GENERAL COMMITTEE MEETING AGENDA 17 NOVEMBER 2014
Page 20 of 49
Supporting
Document Capital /
Reference _|Cost Centre/Project meme inancial Statement em Amount|Operating ___|Comment
CcP021 ‘Transport Infrastructure Planning Materials and Services $ 29,085.25 {Capital Eumundi Rd Corridor Improvement. Realloaction.
‘CP022-—* [Transport infrastructure Planning ~~‘ |Materialsand Services. ~—~«(|$ 5,100.00 |Capital. [Noosa Junction Disabled Parking. Original estimate excluded designand survey. =~~S~S*CS<S;<S;XTCS*<S
“CP023-——*«([Canais and Waterways. —~=~=~S*S*~CS*«~CMatterviais and Services ~—~*«| $20,000.00 [Capital |Noosaville - Gympie Ice / Williams St. Increased design costs due to enhanced scope. ~~ ~~~—~SCS;<T«<;«7;<7;<;«S;«C;<CS
“CP024"” [Noosa Aquatic Centre —~S*~S*”:* Matters ad Services ~~*«('-$ ~—~6,648.18 [Capital [Noosa Aquatic Centre - pool cleaner. Project compieted below budget —=~=~SC~CS=<“<S;7; ;2CS~S”*<=CS*é<=S*;*~S
“CP025- "Public Amenities “TE pioyee Benefits 1°$""20.000.00 [Capital "| Whoie of Shire- ‘public toilet 7 Sewerage. Deferred Handover of STP from Unitywater onhoid
‘CP026 ~~‘ |PublicAmenities.~*«(Materialsand Services. ~—~~*|-$ 15,000.00 [Capital |Whole of Shire- public toilet / sewerage. Deferred Handover of STP from Unitywateronhold| ~—~—~—~SCS«*S
“CP027- "Environmental Services Co-ordination” |empioyee Benefits. ~~~~~*«|-$ 200,000.00 [Capital |Weyba Creek - bank erosion restoration. Deferred to 15/16 capital progam —SsSCSCS~*=“~*~S*~*~*~=<CS~S~S~S~S~SSSSSSS~—S
‘CP028——*«(ParksandGardens.=~=~S~S*<CS*S*«~CEmiplyee@ Benefits ~—~—~—~—~«*«(-$ 6,000.00 |Capital. [Noosaville - Munna Pk basket ball court. Project completed below budget = = == ~~ ~~ ~~ ~SSSSCS;~S;~S;<;<C;~S*S
“CP029" (Parks and Gardens —=—=S*=<“<*~*“*~*Mattervicis ad Services ~~—~—~—~—~*Y-$ 11,058.38 [Capital |Noosaville -Gympie Tce Foreshore BBQs. Project completed below budget =~ ~~ ~~ SSSCS<S;<;«7;«S;«S;<;7;7;COS:”
“CP029°” "(Parks and Gardens —=*=<—*~*~=~*=<*~*CMatterricis ad Services ~~ ~*«(Y $60,000.00 [Capital [Change scope to provide better structure Noosvilie Lions Park Pirate Playground. =~=~=~S*~CS;~S;~S;«S;<S;«S;<S;S;S;S*é‘<=CS:*~S™”
“CP029"" "Parks and Gardens "Materials and Services |-$ 60,000.00 [Capital [emergent all infrastructure Renewal. Project cost reallocated from contingent funds. SssSsSSSSSSCSC~C~CS
‘GP030 [Parks and Gardens eee nmmmnnnd Materials and Services |'$ 10,000.00 [Capital Whole of Shire “ playaround renewal program. Additional urgent (pag a mmnmnnrconrenmpennn
CP030 Parks and Gardens Materials and Services -$ 10,000.00 |Capital Whole of Shire - playground renewal program. Emergent all Infrastructure Renewal. Project cost reallocated from contingent
funds.
GPO31 [Parks and Gardens ee mmmmmnnnd Materials and Services |'S.10,000.00 [Capital Tewantin - pathway upgrade and lighting. Additional Urgent epg mnmmrnmnnerennernmnnn
CP031 Parks and Gardens Materials and Services -$ 10,000.00 |Capital Tewantin - pathway upgrade and lighting. Emergent all Infrastructure Renewal. Project cost reallocated from contingent funds.
