Council archive · source document
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208
Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
--
~ .~..-’ -
_ ._!pI
-
Place Barcode here
S~iii~i iii~i 80602704
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
Part \1 Of -:sI
Application number: Me\)\L-[
020~
C:\Documents and Settings\eje\Desktop\Multi Part Record Cover Sheet NEXT PART
(3).doc
I
Devclc......-..".. .. !t .’ ~
IBOX:~.S."!.~1.... ..2Q......]
R:
2 0 Die 2012
l
~ "....!
r ....
",I-
. , ’’’’P’’\
I
L__ _-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 91 (of 103)
Page 2
PROJECT
rwo~)sa
on weyba
CONCEPTUAL
GROUNDWATER ASSESSMENT
AND MANAGEMENT PLAN
NOOSA ON WEYBA
DEVELOPMENT, NOOSAVILLE
QUEENSLAND
PREPARED FOR
NORTHBROOK CORPORATION PTY LTO
DATE
SEPTEMBER 2012
Page 3
DOCUMENT CONTROL
DOCUMENT 10838_GWA_ELH2F.docx
TITLE Conceptual Groundwater Assessment and Management Plan, Noosa on Weyba
Development, Noosaville, Queensland
PROJECT MANAGER E. Holton
AUTHOR(S) E. Holton
CLIENT Northbrook Corporation Pty Ltd
CLIENT CONTACT Steve MacRae
CLIENT REFERENCE Noosa on Weyba Groundwater Assessment
SYNOPSIS This report provides an assessment of existing groundwater conditions at
the proposed Noosa on Weyba Development site and considers the likely impacts of
the proposed development on those lands.
REVISION HISTORY
REVISION # DATE EDITION BY APPROVED BY
20/07/12 E. Holton C. Anderson / L. Varcoe
2 1/09/12 E. Holton C. Anderson / L. Varcoe
DISTRIBUTION
REVISION NUMBER
Distribution 2 3 4 5 6 7 8 9 10
Northbrook Corporation Pty
G&S library & file
Brisbane Sydney Melbourne and regions Agriculture. Water. Environment.
20/115 Wickham Street Fortitude Valley Brisbane QLD 40061 PO Box 694 Fortitude Valley OLD 4006
Phone 07 3852 3999 I Email [email protected] I www.access.gs
Page 4
www.ac ss.gs +GILBERI
SlJT1-ERlAN)
SUMMARY
Northbrook Corporation Pty Ltd commissioned Gilbert & Sutherland
Pty Ltd (G&S)to prepare a conceptual Groundwater Assessment
and Management Plan for the proposed Noosa on Weyba
development, Noosaville, Queensland.
A total of 15 groundwater bores were constructed across the
Hofmann Land by Golder Associates in 2007, however some of
these have since been damaged or destroyed. Our initial site
inspection located 13 existing bores suitable for groundwater
monitoring. No existing groundwater bores were located on the
Northbrook land. To augment the existing monitoring bore network
on the Hofmann land and establish a monitoring network on the
Northbrook land, G&S installed a total of six (6)additional
groundwater bores.
Six (6)rounds of groundwater monitoring were conducted at the site
from March to June 2012 and the collected data used to prepare a
conceptual groundwater model using the USGS groundwater
modelling package MODFLOW. The model was used to
conceptualise the existing groundwater environment and predict the
likely impacts of the proposed development.
Groundwater impacts predicted during the construction phase are
limited to the impacts of groundwater drawdown during trenching/
excavation works. The results of this assessment indicate that
where groundwater drawdown occurs, the lateral extent will vary
between 20m and 1,281 m. The larger drawdown extents are
predicted to occur in areas of the site where Tenosols (sandy soils)
have been identified. Whilst Hooghoudt’s equation predicts the
lateral extent of drawdown to extend up to 1,281 m in these soil
types, in reality, the true extent of drawdown will be limited to the
extent of this soil type.
Instances of groundwater drawdown are unlikely to be prolonged
with excavations such as services trenches excavated and
backfilled on a progressive basis. The extent of groundwater
drawdown calculated in this report is based on a scenario where no
mitigation measures are in place. Implementation of mitigation
measures such as those described in the attached Groundwater
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTD _
GROUNDWATER ASSESSMENT 3
Page 5
www.ac ss.gs
+GILBERI
SU1’l
Management Plan, will substantially reduce the level of groundwater
drawdown likely to be experienced at the site.
Disturbance of acid sulfate soil through excavation and/or
groundwater drawdown has the potential to impact upon groundwater
quality if appropriate management techniques are not implemented.
To preventlminimise groundwater quality impacts during the
earthworks phase of the development, works should be undertaken in
accordance with a site specific Acid Sulfate Soils Management Plan.
Operational phase groundwater impacts are limited to a localised
decrease in groundwater level beneath the development footprint as
a result of reducedgroundwater recharge. No offsite impacts are
predicted by the groundwater model. It is important to note that the
benefits of groundwater recharge from the outflows of the
stormwater treatment devices have not been included in the
groundwater model. The results presented in this report therefore
represent the predicted maximum decrease in groundwater level as
a result of the development.
Activities and/or land uses likely to impact on groundwater quality
(such as onsite effluent disposal or industrial activities) are not
proposed for the Noosa on Weyba development. Operational phase
impacts to groundwater quality are not anticipated.
The effect of groundwater drawdown has the potential to impact on
sensitive receivers such as the identified ecological communities
located throughout and adjacent to the development site. For the
Noosa on Weyba development, groundwater drawdown is limited to
the earthworks phase of the development and is unlikely to occur for
prolonged periods of time. At this stage of the development
proposal, the exact location of services trenches is unknown.
Should these be proposed for areas adjacent to sensitive receiving
environments, mitigation measures such as those proposed in the
attached Groundwater Management Plan should be implemented.
Groundwater impacts that are likely to result from the proposed
Noosa on Weyba Development are anticipated to be minimal and
are not predicted to extend beyond the boundaries of the
development. Where impacts are predicted to occur, the
techniques, measures and strategies described in the attached
groundwater management plan should be implemented to prevent
and/or minimise any impacts to groundwater and sensitive receivers
at the site.
4 AGRICULTURE WATER ENVIRONMENT
Page 6
www.access.gs
+GILtERI
SlJT1-ERlAN)
CONTENTS
1 Introduction........................................................................9
1.1 Background.......................................................................9
1 .2 Proposed development.................. ..........................
.........9
1 .3 Scope of works............................... ..........................
.........9
1 .4 Aims and objectives....................... .................................
10
1.5 Standards and guidelines................................................10
2 Site description ...............................................................
.11
2.1 Property description ........................................................11
2.2 Geology...........................................................................11
2.3 Topography.....................................................................12
2.4 Drainage..........................................................................12
2.5 Vegetation.......................................................................12
2.6 Current land use............................. .................................
13
2.7 Surrounding land use ......................................................13
3 Method ............................................................................14
3.1 Desktop assessment............... .............................
...........14
3.2 Groundwater monitoring bore network ............................
14
3.3 Groundwater monitoring.......... ........................................
15
3.4 Site soil permeability .......................................................15
3.5 Groundwater model development ...................................16
3.5.1 Software............................. .................................
16
3.5.2 Model domain.... .................................................
16
3.5.3 Topography.........................................................16
3.5.4 Stratigraphy........................ ..........................
.......16
3.5.5 Boundary conditions ...........................................
17
3.5.6 Recharge and evaporation ....................
..............17
3.5.7 Hydraulic characteristics.. ............................
.......18
3.6 Calibration...... ...........18
......................................................
3.7 Sensitivity........................................................................18
3.8 Model limitations......................... ..........................
...........18
3.9 Construction phase groundwater impacts.. .....................
19
10838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 5
Page 7
www.ac ss.gs
+GILBERI
SlJT1-ERI.
3.10 Post development groundwater impacts .........................19
3.11 Sea level rise................................................................... 19
4 Results.............. .............................................................
.21
4.1 Groundwater level........................................................... 21
4.2 Groundwater quality ........................................................
21
4.2.1 pH .......................................................................21
4.2.2 Electrical conductivity.............. ............
...............21
4.2.3 Dissolved metals........ ...............21
..........................
4.2.4 Major cations and anions.. ..................................
22
4.3 Soil description and classification ...................................22
4.3.1 Dermosols..... ..........................22
............................
4.3.2 Kandosols ...............23
............................................
4.3.3 Chromosols.........................................................23
4.3.4 Kurosols........ ..........................23
............................
4.3.5 Tenosols .............................................................23
4.4 Soil permeability ..............................................................
23
4.5 Recharge and evaporation..............................................24
4.6 Steady-state calibration results .......................................
24
4.7 Groundwater model outcomes ........................................
25
4.7.1 Pre-development groundwater levels and flow
direction ..............................................................
25
4.7.2 Earthworks phase groundwater level and flow
direction changes ...............................................25
4.7.3 Earthworks phase drawdown.............................. 25
4.7.4 Earthworks phase seepage ................................
25
4.7.5 Earthworks phase groundwater quality impacts.26
4.7.6 Earthworks phase impacts on nearby sensitive
receivers............. ..........................
......................26
4.7.7 Operational phase groundwater level and flow
direction changes ...............................................27
4.7.8 Operational phase drawdown .............................
27
4.7.9 Operational phase seepage................................ 27
4.7.10 Operational phase groundwater quality impacts 27
4.7.11 Operational phase impacts on nearby sensitive
receivers............. ..........................
