~=~SCS;S;7«7;<S;7;7;7;7;7;<7;<;7<;<;7;<7 TS
‘CP003-~—~«*(SealedRoads==—=S=*=<—*~*=“‘“‘*~*~”;:C*@(Materiis ad Services ~—~—~—~—~*|-$ 205,000.00 [Capital [NSC contribution reallocated from contingentrenewalsfunds == = = ~~~ ~SsCS;ST«<T;7<7T;<;<S<;<7;<;<7;<;«SC;«SC;<;CS!
‘CP001-—~—~—~«[Noosa Aquatic Centre ~~=~S*S*«~&SMaatteriais an Services —~=~—~*«(| $7,710.00 |Capital. [Noosa Aquatic Centre Pool Blanket. Winch modifications. ==~=~=~=~~~~~S*SC~CS;<TC;«;«7«<S 3SS*é<~;<CS;S;SCS
‘CP001~*(|SealedRoads=~=~=~=~S*é«*~C:*«*&Y*Matterriis and Services ~=~—~—~*Y-$ 7,710.00 [Capital [Noosa Aquatic Centre Pool Blanket. Emergent infrastructure Renewal. Reallocated from contingentfunds. SS
“CP00a" Fransport infrastructure Pianning [Grants and Subsidies - Capital” |’$""57,600.00 [Capital Noosa ‘Bus Stations Safer Program. Adjustment for reduced grant funding —Ss=—=<~S~*=<“<“<S;*;*‘<=‘; C:*:<SSS
‘CP004—-—*ITransport Infrastructure Planning ~—‘|Materials and Services. ~—~*|-8 57,600.00 |Capital [Noosa Bus Stations Safer Program. Adjustment for reduced grantfunding =~ ~~~ ~SsCS;«7«<;7T:;<S;<;<;<;«7<S;<;<;<C;«C«CS!
“CP005”" Fransport infrastructure Planning -~*||Materiais and Services. —~—~—~—~—~*«([-S_ 15,019.00 |Capital. Whole of Shire - On Road Cycle Network. Savings to purchase It program. —~—SCS~=<“<~S*“‘“<~*~*~S~S~S
‘CP005~—~«*«(CICT Applications. =~=~=~S*S*«&WCMateriais and Services ~=~—~—~*«| $15,019.00 [Capital [Purchase of CAD engineering drafting || progam === ~~~ ~~~S:*<CS;~<‘<;<SC;«SC;SCS;S;*”*<S;SCS*S*SSSS
‘CP002——~—~S*dSeaied Roads ——~=*~=<~*~*=<~*~*~“*~*~”:C*WCMatteriais and eerie ~~—~—~~*| $553,610.00 [Capital [Additional Roads to Recovery Grant applied to Walter Hay Driveresealing = ~~~ ~~~~S~S*CST«T«7;<S;7<7;<;7<7;<;<;<;<;<C;<CST
‘CP002—~*«WSSeled Roads»=—=S=<C~*~*<“‘<‘“*~*~”:C*XdCGG rants; Sidi - Capital —~—~—~*|-$ 553,610.00 [Capital [Recognition of additional Roads to Recoverygrant. = | ~~~~S~CS;ST«<;7;7C;3C]CS*é<;7TCSTT
‘CP006-~=«<SSealed Roads —=—=<“~*~*“‘“~*~*S”S:”S;SS:C@CG rants, Subsidies - Capital —~—~——*([-$ 42,500.00 [Capital [Grant Funding Eenie Creek Rd/Walter Hay Drive intersection Safety Upgrade (50% funding) ~~SCS
‘CP006~*(|SealedRoads=—=~=~=~*S*S*=<“«~‘“*~*~”:C*@WCMateriais and Services ~~—~*«| $85,000.00 [Capital |Eenie Creek Rd/Walter Hay Drive Intersection Safety Upgrade (Councilfunding50%) =~ =~ ~~ ~SsSCS<S;<;<S;~S~S*S
“CPOO7"Fransport infrastructure Planning -‘|Grants, subsidies - Capital ~-~'| $10,000.00 [Capital “Sunrise Beach - Ben Lexcen Dr school. Grant Reduction —S—s—~CS*=“‘“‘<;73}>PDSé<S”*é<=SCS*é=<=S:SSS
‘CP007 | Transport infrastructure Planning —‘|Materials and Services. ~~—~*«| $10,000.00 [Capital [Sunrise Beach- BenLexcen Dr school. GrantReduction. = ~~~ ~S*<CS;«CT;«<S;]7S]}STS*é<;7<CSCSSt*<SCS*;*<CS*S:SS
‘CP008 [Transport infrastructure Planning‘ |Grants, subsidies - Capital |-$ 115,000.00 [Capital [Grant Funding Cooroy Noosa Rd Corridor Improvement (50% funding) ~S*CS<S;«7T«S SFS*<S~;<S;«S*é<=S*CS~S
‘CP008 ~~‘ Transport Infrastructure Planning ~‘|Materials and Services. ~—~—~—~*| $ 230,000.00 [Capital |Cooroy Noosa Rd Corridor Improvement (Council funding50%) == = =~ ~StC<;7;<S ]3EFt*é<S;7TCS