CBORD PRaways mmr Sais, Subsidies ~ Capital” $280 600100 [Capital Noosa Heads “Wain Beach boardwalk” Unsuccessiul Grant application (grant revenue reducedy
ooo eee ee oath ays eee nmmsnnmannnnnnf employee Benefits" [$500,000.60 [Capital "Noosa Heads - Main Beach boardwalk. Unsuccessful Grant (expenditure reduced eee eee
CP033 Pathways Grants, subsidies - Capital $ 425,000.00 |Capital Noosa Heads - Park Rd boardwalk stage 3a. Unsuccessful Grant application (grant revenue reduced)
“CP033" Pathways" SS*S:*~S~<CS~S:SCd Emptvyece® Benefits SSSSSS*d-$ 850,000.00 |CCaapital ~~ [Noosa Heads - Park Rd boardwalk stage 3a. Unsuccesful Grant (expenditure reduced) —s—=“=~“~*=‘“‘“‘;<;S*é‘<=~S~*S*~S~SCS
‘CP034‘ISportand Community ——~—~S*S*S*«~CEmiplyee Benefits —~—~—~—~—~—~*«(-$._ 12,000.00 |Capital. |Girraween Sports Ground imigation. Completed under budget. =~=~=S=SOSCSséi‘™S™O™SONC
“CP035 Pathways Taterials and Services. -~~-~*|-§. 43,400.00 |Capital [Pomona State School Station Street Pathway improvemenis. Project to be redesigned —Ss=~CS~S~S
‘CP036-~~—~—~«SeaiedRoads==—=—=S=*=<~*~*=<“*~*~*~”:*@CMateritis and Services ——~—~—~—~—~—~«*Y(-S~—-2,797.00 [Capital ‘[Eenie Creek Road/ Langura Street intersection safety upgrade. Completed under budget =—=SOSC*~CS
‘GP037 [Sealed Roads ...| Materials and Services" |'$"30,000.00 [Capital |Noosaville - Eumundi Noosa Road corridor additional works requiem
CP038 Transport Infrastructure Planning Grants, subsidies - Capital $ 62,500.00 |Capital Whole of Shire - On Road Cycle Network grant funding reduction. Cycle networks no improvements identified, green treatments
ipl i i i Al yaa ance SasoaN ERROR ONE RY ROBO TOIT ssa Sa A ia ai
CP038 Transport Infrastructure Planning Materials and Services -$ 109,981.00 |Capital Whole of Shire - On Road Cycle Network expenditure reduction. Cycle networks no improvements identified, green treatments
ccentenmenannaeennnennfvnnunnimninieninenmumnimnnannnmnnmmnsnnennnanaennennnel meninnenunnnmnnnnmannaanenmmnunennnl ummnemmnarnuerannfummmnnenmunnmand O08, GONE DY ESCA PLOQTAM .. unummnnnnnannnnansnnnenunaetnanninnannnnnnanaennsennneninnenenunntnntinninnanmnnnt
.GPO39 Noosaville Landfill Eumundi Road. Employee Benefits. summnanenSun00i000.00 [Capital Noosaville Landfill. stormwater. Works not able to be Undertaken a smmmmantnnuuntinnnsnnenunnnninnnntnnninuinnn
CP040 Noosa Waters Canal Management Levy _| Materials and Services $ 150,000.00 |Capital Noosa Waters - scour protection stage 2b. Addional due to extra section being completed in sequence.
CBORT TF neat is and Sewvices YS" 35 G60 [Capital Wihcie GF She = FeeH Ge THR module” Not purchasing all modules. rn
“CP042" "Transport infrastructure Pianning [Materials and Services. ~~~-~*|-§ 25,000.00 [Capital |Standards Review - Standard Drawings. Scope changed tofocus onoldredbook—s—~<CS*é=“‘“‘;73}>PS:é<S~S*~CSC~S
RR GO GY (YQ
Page 5 Budget Review 2 -2014-15
Page 20 of 49See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.