......................27
6 AGRICULTURE WATER ENVIRONMENT
Page 8
www.access.gs
+GILtERI
SlJT1-ERlAN)
4.7.12 Sea level rise impacts.........................................28
4.8 Model sensitivity analysis and uncertainty ......................28
5 Conclusions.................................................................... .29
5.1 Earthworks phase groundwater impacts .........................29
5.2 Operational phase groundwater impacts.........................29
5.3 Predicted impacts for sensitive receivers ........................29
5.4 Sea level rise...................................................................29
5.5 Summary .........................................................................30
6 Limitations of reporting ....................................................31
7 Appendix 1 -
Development Master Plan........................ .32
8 Appendix 2 -
Borelogs .33
...................................................
9 Appendix 3 -
Groundwater monitoring results ...............
.34
10 Appendix 4 -
Laboratory certificates ...............................60
11 Appendix 5 -
Groundwater Management Plan................61
12 Appendix 6 -
Jacobian plots .62
..........................................
10838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 7
Page 9
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
LIST OF DRAWINGS I FIGURES
DRAWING NO. DESCRIPTION
10838.3.1 Site location
10838.3.2 Groundwater monitoring locations
10838.3.3 Soil map
10838.3.4 Pre-development groundwater contours
10838.3.5 Developed site groundwater contours
10838.3.6 Development impact
10838.3.7 Sea level rise groundwater contours
10838.3.8 Sea level rise impact
8 AGRICULTURE WATER ENVIRONMENT
Page 10
+GILBERI www.access.gs
SlJT1-ERI.
Residential lots (Precinct F,G) 164
1 Introduction
Total 490
Hofmann Land
Northbrook Corporation Pty Ltd commissioned
Townhouses (Precinct H) 24
Gilbert & Sutherland Pty Ltd (G&S)to prepare a
conceptual Groundwater Assessment and Residential lots (Precinct H) 52
Management Plan for the proposed Noosa on Residential lots (Precinct I) 203
Weyba development, Noosaville, Queensland.
Rural residential lots 1
Drawing No.1 0838.3.1 shows the site location.
Special residential (Precinct K) 6
1.1 Background Retirement cottages 100
Whilst seven allotments of land make up the site,
Total 386
development is proposed only on Lot 2 on
SP179590, Lot 53 on SP163571, Lot 11 on
RP893393 and Lot 12 on RP893393. Under a
Subdivision to create new lots/land parcels for
future development.
Biodiversity Development Offset Area (BDOA)
agreement, the remaining lots (being Lot 7 on Bulk earthworks where required
RP46782, Lot 2 on RP160983 and 1667 on Construction of internal roads and
M37772 -
a total area of 139.5ha) will be excluded connections with existing roadways
from the development area and dedicated to the
Construction of stormwater and sewer
Noosa National Park as high to medium value
infrastructure.
Koala habitat.
It is understood that the majority of the 1.3 Scope of works
investigation area has historically been used for The scope of work undertaken for the
agricultural purposes, specifically livestock groundwater assessment included:
grazing. A review of previous site investigations.
A review of relevant, available, current and
1.2 Proposed development
historical aerial photographs, topographic
The draft master plan for the Noosa on Weyba
maps and LlDAR data.
development proposes the creation of various
A site inspection to locate and examine
rural and residential precincts across the 163ha
existing groundwater bores.
development area. A breakdown of the proposed
Construction of six (6)additional bores in
development is provided in Table 1.2.1. The
selected locations across the developable
proposed development would include:
area of the site.
Table 1.2.1 Indicative site yields Groundwater monitoring across the entire
Product Estimated bore network (13existing, 6 new).
I dwellings Full laboratory analysis across the monitoring
Northbrook land bore network (one round).
Premium residential lots 73 Monitoring for in-situ parameters including
groundwater level across the monitoring bore
Apartments / Mixed use 50 (est.)
network (8 rounds).
Retail (600 m2) Development of a conceptual groundwater
Townhouses 83 model using Visual MODFLOW Pro to
characterise groundwater levels, velocities
Retirement villas/Aged care 120
and flow direction.
1 0838_GWA_ELH2F.DOCX / NOOSA ON WEYBA / NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 9
Page 11
www.ac
+GILtEHI
ss.gs
SUT1-ERI.AN)
Scenario testing to predict the likely impact of using the conceptual groundwater model,
the proposed development on the predict the likely impacts of the proposed
groundwater environment. development on the groundwater
environment.
Preparation of a conceptual groundwater
assessment report.
1.5 Standards and guidelines
Preparation of a conceptual groundwater
The following standards and guidelines were
management plan.
referenced in the process of preparing the
This report is divided into sections describing the
Conceptual Groundwater Assessment and
method, the resultant site physical characteristics
Management Plan.
and monitoring observations, an assessment of
the reported groundwater conditions at the site Middlemiss, H., 2000. Murray Darling Basin
and modelling of the impact of the development Commission Groundwater Flow Modelling
Guideline Aquaterra Consulting Pty Ltd
proposal, followed by a discussion of results,
recommendations and conclusions. Project No 125 16 January 2001.
State of Queensland (Department of
1 .4 Aims and objectives Environment and Resource Management),
2012. Queensland Coastal Plan -
State
The purpose of this groundwater assessment is to
Planning Policy 3/11: Coastal Protection.
characterise the existing groundwater
conditions at the site
prepare a conceptual groundwater model that
reflects the existing groundwater
characteristics of the site and
10 AGRICULTURE WATER ENVIRONMENT
Page 12
.!lI11 800 1’..11111 16001 Brisbane Sydney Melbourne and regions
SCALE metres
A
ORIENTATION
NORTH
LEGEND
Agriculture. Water. Environment.
_ investigation
Site area
_ Biodiversity agreement
offset area
SOURCES
Image base:
Google Earth Pro, 21 June 2012
Investigation and biodiversity offset areas:
Queensland Government Gazette No.27, Growth
Management Queensland, Map 1 Noosa on
-
Weyba Biodiversity Development Offset Area,
Declaration Area, 3 February 2011
PROJECT
GROUNDWATER ASSESSM ENT
NOOSA ON WEYBA
QUEENSLAND
rlb&sa
on weyba
CLIENT
NORTHBROOK
CORPORATION
DRAWING
SITE LOCATION
AND LOT PLAN
SCALE DRAWN CHECKED
1:32000@A3 DJY/SPD EJR
ROBINA
DATE PROJECT NO DRAWING NO
PO Box 4115 Robina QLD4230 0755789944 22/05/2012 10838 3.1
Email [email protected] www.access.gs
Page 13
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
the north. The north-eastern portion of the site is
2 Site description
bounded by Eenie Creek. The eastern portion of
the site (Lots 11 and 12) is bounded by Tidswell
Road to the west, Old Hollet Road to the North
2.1 Property description
and Lake Weyba to the east.
The site is approximately 164ha in area and is
described as Lot 2 on SP179590 and Lot 53 on A summary of the site description including its
SP163571 Parish of Tewantin County of March; location within the Noosa Shire of Queensland is
and Lots 11 and 12 on RP893393, Parish of presented in Table 2.1.1.
Weyba County of March.
2.2 Geology
The western portion of the site (Lots 2 and 53) is
bounded by Hollett Road to the south, rural A review of the Geological Survey of Queensland
residential land to the west, the proposed BDOA 1 :100,000 Geology Series Map No 9543
land (Lot 2 on RP160983 and Lot 1667 on CP (Brisbane)indicates that the site forms part of the
M37772) to the north east and residential land to Tiaro Coal Measures of the Duckinwilla Group
..
. -
1- ..
Site Address: Hollett Road, Noosaville, Queensland, 4566
Title Identification Details: Lot 2 on SP179590, Lot 53 on SP163571 Lot 11 on RP893393 and Lot 12 on
,
RP893393
Site Ownership: Northbrook Corporation Pty Ltd, Starbrite Investments Pty Ltd, Godfrey and
Jennifer Mantle and John and Kathleen Hofmann.
Current Zoning: Rural and rural settlement
Future Zoning: Residential
Current Site Use: Livestock grazing
Proposed Site Use: Residential
Total Investigation Area: Approximately 163 hectares (ha)
Site Buildings: One (1)storage shed and 1 holiday house
Assessment Area: Lot 2 on SP179590, Lot 53 on SP163571, Lot 11 on RP893393 and Lot 12 on
RP893393
Surface Condition: Pasture grass cover
Adjacent Properties: Residential premises and residential development land are located
adjacent to the northern site boundary.
The Noosa Airport is situated to the north-east of the site.
Rural residential estates border the sites western boundary
Lake Weyba borders the far eastern boundary of the site.
The Weyba Nature Refuge is located to the southeast of the site.
Nearest Surface Water Lake Weyba is the nearest major water body to the site and is located
Body: adjacent to the eastern boundary of Lot 11 and Lot 12 on RP893393. Lake
Weyba is a shallow tidal lake, which drains through Weyba Creek into the
Noosa River. Eenie Creek, which flows directly into Lake Weyba forms the
northern boundary of Lot 53 on SP163571. Keysers Creek (an ephemeral
creek) flows through the low-lying western portion of Lot 11.
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 11
Page 14
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
and is underlain by lithofeldspathic labile and cover is abundant across most areas of the site.
sublabile to quartzose sandstone, siltstone, shale, Small clusters of trees (remnant and regrowth
coal, and ferruginous oolite marker beds. This has species) are scattered throughout the site, with
been lateritized in part on the western portion of more dense bush land located to the east and
Lot 11 and the majority of Lots 2 and 53. A veneer west of Lot 53 on SP163571. The dominant tree
of Quaternary flood plain alluvium exists in the species are Acacia spp., Melaleuca spp. and
lower lying areas of Lots 2 and 53 and on the Eucalyptus spp. Plate 1 shows a representative
lower terrace adjacent to Lake Weyba on Lots 11 areatypical of the site vegetation, dominated by
and 12. grasses with scattered Eucalyptus spp.
