Skip to the record
Every meeting, every word.

Original source · versioned page text

2014-11-17 General Committee Agenda

of 49

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   17 NOVEMBER 2014




                                        Page 19 of 49

GENERAL COMMITTEE MEETING AGENDA                                                                                         17 NOVEMBER 2014

   Sr eae |
    Document                                                                                    Capital /
     Reference    Cost Centre/Project                                                           Operating
     CP003        Transport Infrastructure Planning  Grants and Subsidies - Capital -$ 205,000.00 |Capital     Bus Stop Program additional funding for 9 bus stops (50% funding).
    ‘CP003” [Transport infrastructure Planning    ~~‘ |Materialsand Services. ~~ | $410,000.00 |Capital. [Bus Stop Program capital expenditure (Counciltofund50%)=~=~SCS;S;7«7;<S;7;7;7;7;7;<7;<;7<;<;7;<7 TS
    ‘CP003-~—~«*(SealedRoads==—=S=*=<—*~*=“‘“‘*~*~”;:C*@(Materiis ad Services       ~—~—~—~—~*|-$ 205,000.00 [Capital [NSC contribution reallocated from contingentrenewalsfunds == = = ~~~ ~SsCS;ST«<T;7<7T;<;<S<;<7;<;<7;<;«SC;«SC;<;CS!
    ‘CP001-—~—~—~«[Noosa Aquatic Centre ~~=~S*S*«~&SMaatteriais an Services —~=~—~*«(| $7,710.00 |Capital.    [Noosa Aquatic Centre Pool Blanket. Winch modifications. ==~=~=~=~~~~~S*SC~CS;<TC;«;«7«<S 3SS*é<~;<CS;S;SCS
    ‘CP001~*(|SealedRoads=~=~=~=~S*é«*~C:*«*&Y*Matterriis and Services              ~=~—~—~*Y-$ 7,710.00 [Capital [Noosa Aquatic Centre Pool Blanket. Emergent infrastructure Renewal. Reallocated from contingentfunds. SS
    “CP00a" Fransport infrastructure Pianning        [Grants and Subsidies - Capital” |’$""57,600.00 [Capital Noosa ‘Bus Stations Safer Program. Adjustment for reduced grant funding —Ss=—=<~S~*=<“<“<S;*;*‘<=‘; C:*:<SSS
    ‘CP004—-—*ITransport Infrastructure Planning     ~—‘|Materials and Services.    ~—~*|-8 57,600.00 |Capital [Noosa Bus Stations Safer Program. Adjustment for reduced grantfunding =~ ~~~ ~SsCS;«7«<;7T:;<S;<;<;<;«7<S;<;<;<C;«C«CS!
    “CP005”" Fransport infrastructure Planning       -~*||Materiais and Services. —~—~—~—~—~*«([-S_ 15,019.00 |Capital. Whole of Shire - On Road Cycle Network. Savings to purchase It program. —~—SCS~=<“<~S*“‘“<~*~*~S~S~S
    ‘CP005~—~«*«(CICT Applications. =~=~=~S*S*«&WCMateriais and Services   ~=~—~—~*«| $15,019.00 [Capital [Purchase of CAD engineering drafting || progam ===       ~~~ ~~~S:*<CS;~<‘<;<SC;«SC;SCS;S;*”*<S;SCS*S*SSSS
    ‘CP002——~—~S*dSeaied Roads ——~=*~=<~*~*=<~*~*~“*~*~”:C*WCMatteriais and eerie ~~—~—~~*| $553,610.00 [Capital [Additional Roads to Recovery Grant applied to Walter Hay Driveresealing = ~~~ ~~~~S~S*CST«T«7;<S;7<7;<;7<7;<;<;<;<;<C;<CST
    ‘CP002—~*«WSSeled Roads»=—=S=<C~*~*<“‘<‘“*~*~”:C*XdCGG rants; Sidi - Capital    —~—~—~*|-$ 553,610.00 [Capital [Recognition of additional Roads to Recoverygrant. = | ~~~~S~CS;ST«<;7;7C;3C]CS*é<;7TCSTT
    ‘CP006-~=«<SSealed  Roads —=—=<“~*~*“‘“~*~*S”S:”S;SS:C@CG rants, Subsidies - Capital —~—~——*([-$ 42,500.00 [Capital [Grant Funding Eenie Creek Rd/Walter Hay Drive intersection Safety Upgrade (50% funding) ~~SCS
    ‘CP006~*(|SealedRoads=—=~=~=~*S*S*=<“«~‘“*~*~”:C*@WCMateriais and Services ~~—~*«| $85,000.00 [Capital |Eenie Creek Rd/Walter Hay Drive Intersection Safety Upgrade (Councilfunding50%) =~ =~ ~~ ~SsSCS<S;<;<S;~S~S*S
    “CPOO7"Fransport infrastructure Planning       -‘|Grants, subsidies - Capital ~-~'| $10,000.00 [Capital “Sunrise Beach - Ben Lexcen Dr school. Grant Reduction —S—s—~CS*=“‘“‘<;73}>PDSé<S”*é<=SCS*é=<=S:SSS
    ‘CP007 | Transport infrastructure Planning       —‘|Materials and Services. ~~—~*«| $10,000.00 [Capital [Sunrise Beach- BenLexcen Dr school. GrantReduction.  = ~~~ ~S*<CS;«CT;«<S;]7S]}STS*é<;7<CSCSSt*<SCS*;*<CS*S:SS
    ‘CP008 [Transport infrastructure Planning‘ |Grants, subsidies - Capital         |-$ 115,000.00 [Capital [Grant Funding Cooroy Noosa Rd Corridor Improvement (50% funding) ~S*CS<S;«7T«S SFS*<S~;<S;«S*é<=S*CS~S
    ‘CP008 ~~‘ Transport Infrastructure Planning     ~‘|Materials and Services. ~—~—~—~*| $ 230,000.00 [Capital |Cooroy Noosa Rd Corridor Improvement (Council funding50%) == = =~ ~StC<;7;<S ]3EFt*é<S;7TCS
