Original source · versioned page text
Civil Engineering Cover Letter
Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/ 0133 - email 1 of 3.
Attached to the e-mail Response to SEQ Water Third Party Advice - MCU16/0066 & OPW16/0133.
13 October 2016
Ref: SR/IG/161968-Gen
100460ltr
Hass Holdings ATF The Quasar Trust
c/- Project Urban
PO Box 6380
MAROOCHYDORE QLD 4558
Attention: Mr John McKennariey
Council Ref: MCU16/0066
Dear John
Re: Proposed Service Station
At: Taylor Court Cooroy
For: HASS Holdings ATF The Quasar Trust
With reference to the abovementioned project, and further to Council’s Information Request
dated 22 July 2016, received 29 July 2026, we respond as follows to the matters raised in
our scope of works:
18. Information Required
Identify proposed levels and gradients on the site, including at the proposed access
driveways, and assess those gradients against the requirements of Australian Standard
AS/NZS 2890.1-2004.
Response
A plan has bene produced showing the spot levels and grade arrows as requested. The
access grades into the site conform with the requirements of AS/NZS 2890.1-2004. Refer to
Plan SWMP01 in Appendix B of the Stormwater Management Plan.
20. Information Required
Demonstrate that there will be no increase in nutrients, otherwise demonstrate that the
owners of Lake Macdonald are satisfied that the increase in nutrients expected from the
proposed development will not contribute to an unacceptable cumulative increase in nutrients
entering Lake MacDonald.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.