2.3 Topography The DERM Regional Ecosystem (RE)mapping for
the site indicates the following REs associated
The site topography is mostly level to gently
with the site:
inclined (<1% to 5%)with some moderate to
12.5.3 E. tindaliae and/or E. racemosa open
steep slopes associated with the eastern
forest on remnant tertiary surfaces. This RE is
boundary fronting Lake Weyba. The site elevation
ranges from <2.5m AHD to 20m Australian Height present in the western and central south-
Datum (AHD). eastern portions of Lot 53 and the central and
south-eastern portions of Lot 11 .
Lot 2 on SP179590 and Lot 53 on SP163571 are
12.3.5 Melaleuca quinquenervia open forest
dominated by a centrally located hill (up to 20m
on coastal alluvium. This RE is present in the
AHD) with low lying areas located at the base, to northern half of Lot 2 and the central western,
the north, east and west. Low lying areas are
south-eastern and north/north-eastern
located towards the south-west portion of Lot 11
portions of portions of Lot 53.
on RP893393 and towards the eastern site
12.3.4 M. quinquenervia, E. robusta open
boundary of Lot 11 on RP893393 and Lot 12 on
forest on or near coastal alluvial plains. This
RP893393, adjacent to Lake Weyba.
RE is present in the south-eastern portion of
Lot 53.
2.4 Drainage
The elevated portions of the site are
generally well drained, due largely to the
predominantly friable nature of the soils
and the gentle slopes. Some low-lying
areas are poorly drained due to their low
relief and the clayey texture of their
subsoils.
An ephemeral creek, known as Keysers
Creek, flows through the low-lying
western portion of Lot 11 on RP893393.
No flow was detected at the time of the
site inspection. A dam in the western
portion of Lot 11 on RP893393 intercepts
water flowing through Keysers Creek.
2.5 Vegetation
The site has been extensively cleared of Plate 1 View to the east (toward Lake Weyba) from within the
native vegetation to facilitate agricultural bounds of Lot 11 on RP893393, showing typical vegetation
grazing, primarily by cattle. Short grass within the investigation area
12 AGRICULTURE WATER ENVIRONMENT
Page 15
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
12.3.11 E. siderophloia, E. tereticornis, 2.7 Surrounding land use
Corymbia intermedia open forest on alluvial
The surrounding land use is summarised as
plains usually near the coast. This RE is
follows:
associated with the north-eastern portion of
Lot 53. Bordering the site directly to the north is a
residential development.
2.6 Current land use
The Noosa airport is located to the north-east
At the time of preparing this report, the site was of the site.
being used primarily for livestock grazing. An Lake Weyba is located to the east of the site,
existing storage shed was identified near the on the eastern boundary of Lot 11 and Lot 12
eastern boundary of Lot 53 on SP163571. The on RP893393.
shed is likely to have been used for the storage of
Eenie Creek, which flows directly into Lake
vehicles, agricultural machinery and livestock
Weyba, forms part of the northern border of
feeds. A number of dams are located throughout
the site.
the site. These dams are currently used for stock
watering purposes. Vegetated private and public land (including
Lake Weyba Nature Reserve) is located to the
A former livestock dip and associated structures, south and south-west of the site.
was located in the central portion of Lot 53 on
SP163571. The dip was demolished and
remediated between November 2007 and January
2008 and facilitated the removal of the lot from the
Environmental Management Register (EMR).
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 13
Page 16
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
Cardno June 2012. ’Geotechnical
3 Method
Investigation, Noosa on Weyba Master Plan
Development’.
An overview of the scope and methods adopted to
3.2 Groundwater monitoring bore
complete this study are briefly outlined below:
network
A desktop assessment of relevant, available,
A total of 15 groundwater bores were previously
current and historical aerial photographs,
constructed across Lot 53 on SP163571 by
topographic maps and LlDAR data.
Golder Associates in 2007. A number of bores
A site inspection to locate and examine
have since been damaged or destroyed and our
existing groundwater bores. initial site inspection located a total of 13
Construction of six (6)additional bores in remaining bores suitable for groundwater
selected locations across the developable monitoring. No existing groundwater bores were
area of the site. located on Lot 11 on RP893393.
Groundwater monitoring across the entire
To supplement the existing monitoring bore
bore network (13existing, 6 new).
network on Lot 53 and establish a monitoring
Full laboratory analysis across the monitoring network on Lot 11, G&S installed a total of six (6)
bore network (one round). additional groundwater bores. The groundwater
Monitoring for in-situ parameters including bores were located to achieve the following:
groundwater level across the monitoring bore Supplement the existing groundwater
network (6 rounds).
monitoring network at the site
Development of a conceptual groundwater Assess the influence of site stratigraphy on
model using Visual MODFLOW Pro to
groundwater quality and flow
characterise groundwater levels, velocities
Facilitate collection of a data set upon which
and flow direction.
to base an initial groundwater model
Scenario testing to predict the likely impact of
Increase reliability of groundwater calculations
the proposed development on the
and modelling.
groundwater environment.
Drilling was conducted by Gilbert & Sutherland
3.1 Desktop assessment Pty Ltd using a Wirth 10s drilling rig. Boreholes
The following reports and information were (1OOmm diameter) were drilled to a maximum
considered as part of this report: depth of 6 metres below NSL.
Golder Associates Pty Ltd, ’Geo-
Monitoring wells were constructed and installed in
Environmental Investigation Proposed Lot
accordance with the Minimum Construction
Reconfiguration Lot 53 on SP163571, Hollett
Requirements for Water Bores in Australia.1
Road Noosaville’, Queensland, Version 1.0,
Machine-slotted well screens, casing and end
July 2010.
caps were constructed using PN 9 PVC-U
Gilbert & Sutherland Pty Ltd, ’Effluent pressure pipe and secured by threaded joints. The
Disposal and Stormwater Assessment, inside diameter of each well was 50mm to allow
Proposed Windsong Resort and Spa for development and sample collection using a
Development, Noosa’, September 2002. stainless steel bailer.
Sunshine Coast Regional Council Land
Information Services, L1DAR Data.
Geological Survey of Queensland 1 :100,000 1
Minimum Construction Requirements for Water Bores in
Geology Series Map No 9543 (Brisbane).
Australia, Edition 3 (2012). National Uniform Drillers Licensing
Committee.
14 AGRICULTURE WATER ENVIRONMENT
Page 17
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
Table 3.2.1 Groundwater bore survey details
I Borehole Constructed by I Easting Northing Elevation RL (m)AHD
GW1 G&S 504944.7 7076954.6 3.3
GW2 G&S 504873.4 7077157.7 7.3
GW3 G&S 505091.2 7077233.5 3.2
GW4 G&S 505168.1 7076251.9 1.3
GW5 G&S 505859.6 7076305.3 10.8
GW6 G&S 506024.9 7076366.1 3.5
BH4 Golder & Assoc. 503897.5 7076626.9 6.7
BH9 Golder & Assoc. 503957.3 7076821.1 6.3
BH20 Golder & Assoc. 503983.3 7077074.7 6.6
BH23 Golder & Assoc. 503908.6 7076930.8 8.2
BH26 Golder & Assoc. 503862.5 7076799.9 8.3
BH28 Golder & Assoc. 503802.9 7076701.9 7.9
BH30 Golder & Assoc. 504069.8 7076638.8 6.8
BH40 Golder & Assoc. 504394.7 7076992.9 7.5
BH43 Golder & Assoc. 504463.8 7077119.3 9.0
BH45 Golder & Assoc. 504555.1 7077185.3 7.4
BH48 Golder & Assoc. 504658.2 7077369.6 4.2
BH58 Golder & Assoc. 504374.8 7076844.6 14.7
BH65 Golder & Assoc. 504315.7 7076626.3 12.9
The gravel pack surrounding the well screens conducted on each monitoring occasion with
consisted of washed, inert, 1.8-3mm river sand. A levels initially measured as depth from the top of
filter sock was placed over the screened section the monument and later converted to RL m AHD.
of the wells. Bentonite pellets were placed above
the gravel pack at a thickness of at least 200mm Prior to collection of samples for water quality
and hydrated for at least 3hrs to promote swelling. analyses groundwater bores were purged and
A minimum 200mm of cement grout was then allowed to recharge. Recharge rates were slow at
a number of locations requiring sample collection
placed over the bentonite and a lockable Steel
monument (100x1 OOmm)was concreted in place to be undertaken the following day.
over the well-head for protection. The well-head
Insitu analyses was undertaken on a total of 6
stickup (from NSL) wasgenerally 750mm in
occasions. Collected groundwater samples were
height. The borelogs are attached as Appendix 2.
ana lysed insitu for pH, temperature and electrical
JFP Urban Consultants surveyed the location and conductivity. Full laboratory analyses was
elevation of each bore in May 2012. The results of undertaken on one (1)occasion with samples
analysed for major cations (calcium, magnesium,
the survey are provided in Table 3.2.1. The
location of each of the bores is shown on Drawing sodium, potassium) and anions (chloride, sulfate,
No. 10838.3.2. alkalinity) and total and dissolved metals
(aluminium,arsenic, cadmium, chromium, copper,
3.3 Groundwater monitoring nickel, lead, zinc and iron. Samples were
collected in laboratory-supplied containers and
Monitoring of groundwater levels and quality was
transported in a chilled esky to a NATA-accredited
undertaken on a number of occasions to
laboratory for sample analysis.
characterise groundwater at the site and to inform
preparation of the conceptual groundwater model. 3.4 Site soil permeability
A total of 6 rounds of groundwater monitoring To assist in the set-up of the MODFLOW model,
were conducted at the site from March to June permeability testing of the soils surrounding each
2012. Groundwater level monitoring was of the groundwater bores was undertaken using
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 15
Page 18
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
the Rising Head and Falling Head Test Methods. Commission ’Groundwater Flow Modelling
A Rising Head test was conducted at GW4 whilst Guidelines’ (Middlemiss,32000).