    ‘CP009.—~*«‘“‘SiPathways=~=~=<~*~“‘“*”S”~”~”:”;+#SCG rants, Subsidies - Capital ~—~~—*[-$ 20,000.00 |Capital [Grant Funding Eenie Creek Pathway (Cycle Grant 50% funding) =~ ~~ ~StstCS;é‘;7}3XTS*é<S;CO
    ‘CP009.~*«WPathways=~=~=*=C<“*‘“‘“‘*”S”S”~”~”~”:*#*@WMateriais and Services ~~*(| $ 40,000.00 [Capital |Eenie Creek Pathway (Councilfunding50%) ===           ~~ ~~~ ~~StstCS;S;<S;<7;7<7;7;7;7;7;7;7;7S SST
    ‘CPOI0 "Pathways              mmm            "Grants, Subsidies - Capital       |-§ 200,000.00 [Capital [Grant Funding Wallace Park Shared Pathway (Cycle Grant 50% funding) —S—=s=<“CS~S*é“‘“‘;73RESS:*<CS:S
    ‘CPOi0..~*|Pathways.=S=<“~*~*=*‘“~*””~”~™”:*C*@*Materiais and Services  ~~—~—~—~—~*«| $ 400,000.00 [Capital [Wallace Park Shared Pathway (Councilfundingo0%) =         ~~~ ~~~~S~S~s~t~CS;<ST;«7;7;<S;7<;<7;7;7;7;7;<SC; SSF
    ee0 TT ee see coo oy  ora emma aterials and Services." T's "9,338.50 [Capital |Cooroy Library Tactile Marker Replace net                          nn mnmnynenepeennnnnn
     CP011        Sealed Roads                       Materials and Services         -$  9,338.50 [Capital     (Cooroy Library Tactile Marker. Emergent all Infrastructure Renewal. Reallocated from contingent funds.
    “CPOi2” "Parks and Gardens" ateriais and Services" |'$""24500.00 [Capital "Botanical Gardens Park Furniture Renewal SSCS~™~—~SSCSSSCSCOCSCSS
    ‘CP012,~—«*«(SealedRoads.==—=~=S=~*~*=<“<‘“‘*~”*C*WMatteriis ad Services ~~~—~—~*|-$ 24,500.00 [Capital | Botanical Gardens. Emergent all infrastructure Renewal. Reallocated from contingentfunds. = = = SSS
    ‘CP0i3"—— ‘(Drainage                             Materials and Services. ~~~~«| § 50,000.00 |Capital.     [Noosa RiverFlood mitigation strategy =~=~=~S*~CS~*~<“‘<;72XS SC*<S*é‘;7}+TSSt*<S*é‘<;<;CS;<ST
    C014 [iransport infrastructure Planning         [Materials and Services [$50,000.00 |Capital New Noosa Bus Shelters oes                       commen                                    nneeennep
     CP014        Sealed Roads                       Materials and Services         -$ 50,000.00 {Capital      New Noosa Bus Shelters - Design. Emergent all Infrastructure Renewal. Project cost reallocated from contingent funds.
    ‘CP016 [Environmental Services Co-ordination     [Materials and Services. ~~~‘ | $ 300,000.00 |Capital. |NoosaRiverHydraulic Model. === =        ~~ ~~SstéCS;S;<S;<S;<;<S;<;<SC;«SCS;SCS;S”®®
    ‘GP0i7 "|Community Leases"                      Materials and Services" |'$"10,000.00 [Capital |Girraween Sports Complex Lighting                                                     eee
     CP018        Sealed Roads                       Materials and Services         -$ 30,000.00 {Capital      Borreen Point Tennis Court. Emergent all Infrastructure Renewal. Project cost reallocated from contingent funds.
    ‘CP0i8” "[Boreen Point Caravanpark—S*S~S*~S*«~diMateriaiiss and Services ~~—~—~«(| $30,000.00 |Capital. [Borreen Point Tennis Courtrefurbishment. —~—~SC~CS~<“<~S*‘;7}+TSSt*C<CS*é<S;CS;*tSS
    ‘CP0i9.~—~«<(Canalsand Waterways.    ~=~™S*«W(Matterials and Services    ~—~—~«| $60,000.00 |Capital |‘ [MunnaPointForeshore Stabilisation  ==             ~~ ~~S~*~<CS~S;7;«7A}t*~<;7T    TT
    ‘CP020——*([Commercial Land & Property.    ~—~—~*«[Materialsand Services. ~—~—~—~«(| $750,000.00 |Capital. ‘|LandAquisiion. =~ ~~~S*<C~S;7;<S;7T]SS*~<S~;S;S;S”®®®!””””t”*~<S:t
    ‘CP021~~~+‘|RoadFumitue | ~~~«*J/Materialsand Services.                ~—~—~*&(-$ 29,085.25 [Capital |   |Eumundi Rd Corridor Improvement. Realloaction. = = =~ ~~~~~~S~té<CS;<S;7;7;<C;<S;«<C;<7;7;7;7C;7S;SCTCS
                                                                                                           Page 4                                                                                 Budget Review 2 -2014-15

                                                                                                                                     Page 19 of 49
Log in to download the original file

2014-11-17 General Committee Agenda(PDF, 8MB).pdf · 8.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.