‘CP009.—~*«‘“‘SiPathways=~=~=<~*~“‘“*”S”~”~”:”;+#SCG rants, Subsidies - Capital ~—~~—*[-$ 20,000.00 |Capital [Grant Funding Eenie Creek Pathway (Cycle Grant 50% funding) =~ ~~ ~StstCS;é‘;7}3XTS*é<S;CO
‘CP009.~*«WPathways=~=~=*=C<“*‘“‘“‘*”S”S”~”~”~”:*#*@WMateriais and Services ~~*(| $ 40,000.00 [Capital |Eenie Creek Pathway (Councilfunding50%) === ~~ ~~~ ~~StstCS;S;<S;<7;7<7;7;7;7;7;7;7;7S SST
‘CPOI0 "Pathways mmm "Grants, Subsidies - Capital |-§ 200,000.00 [Capital [Grant Funding Wallace Park Shared Pathway (Cycle Grant 50% funding) —S—=s=<“CS~S*é“‘“‘;73RESS:*<CS:S
‘CPOi0..~*|Pathways.=S=<“~*~*=*‘“~*””~”~™”:*C*@*Materiais and Services ~~—~—~—~—~*«| $ 400,000.00 [Capital [Wallace Park Shared Pathway (Councilfundingo0%) = ~~~ ~~~~S~S~s~t~CS;<ST;«7;7;<S;7<;<7;7;7;7;7;<SC; SSF
ee0 TT ee see coo oy ora emma aterials and Services." T's "9,338.50 [Capital |Cooroy Library Tactile Marker Replace net nn mnmnynenepeennnnnn
CP011 Sealed Roads Materials and Services -$ 9,338.50 [Capital (Cooroy Library Tactile Marker. Emergent all Infrastructure Renewal. Reallocated from contingent funds.
“CPOi2” "Parks and Gardens" ateriais and Services" |'$""24500.00 [Capital "Botanical Gardens Park Furniture Renewal SSCS~™~—~SSCSSSCSCOCSCSS
‘CP012,~—«*«(SealedRoads.==—=~=S=~*~*=<“<‘“‘*~”*C*WMatteriis ad Services ~~~—~—~*|-$ 24,500.00 [Capital | Botanical Gardens. Emergent all infrastructure Renewal. Reallocated from contingentfunds. = = = SSS
‘CP0i3"—— ‘(Drainage Materials and Services. ~~~~«| § 50,000.00 |Capital. [Noosa RiverFlood mitigation strategy =~=~=~S*~CS~*~<“‘<;72XS SC*<S*é‘;7}+TSSt*<S*é‘<;<;CS;<ST
C014 [iransport infrastructure Planning [Materials and Services [$50,000.00 |Capital New Noosa Bus Shelters oes commen nneeennep
CP014 Sealed Roads Materials and Services -$ 50,000.00 {Capital New Noosa Bus Shelters - Design. Emergent all Infrastructure Renewal. Project cost reallocated from contingent funds.
‘CP016 [Environmental Services Co-ordination [Materials and Services. ~~~‘ | $ 300,000.00 |Capital. |NoosaRiverHydraulic Model. === = ~~ ~~SstéCS;S;<S;<S;<;<S;<;<SC;«SCS;SCS;S”®®
‘GP0i7 "|Community Leases" Materials and Services" |'$"10,000.00 [Capital |Girraween Sports Complex Lighting eee
CP018 Sealed Roads Materials and Services -$ 30,000.00 {Capital Borreen Point Tennis Court. Emergent all Infrastructure Renewal. Project cost reallocated from contingent funds.
‘CP0i8” "[Boreen Point Caravanpark—S*S~S*~S*«~diMateriaiiss and Services ~~—~—~«(| $30,000.00 |Capital. [Borreen Point Tennis Courtrefurbishment. —~—~SC~CS~<“<~S*‘;7}+TSSt*C<CS*é<S;CS;*tSS
‘CP0i9.~—~«<(Canalsand Waterways. ~=~™S*«W(Matterials and Services ~—~—~«| $60,000.00 |Capital |‘ [MunnaPointForeshore Stabilisation == ~~ ~~S~*~<CS~S;7;«7A}t*~<;7T TT
‘CP020——*([Commercial Land & Property. ~—~—~*«[Materialsand Services. ~—~—~—~«(| $750,000.00 |Capital. ‘|LandAquisiion. =~ ~~~S*<C~S;7;<S;7T]SS*~<S~;S;S;S”®®®!””””t”*~<S:t
‘CP021~~~+‘|RoadFumitue | ~~~«*J/Materialsand Services. ~—~—~*&(-$ 29,085.25 [Capital | |Eumundi Rd Corridor Improvement. Realloaction. = = =~ ~~~~~~S~té<CS;<S;7;7;<C;<S;«<C;<7;7;7;7C;7S;SCTCS
Page 4 Budget Review 2 -2014-15
Page 19 of 49See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.