Falling Head tests were conducted at GW1, GW2,
GW5, BH20 and BH58. The rising and falling 3.5.2 Model domain
head tests were conducted in accordance with the The model grid was orientated at azimuth 00 in a
methods outlined in Cedergren (1997).2 northern alignment, comprising 68 columns over
approximately 3,400m by 47 rows over
3.5 Groundwater model development approximately 2,350m with a total of 3196 cells. In
plan view, the grids comprised uniform cells of
The groundwater modelling consisted of four
50m x 50m. The thickness of the cells was
activities:
defined by the topography based on the digital
Pre-development groundwater level and flow terrain model (forming the top of the cells) and the
directions. basement (to maintain simplicity within the steady
Construction-phase groundwater impacts. state model) was set at -1 OmAHD.
Post development groundwater impacts.
3.5.3 Topography
The onsite surface grid was interpolated from a
3.5.1 Software
series of LlDAR tiles for the site area and
The modelling package selected for this
surrounds. The data was interpolated using
assessment needed to:
Maplnfo to create a contiguous grid suitable for
be able to assess the effect on groundwater import into the MOD FLOW model space.
levels and flow regimes as a result of
development 3.5.4 Stratigraphy
simulate 3D groundwater flow in a site The model requires the input of stratigraphic
exhibiting variable stratigraphy (layer)data together with the hydrogeological
properties of the layer(s).
provide a basis for future decision making and
alterations with the inclusion of new data This information was obtained from the drilling
be an industry accepted groundwater program as part of the following investigations:
modelling tool. Gilbert & Sutherland Pty Ltd, ’Effluent
Disposal and Stormwater Assessment,
To achieve these requirements groundwater
Proposed Windsong Resort and Spa
modeling was undertaken using Visual
Development, Noosa’, September 2002.
MODFLOW 2010 (McDonald and Harbaugh,
Golder Associates Pty Ltd, Geo-
1988) the United States Geological Survey
Environmental Investigation Proposed Lot
(USGS)three-dimensional finite-difference
groundwater flow model. Reconfiguration Lot 53 on SP163571, Hollett
Road Noosaville, Queensland, Version 1.0,
MODFLOW is a modular groundwater resources July 2010.
package with components for predicting Gilbert & Sutherland groundwater bore
subsurface flow and simulating the effects of
construction program April 2012 -
Borelogs
wells, rivers, drains, head-dependent boundaries, included in Appendix 2.
recharge and evapotranspiration. The data
Gilbert & Sutherland Pty Ltd Good Quality
requirements of the constructed model are
described in the following sections. Agricultural Land and Strategic Cropping Land
Assessment, Noosa on Weyba Development,
The groundwater model was developed with Weyba Downs, Queensland.
reference to the Murray-Darling Basin
3
Middlemiss H 2000 Murray_Darling Basin Commission
2
Cedergren H.R. 1997 Seepage drainage and flownets, Wiley Groundwater Flow Modelling Guideline Aquaterra Consulting
professional series London. Pty LId Project No 125 16 January 2001.
16 AGRICULTURE WATER ENVIRONMENT
Page 19
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
The stratigraphy of the site is represented in the Cook’s method5 is based on the chloride balance
groundwater model by one layer comprising silty between the rainfall and the groundwater. The
clays. The top of this layer was defined by the proportion of groundwater recharge in excess of
LlDAR data and ranges from -1 m RL AHD to the landscape environmental requirements is
-24m RL AHD. The thickness of the layer was reflected by the ratio between the rainfall chloride
interpolated from data obtained during the drilling concentration and the groundwater chloride
programs listed above. concentration.
The general formula is:
3.5.5 Boundary conditions
Lake Weyba located to the east of the
G =
(P*Cp)-(R*Cp)
development on the border of Lot 1667 on
M37772 and Lot 11 on RP893393 was modeled
Cg
as a ’Constant Head’ boundary. Constant Head
boundaries act as an infinite source of water Where:
entering the system or as an infinite sink for water
leaving the system. G = ground water recharge (mm)
For the steady-state model, the water level within P =
precipitation (mm)
Lake Weyba was fixed at a level of 0.2m AHD.4
R = run-off (mm)
Water level information was not readily available
Cp = Chloride conc. of rainfall (mg/L)
for Eenie Creek and the smaller tributary draining
to Lake Weyba located just south of Eenie Creek.
Cg = Chloride conc. of groundwater (mg/L)
Water levels were assumed to be consistent with
Lake Weyba and were found during the calibration Within the site, spatial variability of the Chloride
trials to provide a good fit with the measured concentrations may have impact on the
groundwater results at the site. distribution of recharge on the site (Cook 1989
and de Si Iva 2004).
The southern and western bounds of the model
were located to coincide with catchment divides. The estimate of rainfall cr concentration was
determined from three sources. The first estimate
3.5.6 Recharge and evaporation was undertaken using data from sampling of a
The average annual rainfall used during the
rainfall event at Robina, Queensland. The sample
calibration was equivalent to 1 ,736mm/year. This
site was within 5km of the ocean and at a similar
value was based on an analysis of the daily
altitude to the site. The rain was collected and
rainfall data set spanning 1 January 1889 to 19
sent to a laboratory for analysis of major anions
April 2012 and was assumed to be spatially and cations. The rainfall sample indicated a
constant across the site.
Chloride concentration of <3 mg/L.
The average annual evaporation used during the
The second estimate was based on the work by
model calibration (based on the same data set as
Biggs 20046 who measured the chloride
above) was 1 ,302mm/year and was also assumed
to be spatially constant across the site. An 5
Cook P. G., Walker, G. R and Jolly, I. D., (1989). Spatial
extinction depth of 1.0m was used. Variability of Groundwater Recharge in a Semi-Arid Region.
Journal of Hydrology, 111: 195-212.
de Silva RP. 2004 Spatial Variability of Groundwater
The estimate of the historic groundwater recharge
Recharge I. Is it really variable? Journal of Spatial Hydrology
-
for the site was undertaken using Cook’s Method. Vol.4, NO.1 Fall 2004.
6
Biggs A.J.w. 2004 Rainfall salt loads in southern
4
Queensland, Australia Proceedings ISCO 2004 13th-
Water Studies Pty Ltd, 2001. Flooding in the Noosa River International Soil Conservation Organisation Conference _
Catchment, Noosa Council Strategic Planning Aug 1995 Brisbane, July 2004. Conserving Soil and Water for Society:
(Update Feb 2000, June 2001). Sharing Solutions Paper No. 680.
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 17
Page 20
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
concentrations in rainfall at various locations sewage effluent disposal to land, it contains a
throughout southern Queensland. Biggs water balance component which considers:
developed a mathematical description based on a effluent applied (in this case none)
Power function (y=axc)of the relationship
precipitation
between rainfall chloride load and distance from
the sea. Whilst noting that these types of evapotranspiration
equations are extremely unreliable, a quadratic drainage (recharge)
equation? was developed to describe expected surface runoff
rainfall cr concentration using the inputs of mean
data from Biggs work and distance from the sea. Based on the MEDLI model, average runoff was
The intercept of this equation was 5.28 mg/L cr estimated to be approximately 0.2. The recharge
(95%confidence interval + 0.95 mg/L Cll estimates gained from using Cooks Method were
also compared with the drainage (recharge)
Although the derivation of the quadratic estimates obtained from the MEDLI model.
mathematical description from this data set was
not the intent of the original researcher, in the 3.5.7 Hydraulic characteristics
absence of any other data it is reasonable to use The aim of assigning aquifer parameters to the
this information to inform the estimate of the model is to ensure the simplest representation of
expected rainfall Chloride concentration. the actual hydrological regime. Whilst permeability
was measured on site, specific yield and porosity
The final source of the rainfall Chloride
in the initial model set up were based on a range
concentration estimate was derived from
derived from various texts. These are presented in
laboratory analysis of water quality from a Table 3.5.7.1.
freshwater spear pump bore in the frontal dune at
Burleigh Heads, Queensland. Again, for the Table 3.5.7.1 Porosity and yield ranges used for
purpose of the assessment, this sampling location calibration & modell
is sufficiently similar to the subject site.
The water analysis indicated the CI’ concentration
of the freshwater lens (above the salt water table)
was 7.1 mg/L cr. The only source of recharge is
rainfall and this chloride concentration suggests 3.6 Calibration
that the rainfall concentration is some number less
The model was calibrated under steady state
than 7.1.
conditions to obtain an approximation of the site’s
Based on these data the boundaries for analysis groundwater regime.
of potential recharge may be derived, in this caseB
as between 3.01 to 6.1
3.7 Sensitivity
mg/L cr.
To further assess and quantify the inherent
The run-off component of the recharge estimate
uncertainty in the model calibration process, a
equation was derived using the CRC for Waste sensitivity analysis was undertaken. The aquifer
Research/QDPI Model for Effluent Disposal by
parameters were assessed using the WINPEST
Land Irrigation (MEDLI)software. Although the
software to rank in order of greatest effect on
model is designed to assess the impact of calibrated model outcome.
?
Y = 2*10.5 *x2 0.0171 X + 5.28 (R2= 0.5666, standard error
.
3.8 Model limitations
of the estimate = 0.8) where Y = expected rainfall CI-
concentration mg L.1 and X = distance from mean high water The groundwater model described in this report is
in kilometres.
B
limited by the constraints of the Visual MODFLOW
This upper value corresponds to the estimate using Briggs
model itself (which are well known in the industry)
data for a site 6 km from the sea (5.3)plus the standard error
of 0.8 to give a maximum of 6.1 mg CI" L". as well as by the quality and availability of input
18 AGRICULTURE WATER ENVIRONMENT
Page 21
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
data. Nonetheless, G&S believes the current services trenches) during the construction phase,
model for this groundwater assessment is sound was calculated using the following equation:
in that it is accurate within the limitations of the
data and assumptions used in developing it. Q=KiA
Where:
3.9 Construction phase groundwater
impacts Q = volumetric flow rate (m3/day)
Groundwater drawdown associated with
K = hydraulic conductivity; (m/day)
excavations (i.e. installation of services and
removal of material) was estimated using
i = hydraulic gradient; (m/m)
Hooghoudt’s Equation -
a steady-state drainage
formula used to estimate head losses due to A = cross sectional area of the dewatered
horizontal and radial flow. While primarily used to
pit (m2)
estimate drain spacing, it also provides a useful
indicator of likely groundwater drawdown given 3.10 Post development groundwater
theoretical inputs such as:
impacts
inflow rates,
Following calibration and sensitivity analyses, the
hydraulic conductivities, model was altered to represent the developed site
scenario as described in Section 1.2 and depicted
depth of drain below surface, and
on the Masterplan for the Noosa on Weyba
allowable rise in water surface.
development provided in Appendix 1.
Hooghoudt’s Steady State Formula is shown
Development of the site will involve the removal of
below:
vegetation, installation of stormwater treatment
devices and the construction of buildings and
hardstand areas throughout the site. Each of
L2 8K2dh 4K,h2 these activities has the ability to impact upon the
+
q q characteristics of groundwater recharge and
evapotranspiration. To represent the likely
groundwater impacts associated with the
where:
development, groundwater recharge and
evapotranspiration were modified to reflect the
q = Inflow rate (mm/day)
likely reduction in recharge/evapotranspiration in
hardstand areas and the likely increase in
K1 = Hydraulic conductivity -
pipe to surface
(m/day) recharge in the vicinity of stormwater treatment
devices.
K2 = Hydraulic conductivity- below pipe
(m/day) 3.11 Sea level rise
The Noosa on Weyba development is located
d =
Depth of drain below surface (m)
within the Coastal Zone and Coastal Management
h = Allowable rise in water surface between District as defined by the Queensland Coastal
drains (m) Plan 2012. Parts of the site have also been
classified by the QCP as Coastal Hazard Areas
L = Estimated spacing between drains (m) that may be subject to:
erosion risk due to storm impact and long term
The seepage estimate or Darcian Flow Rate (the
trends of sediment loss and channel migration
potential inflow rate) associated with dry
excavation (bulk earthworks and excavation of
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 19
Page 22
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
permanent inundation of land due to sea level
rise
storm tide inundation of both ’High’ (>1m
water depth) and Medium (<1 m water depth)
hazard.
Under the ’State Planning Policy 3/11 : Coastal
Protection’, developments proposed within
Coastal Hazard Areas must consider the relevant
projected impacts of climate change. In this
instance it is relevant to consider the projected
impact of sea level rise, defined by the OCP as a
default value of 0.8m by 2100.
20 AGRICULTURE WATER ENVIRONMENT
Page 23
PROJECT CLIENT DRAWING BRISBANE Brisbane
A Sydney
20/115 Wickham Street Melbourne
ORIENTATION Subject site G&S groundwater Golder Associates
NORTH boundary
.
bore
.
bore NOOSAON NORTHBROOK GROUNDWATER PO Box 694 and regions
Fortitude Valley Q4006
WEYBA CORPORATION BORE HOLE
DEVELOPMENT PTY LTD LOCATIONS Phone 07 3852 3999
SCALE Fax 07 3852 3933
1:6750
[email protected]
1,111 200 1,1,1 SCALE DATE DRAWN CHECKED PROJECT NO DRAWING NO
metres I 1:6750 26/09/2012 AAK GLH/PLM/ELH 10838 10838.3.2 www.access.gs AGRICULTURE WATER ENVIRONMENT
Page 24
LEGEND I PROJECT CLIENT DRAWING Brisbane
BRISBANE
A - -
Sydney
c
20/115 Wickham Street
ORIENTATION
NORTH
GQAL bore
locations RDevelopment
area boundary
Grey
Dermosols
Yellow
Kandosols
-
~
-
Yellow
Kurosols NOOSAON NORTHBROOK SOIL PO Box 694
Fortitude Valley Q4006
Melbourne
and regions
WEYBA CORPORATION CLASSI FI CATION
SCALE
.
Observation
points Ii Spolic
Anthroposols
Brown
Dermosols
Grey
Kandosols
::
==
Grey
Kurosols DEVELOPMENT PTY LTD Phone 07 3852 3999
Fax 07 3852 3933
1:6750
Subject site Yellow [email protected]
100~ 300
metres
boundary Dermosols
Red
Dermosols ~1II1I1 Yellow-Orthic
Tenosols
Red
Chromosols SCALE
1:6750
DATE
26/09/2012
DRAWN
AAK
CHECKED
GLH/PLM
PROJECT NO
10838
DRAWING NO
10838.3.3 www.access.gs AGRICULTURE WATER ENVIRONMENT
Page 25
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
4.2.2 Electrical conductivity
4 Results
Throughout the monitoring period, the results for
electrical conductivity (EC)ranged from
4.1 Groundwater level 0.06IlS/cm at BH58 on 27 March 2012 to
0.64IlS/cm at both GW2 and GW5 on 13 April
Throughout the monitoring period, groundwater 2012. Mean results were indicative of a freshwater
level has varied moderately across the bore environment, and were below 0.62IlS/cm across
network. The largest range in level was recorded the bore network.
at BH58 (1.73m to 2.93m from the top of the
monument). The largest range in EC was recorded at GW2
(0.56IlS/cm to 0.64IlS/cm) and BH58 (0.06IlS/cm
Generally, the highest levels have been recorded to 0.12IlS/cm).
following periods of heavy rain. For example, 5
out of 6 monitored bores were at their highest 4.2.3 Dissolved metals
level during sampling in late March, following a The concentrations of dissolved metals were
month of constant rain and three discreet events generally consistent across the bore network, with
of over 80mm. The majority of remaining bores limited variation between bores.
were at their highest level during sampling in early
June, following a rain event of 85mm. The largest range in dissolved metal
concentration was recorded for iron, which ranged
4.2 Groundwater quality from <0.05mg/L at BH28 to 5.19mg/L at GW2.
The average concentration was 1 .3563mg/L
The analytical and insitu results for samples
across the bore network.
recovered from the Lake Weyba development site
are discussed in this section. Attached are
The concentration of dissolved aluminium ranged
complete results tables for each parameter from <0.01 mg/L at BH45 to1.0mg/L at GW1. The
(Appendix 3) and copies of the laboratory average concentration was 0.16mg/L across the
certificates and in situ sheets (Appendix 4). bore network.
The location of the monitoring bores is shown in The concentration of dissolved cadmium ranged
Drawing NO.1 0838.3.2. from <0.0001 mg/L at the majority of locations to
0.001 mg/L at GW5. The average concentration
4.2.1 pH was 0.0002mg/L across the bore network.
Throughout the monitoring period, the results for
pH ranged from 2.8 at BH23 on 14 April 2012 to The concentration of dissolved chromium ranged
14.58 at GW4 on 7 June 2012. Mean results from <0.001 mg/L at the majority of locations to
across the bore networkranged from 5.09 at 0.002mg/L at BH4. The average concentration
BH23 to 9.14 at GW4. The largest range in pH was 0.0011 mg/L across the bore network.
was recorded at GW5 (4.82 to 13.38) and GW4
(6.37to 14.58). The concentration of dissolved copper ranged
from <0.001 mg/L at numerous of locations to
pH results were generally higher in the final round 0.018mg/L at GW5. The average concentration
of monitoring with an average of 9.62 calculated was 0.0035mg/L across the bore network.
across the bore network, compared with averages
of 4.25 and 5.11 in the rounds immediately The concentration of dissolved nickel ranged from
0.001 mg/L at BH28 and BH48 to 0.048mg/L at
preceding. Given the pH trend over the first five
rounds and the illogical results recorded during BH4. The average concentration was 0.0011 mg/L
the final round of monitoring, equipment failure across the bore network.
was suspected and the final round pH results
The concentration of dissolved lead ranged from
were excluded from the data set on the basis of
<0.001 mg/L at numerous of locations to
error.
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 21
Page 26
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
0.009mg/L at BH9. The average concentration Sutherland in the report Good Ouality Agricultural
was 0.0024mg/L across the bore network. Land and Strategic Cropping Land Assessment
for the Noosa on Weyba development:
The concentration of dissolved zinc ranged from
0.02mg/L at BH28 to 0.742mg/L at GW5. The i. Dermosols
average concentration was 0.1731mg/L across
the bore network. ii. Kandosols
iii. Chromosols
4.2.4 Major cations and anions
Major cations (calcium, magnesium, sodium and iv. Kurosols
potassium) and major anions (chloride, sulfate
and alkalinity) are measured to allow for statistical v. Tenosols
analysis of the data set, and to allow for an ion
balance to be undertaken to check quality These soil classifications broadly agree with the
assurance of laboratory results. soil types assigned by the Horticultural Report
(Capelin, 1987), namely yellow earths and yellow
The ionic balance of the water sampled from the and red podzolic soils. Drawing NO.1 0838.3.3
majority of bores across the Lake Weyba shows the soil map produced for the site based on
development site was satisfactory (i.e less than this assessment.
5%9). In the bores where the ionic balance
exceeded 5% (BH4,BH23 and BH26), anions 4.3.1 Dermosols
were dominant. These are soils other than Vertosols, Hydrosols,
Calcarosols and Ferrosols that have B2 horizons
The Piper and Durov diagrams (shown in figures
with a structure more developed than weak
3.3.1.1 and 3.3.1.2, respectively on the following
throughout the major part of the horizon and do
pages) show the majority of bores in the Lake not have clear or abrupt textural B horizons.
Weyba development area are very similar in their
proportions of cations and anions. BH45, BH4, On the subject site, these soils were associated
GW4 and BH23 appear slightly different to the ion with boreholes GOAL 1, GOAL5, GOAL7, GOAL9,
mix of the other bores. These bores are located in GOAL 10, GOAL 11, GOAL 12, GOAL20, GOAL21,
wetland areas, which would influence the ionic GOAL22, GOAL25, GOAL26, GOAL27, GOAL30
composition of their groundwater. Generally, and GOAL31 and were characterised
sodium and chloride dominate the water’s predominantly by a very dark brown (10YR 2/2) to
chemistry. very dark greyish brown (1OYR 3/2) sandy clay
loam to light clay A horizon, overlying a brownish
GW1, GW2, GW4, GW5 and GW6 recorded
yellow (1 OYR 6/8) and red, grey and brown
higher concentrations of TDS (mg/L)then the mottled heavy clay loam, sandy to heavy clay B2
other bores. These high concentrations of TDS
horizon with moderate angular blocky to
are most probably linked to the higher turbidity
subangular block structure. Based on physical
results recorded for these bores.
and chemical attributes of the soils encountered,
the Dermosols were further classified as follows:
4.3 Soil description and classification
Acidic-Mottled or Melanic-Mottled,
The following five soil orders, after (Isbell, 2002 ),
Mesotrophic or Dystrophic, Yellow Dermosols;
were identified and reported by Gilbert &
Melanic-Mottled, Mesotrophic or Dystrophic,
Grey Dermosols; and
9
Steel, A. and Whitfield, C.P. (1996)’Chapter 14 Use and
-
Acidic-Sodic, acidic-mottled or Melanic-
Reporting of Monitoring Data’ in Water Quality Monitoring A
-
Practical Guide to the Design and Implementation of Mottled, Dystrophic or Magnesic, Brown
Freshwater Quality Studies and Monitoring Programmes. Eds. Dermosols.
Jamie Bartram and Richard Balance. UNEP/WHO: United
Kingdom.
22 AGRICULTURE WATER ENVIRONMENT
Page 27
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
4.3.2 Kandosols On the subject site, these soils were associated
These are soils that lack strong texture contrast, with boreholes
are not calcareous and have only massively or GOAL2,
weakly structured B horizons (Isbell, 2002). GOAL8
GOAL15
On the subject site, these soils were associated
GOAL24 and
with boreholes GOAL6, GOAL13, GOAL 14,
GOAL 16, GOAL 17, GOAL 18, GOAL23 and GOAL29
GOAL28. They were characterised predominantly and were characterised predominantly by a very
by a very dark grey (1OYR 3/1) to very dark grey dark brown (1OYR 2/2) to very dark greyish brown
brown (10YR 3/2) sandy loams to clay loam, (1 OYR 3/2) clay loam, fine sandy overlying grey
sandy. Overlying a light grey (1 OYR 7/1) to yellow (10YR 6/1) to yellow (10YR 7/6) and red and
(1 OYR 7/6) ad yellow, brown and red mottled brown mottled heavy clay B2 horizon with
sandy clay loam to medium clay B2 horizon with massive structure.
massive to weak angular blocky structure.
Based on physical and chemical attributes of the
Based on physical and chemical attributes of the soils encountered on the site, the Kurosols were
soil encountered on the site, the Kandosols were further classified as follows:
further classified as follows:
Melacic, Magnesic-Natric or Dystrophic,
Ferric-Acidic or Acidic-Sodic, Dystrophic, Yellow, Kurosols;
Yellow, Kandosols; and and
Acidic-Mottled, Grey, Kandosols. Melacic or Mottled, Mesotrophic or Dystrophic
or Natric, Grey, Kurosols.
4.3.3 Chromosols
These are soils other than Hydrosols that have a 4.3.5 Tenosols
clear or abrupt textural B horizon and in which the Tenosols are soils which exhibit weak pedological
major part of the upper 0.2 m of the B2 horizon (or organisation, apart from the A horizons (Isbell,
the major part of the entire B2 horizon if it is less 2002). On the subject site, these soils were
than 0.2 m thick) is not sodic and not strongly acid associated with boreholes GOAL4 and GOAL 19.
(Isbell, 2002). The Tenosols at these locations the soils were
characterised predominantly by a black (10YR
On the subject site, these soils were associated
2/1) or reddish brown (2.5Y 4/3) sandy loam to
with borehole GOAL3 and were characterised by
clayey sand A horizon overlying a yellow (10YR
a black (1OYR 2/1) sandy loam A horizon 7/8) and black and dark grey mottled clayey sand
overlying a yellowish-red (5YR 4/6) light medium B2 horizon with weak subangular blocky or
clay B2 horizon with moderate subangular blocky polyhedral structure.
structure.
Based on physical and chemical attributes of the
Based on physical and chemical attributes of the soils encountered on the site, the Tenosols were
soils encountered on the site, the Chromosol was further classified as follows:
further classified as a Melanic, Mesotrophic, Red,
Acidic, Ferric, Yellow-Orthic, Tenosol;
Chromosol.
and
4.3.4 Kurosols Melanic, Arenic, Black-Orthic, Tenosol.
These are soils other than Hydrosols with a clear
or abrupt textural B horizon and in which the 4.4 Soil permeability
major part of the upper 0.2 m of the B2 horizon (or Table 4.4.1 (on the following page) summarises
the major part of the entire B2 horizon if it is less
the rising and falling head test results for six
than 0.2 m thick) is strongly acid (Isbell, 2002).
representative groundwater bores across the site.
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 23
Page 28
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
Table 4.4.1 Rising and falling head test results 4.5 Recharge and evaporation
Borehole Permeability (m/s) Table 4.5.1 describes the application of Cooks
GW1 1.98 x 10-7 method to estimate recharge using the
established range of probable rainfall chloride
GW2 1.27 x 10-5
concentrations for the site of 3.01 to 6.1 Omg/L and
GW4 1.25 x 10-6
an average runoff fraction of 0.2. The estimate
GW5 3.32 x 10-6 suggests that average groundwater recharge may
BH20 1.3 x 10-5
vary across the site from -176 to -356mm/year.
This equates to between -10 and -20% of the
BH58 2.31 x 10-3 annual rainfall total.
It can be seen from the results that permeability The MEDLI water balance model indicated a
varies across the site from 2.31 x 10-3 in the similar range for recharge, varying between 6%
south-west up to 1.98 x 10-7 in the central portion and 32% of average annual rainfall. In this case, a
of the site.
groundwater recharge level of 300mm/year was
used in the MODFLOW model. This level lies
Table 4.5.1 Recharge estimate (mm/yr)for the within the ranges calculated using Cook’s Method
’bl . f’ f II hi ’d t at’o s and the MEDLI model and was selected during
I Location Groundwater Rainfall CI- mg/L the calibration trials to gave the best fit with
cr mg/L measured groundwater results at the site.
I 3.01 6.10
Groundwater recharge 4.6 Steady-state calibration results
mm/year
A summary of residuals analysis of the steady
GW1 98 43 86
state calibrated versus measured (observed)
GW2 231 18 37 ground water is provided in Table 4.6.1.1.
GW3 36 116 235
The calibrated model was then used to assess
GW4 92 45 92 groundwater levels, flow paths and velocities for
the pre and post developed site.
GW5 218 19 39
GW6 148 28 57
Table 4.6.1.1. Residuals analysis
BH4 13 322 652
Parameter Result
BH9 14 299 605
Number of data points 17
BH23 9 464 941
Number of residuals with non- 17
BH26 28 149 303
zero weight
BH28 13 322 652
Residual mean -0.281 m
BH40 25 167 339
Absolute residual mean 0.34m
BH43 22 190 385
Maximum weighted residual -1.196m (GW4)
BH45 16 261 529
Minimum weighted residual -0.014m
BH48 40 105 212 (BH43A)
BH65 16 261 529 Normalised root mean 5.244%
176 356 squared
Average
Standard error of weighted 0.079m
Percent of average
residuals
annual rainfall using 10% 20%
Cooks Method Correlation coefficient 0.993
24 AGRICULTURE WATER ENVIRONMENT
Page 29
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
4.7 Groundwater model outcomes Tenosols within the development area is shown
on Drawing NO.1 0838.3.3.
4.7.1 Pre-development groundwater levels
and flow direction Whilst Hooghoudt’s equation predicts that the
Throughout the site, groundwater flow generally lateral extent of drawdown may extend up to
follows the topography and drains toward low- 1,281 m from the point of disturbance in these soil
lying areas and drainage features. Groundwater types, in reality, the true extent of drawdown will
on the eastern perimeter of the site drains toward be limited to the extent of this soil type (shown on
Lake Weyba. Drawing NO.1 0838.3.4 shows the Drawing No. 10838.3.3).
pre-development groundwater contours.
If mitigation measures such as recharge trenches
were to be employed, the drawdown extent would
4.7.2 Earthworks phase groundwater level
be substantially lessened. To preventlminimise
and flow direction changes
A detailed cut and fill plan has not been groundwater impacts during the earthworks phase
of the development, works should be undertaken
incorporated into the model at this time, however
in accordance with the attached Groundwater
it is envisaged that changes to ground level will be
limited to minor regrading works, construction of Management Plan (Appendix 5).
stormwater treatment devices and the excavation
4.7.4 Earthworks phase seepage
of trenches for services.
Construction of trenches for services is likely to
necessitate excavation below the groundwater
The anticipated scale of earthworks at the site is
table. The exact location and dimensions of these
unlikely to impact upon groundwater recharge
services is not yet known, however to provide an
characteristics and as such, no significant or
estimate of the likely extent of groundwater
prolonged change to groundwater level or flow
direction is anticipated. Any impacts on the seepage, the Darcian flow rate can be used.
groundwater environment are likely to be limited
The Darcian flow rate was calculated on a ’per
to short-term drawdown during the excavation of
trenches for services. These impacts are explored square metre’ basis using the range of
in the following section. permeability results measured at the site
(summarised in Table 4.4.1), and an estimated
maximum excavation depth of 3m.
4.7.3 Earthworks phase drawdown
The potential for groundwater drawdown to occur
The assumptions and calculations are detailed
during the earthworks phase of the development
blow;
is limited to trenching works associated with the
installation of services (stormwater,sewer etc).
Q=KiA
The exact location of these services is not yet
known, however the likely impacts of trench Where:
construction can be explored using Houghoudt’s
equation (refer to Section 3.9 for details). Q = volumetric flow rate (m3/day)
The estimation of drawdown extents has been
K =
hydraulic conductivity; (m/day)
based on an excavation depth of 3m. In areas
where the depth of excavation is less than this
estimate, the impacts of drawdown will also i = hydraulic gradient; (m/m)
decrease.
A = cross sectional area of the dewatered
The larger drawdown extents are predicted to
pit (m2)
occur in areas of the site where Tenosols (sandy
soils) have been identified. The occurrence of
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 25
Page 30
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
Table 4.4.1 -
Measured site permeability results 4.7.6 Earthworks phase impacts on nearby
sensitive receivers
I (m~m)I (m2)
Q K A
BH
(m3/day) Sensitive receivers identified for the Noosa on
(m/day)
Weyba development include the vegetation
GW1 0.005 1.98 x 10-7 0.29 1
communities identified on the DERM RE mapping
GW2 0.042 1.27 x 10-5 0.04 1 and surface waters in the vicinity of the site
GW4 0.011 1.25 x 10-6 0.10 1 including Lake Weyba and associated tributaries.
GW5 0.025 3.32 x 10-6 0.09 1 Based on the groundwater drawdown estimates
BH20 0.052 3.92 x 10-6 0.05 1 detailed in Section 4.7.3 the lateral extent of
groundwater drawdown is calculated to range
BH58 0.935 1.39 x 10-3 0.005 1
from approximately 20m up to 1,281 m. The larger
drawdown extents are predicted to occur in areas
Assuming a maximum excavation depth of 3m, of the site where Tenosols (sandy soils) have
groundwater seepage within excavations is likely been identified. The occurrence of Tenosols within
to be in the order of 0.005m3/day up to 0.935m3/ the development area is shown on Drawing No.
day for each square metre of excavation face. 10838.3.3.
Management of groundwater seepage should be
undertaken in accordance with the attached Whilst Hooghoudt’s equation predicts a lateral
Groundwater Management Plan. extent of drawdown up to 1,281 m in these soil
types, in reality, the true extent of drawdown will
4.7.5 Earthworks phase groundwater quality be limited to the extent of this soil type.
impacts
Earthworks at the site including regrading are Groundwater drawdown can have impacts on
likely to be minimal, however some excavations ecological communities that are sensitive to
will be necessary to facilitate the installation of modification of the groundwater regime.
services and stormwater treatment devices. It is Groundwater drawdown associated with the
earthworks phase of the development is unlikely
likely that groundwater will be encountered during
these excavations however the duration of to be prolonged with excavations such as services
disturbance is likely to be minimal. For example, trenches excavated and backfilled on a
services trenches are typically excavated and progressive basis.
backfilled progressively.
The vegetation at the site identified through the
An acid sulfate soil investigation was undertaken DERM RE mapping includes various species of
Melaleuca and Eucalypts, which are unlikely to be
by Cardno Pty Ltd with results reported in the
Cardno Geotechnical Investigation report of June sensitive to short-term impacts on the
2012. Results of the investigation indicated that groundwater regime.
some acid sulfate soil materials may be present at
As noted earlier, the drawdown extents estimated
the site and are likely to be disturbed during
above are based on a scenario where no
excavation works.
mitigation measures are in place. Implementation
Disturbance of acid sulfate soil has the potential to of mitigation measures such as those described in
the attached Groundwater Management Plan
impact upon groundwater quality if appropriate
management techniques are not implemented. (Appendix 5) will substantially reduce the level of
groundwater drawdown likely to be experienced at
To preventlminimise groundwater quality impacts the site and reduce the potential for impacts on
during the earthworks phase of the development, the identified ecological communities.
works should be undertaken in accordance with a
site specific Acid Sulfate Soils Management Plan Acid sulfate soils are likely to be present at the
and the Groundwater Management Plan attached site and can impact upon groundwater quality and
in Appendix 5. the quality of associated surface waters if
26 AGRICULTURE WATER ENVIRONMENT
Page 31
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
appropriate management techniques are not The shaded areas identified on Drawing No.
employed. To prevent/minimise groundwater 10838.3.5 represent areas of the site where
quality impacts during the earthworks phase of the groundwater level will decrease by approximately
development, works should be undertaken in 0.1 m to 0.22m as a result of the development. As
accordance with a site specific Acid Sulfate Soils shown in this drawing the area of impact is largely
Management Plan. limited to the area of the development footprint,
with no offsite impacts predicted by the
Provided all works are undertaken in accordance
groundwater model.
with the requirements of a site specific ASSMP
and Groundwater Management Plan the impacts Groundwater flow direction during the operational
on nearby sensitive receivers can be prevented phase remains largely consistent with the pre-
and/or minimised. development condition flowing toward low-lying
areas and drainage features. Groundwater on the
4.7.7 Operational phase groundwater level eastern perimeter of the site continues to drain
and flow direction changes toward Lake Weyba.
The pre-development condition of groundwater
flow direction and height was compared with the 4.7.8 Operational phase drawdown
post development outcome conditions. As all excavation works will be complete and the
stormwater treatment devices installed and
The post development model assumed the
operational, no ongoing groundwater drawdown is
following impervious fractions for the various anticipated during the operational phase of the
types of development within each precinct; development.
Residential lots = 0.6
4.7.9 Operational phase seepage
Retirement living and townhouses = 0.7
As all excavation works will be complete and the
Apartment living/mixed use = 0.9
stormwater treatment devices installed and
operational, no ongoing groundwater seepage is
Parks, green-space, buffer zones and the
anticipated during the operational phase of the
undeveloped balance of the large rural residential
development.
lots remained unchanged from the pre-
development condition. 4.7.10 Operational phase groundwater quality
The introduction of impermeable surfaces to the impacts
Activities and/or land uses likely to impact on
site will result in a reduction in groundwater
groundwater quality such as onsite effluent
recharge and a corresponding increase in runoff.
disposal or industrial activities are not proposed
The additional runoff from the developed areas for the Noosa on Weyba development. Provided
would be collected within the stormwater that acid sulfate soil disturbance has been
treatment devices and report as diffuse discharge appropriately managed throughout the
into the natural drainage features of the site. In earthworks/construction phase of the
order to demonstrate the worst case scenario, the development, operational phase impacts to
benefit of increased recharge within the drainage groundwater quality are not anticipated.
lines that would result from the outflows of the
4.7.11 Operational phase impacts on nearby
stormwater treatment devices has not been
included in the groundwater model. sensitive receivers
Given that groundwater flow direction will remain
The predicted post-development groundwater largely unchanged and that any impacts on
conditions are shown on Drawing NO.1 0838.3.4 groundwater level are restricted to within the
and the elevation difference between the pre and development footprint, impacts on sensitive
post development scenarios is shown on Drawing receivers such as vegetation and nearby surface
No. 10838.3.5. water bodies are likely to be negligible.
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 27
Page 32
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
4.7.12 Sea level rise impacts As with any modelling exercise of such scope and
Drawing NO.1 0838.3.8 shows the change in scale, further and more detailed data that would
water table level with a 0.8 m rise in water level be available at the detailed design phase of the
within Lake Weyba and the associated tributaries. development will assist in providing confirmation
and guiding model refinement.
Groundwater levels within the development site
are not predicted to increase as a result of sea Other uncertainties in the use of the model are
level rise. Any groundwater level changes related to:
predicted by the conceptual model are contained The size of the model grid (in this case 50m),
within the immediate vicinity of Lake Weyba and
if remodelled using a smaller grid, may
the associated tributaries.
provide greater resolution to the model
outcomes.
This low level of impact is largely as a result of the
clayey soils encountered on-site. Seasonal variation (noting the data in this
model were collected over a period of 4
4.8 Model sensitivity analysis and months yielding data of a limited climatic
uncertainty range).
The sensitivity analysis presented as Jacobian Recharge estimation is an approximation that
plots are attached in Appendix 6. These show that may need refinement.
the parameter that most influences the model The site exhibits greater heterogeneity in the
outcome is the hydraulic conductivity in the k-x (or stratigraphy than was assumed by the model.
east-west) flow directions. This is the case for all
permeability parameters used in the models.
Direction y (north-south)and z (in-out) are not of
significant influence.
28 AGRICULTURE WATER ENVIRONMENT
Page 33
A LEGEND SOURCES PROJECT CLIENT DRAWING Brisbane Sydney Melbourne and regions
ORIENTATION
NORTH == Proposed development area boundary Image base: Google Earth Pro 2012 NOOSA ON WEYBA NORTHBROOK EXISTING
GROUNDWATER CORPORATION GROUNDWATER
SCALE
_Itlll 200M)IJII 400Mi’1111 6001
.. Biodiversity offset area boundary
ASSESSMENT PTY LTD CONTOURS
metres
BRISBANE ..groundwater
5m contours
GPO Box 9856 Brisbane QLD4001
Email [email protected]
0738523999
www.access.gs
..groundwater
1m contours SCALE
1:12500@A3
DATE
23/07/2012
DRAWN
SPD
CHECKED
ELH
PROJECT NO
10838
DRAWING NO
3.4 Agriculture. Water. Environment.
Page 34
A LEGEND SOURCES PROJECT CLIENT DRAWING Brisbane Sydney Melbourne and regions
ORIENTATION
NORTH == Proposed development area boundary Image base: Google Earth Pro 2012 NOOSA ON WEYBA NORTHBROOK DEVELOPED
GROUNDWATER CORPORATION GROUNDWATER
SCALE
_Itlll 200M)IJII 400Mi’1111 6001
.. Biodiversity offset area boundary
ASSESSMENT PTY LTD CONTOURS
metres
BRISBANE ..groundwater
5m contours
GPO Box 9856 Brisbane QLD4001
Email [email protected]
0738523999
www.access.gs
..groundwater
1m contours SCALE
1:12500@A3
DATE
23/07/2012
DRAWN
SPD
CHECKED
ELH
PROJECT NO
10838
DRAWING NO
3.5 Agriculture. Water. Environment.
Page 35
A LEGEND SOURCES PROJECT CLIENT DRAWING Brisbane Sydney Melbourne and regions
ORIENTATION
NORTH = Proposed development area boundary Image base: Google Earth Pro 2012 NOOSA ON WEYBA NORTH BROOK DEVELOPMENT
GROUNDWATER CORPORATION IMPACT
SCALE
_11111 200MlIIII 400-11111 6001
..
Biodiversity offset area boundary
ASSESSMENT PTY LTD
metres
BRISBANE ~ Groundwater level change between -0.22m and -0.10m
GPO Box 9856 Brisbane QLD4001 0738523999 SCALE DATE DRAWN CHECKED PROJECT NO DRAWING NO
Email [email protected] www.access.gs 1:12500@A3 23/07/2012 SPD ELH 10838 3.6 Agriculture. Water. Environment.
Page 36
....
’II’
e.,. ,_
.. ,,~ ..
..
:.."
~
A LEGEND SOURCES PROJECT CLIENT DRAWING
ORIENTATION
NORTH =Proposed development boundary area Image base: Google Earth Pro 2012 NOOSA ON WEYBA NORTH BROOK SEA LEVEL RISE
GROUNDWATER CORPORATION IMPACT
SCALE
_11111 200MlIIII 400-11111 6001
..Biodiversity offset area
boundary
ASSESSMENT PTY LTD
metres
BRISBANE ~ Groundwater level
change between -0.22m and -0.10m
GPO Box 9856 Brisbane QLD4001 0738523999
Email [email protected] www.access.gs _ Groundwater level
change between 0.1 Om and 0.80m SCALE
1:12500@A3
DATE
23/07/2012
DRAWN
SPD
CHECKED
ELH
PROJECT NO
10838
DRAWING NO
3.8 Agriculture. Water. Environment.
Page 37
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
localised decrease in groundwater level beneath
5 Conclusions
the development footprint as a result of reduced
groundwater recharge. No offsite impacts are
5.1 Earthworks phase groundwater predicted by the groundwater model.
impacts It is important to note that the benefits of
Groundwater impacts during the construction groundwater recharge from the outflows of the
phase are limited to the impacts of groundwater stormwater treatment devices have not been
drawdown during trenching/excavation works. The included in the groundwater model. The results
results of this assessment indicate that where presented in this report therefore represent the
groundwater drawdown occurs, the extent will be predicted maximum decrease in groundwater
within the range of 20m to 1,281 m. level as a result of the development.
The larger drawdown extents are predicted to Activities and/or land uses likely to impact on
occur in areas of the site where Tenosols (sandy groundwater quality such as onsite effluent
soils) have been identified. The occurrence of disposal or industrial activities are not proposed
Tenosols within the development area is shown for the Noosa on Weyba development.
on Drawing NO.1 0838.3. Operational phase impacts to groundwater quality
are therefore not anticipated.
Whilst Hooghoudt’s equation predicts the lateral
extent of drawdown to be up to 1,281 m in these 5.3 Predicted impacts for sensitive
soil types, in reality, the true extent of drawdown receivers
will be limited to the extent of this soil type.
The effect of groundwater drawdown has the
Instances of groundwater drawdown are unlikely potential to impact on sensitive receivers such as
to be prolonged with excavations such as services the identified ecological communities located
trenches excavated and backfilled on a throughout and adjacent to the development site.
For the Noosa on Weyba development,
progressive basis.
groundwater drawdown is limited to the
The extent of groundwater drawdown calculated earthworks phase of the development and is
in this report is based on a scenario where no unlikely to occur for prolonged periods of time.
mitigation measures are in place. Implementation
of mitigation measures such as those described in At this stage of the development proposal, the
the attached Groundwater Management Plan will exact location of services trenches is unknown.
Should these be proposed for areas adjacent to
substantially reduce the level of groundwater
drawdown likely to be experienced at the site. sensitive receiving environments, mitigation
measures such as those proposed in the attached
Disturbance of acid sulfate soil through excavation Groundwater Management Plan should be
and/or groundwater drawdown has the potential to implemented.
impact upon groundwater quality if appropriate
management techniques are not implemented. To 5.4 Sea level rise
preventlminimise groundwater quality impacts Groundwater levels within the development site
during the earthworks phase of the development, are not predicted to increase as a result of sea
works should be undertaken in accordance with a
level rise. Any groundwater level changes
site specific Acid Sulfate Soils Management Plan.
predicted by the conceptual model are contained
within the immediate vicinity of Lake Weyba and
5.2 Operational phase groundwater the associated tributaries.
impacts
Groundwater impacts during the operational This low level of impact is largely as a result of the
phase of the development are limited to a clayey soils encountered on-site.
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 29
Page 38
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
5.5 Summary minimise any impacts to groundwater and
sensitive receivers at the site.
Groundwater impacts that are likely to result from
the proposed Noosa on Weyba Development are
As with any modelling exercise of such scope and
anticipated to be minimal and are not predicted to scale, further and more detailed data that would
extend beyond the boundaries of the
be available at the detailed design phase of the
development. Where impacts are predicted to development will assist in providing confirmation
occur, the management techniques included in and guiding model refinement.
the attached Groundwater Management Plan
should be implemented to prevent and/or
30 AGRICULTURE WATER ENVIRONMENT
Page 39
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
is made in good faith and on the basis that the
6 Limitations of reporting
authors, Gilbert & Sutherland Pty Ltd, their agents
or employees are not liable (whether by reason of
lack of care or otherwise) to any person for any
Gilbert & Sutherland Pty Ltd has made every
effort to ensure that the information contained in damage or loss whatsoever which has occurred or
this report is accurate. The interpretation of may occur in relation to that person taking or not
scientific data, however, often involves both
taking (as the case may be) action in respect of
any representation, statement or advice referred
professional and subjective judgments and as
to above.
such is open to error.
In recognising the potential for errors in scientific
Furthermore, this information should not be relied
upon by any persons other than the client, or the
interpretation, Gilbert & Sutherland Pty Ltd does
relevant statutory authority determining the client’s
not guarantee that the information is totally
accurate or complete and clients are advised not
application, for whom it has been compiled. This
information reflects the specific brief and the
to rely solely on this information when making
commercial decisions. Any representation,
budget of the client concerned, who enjoys an
individual tolerance of risk.
statement, opinion or advice, expressed or implied
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 31
Page 40
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
7 Appendix 1 -
Development Master Plan
32 AGRICULTURE WATER ENVIRONMENT
Page 41
I I
LEGEND:
-
SENDSITE
-
RECEIVE SITE
-
ASSET PROTECTION ZONE
TREE PROTECTION ZONE PROTECTED
-
O KOALA BUSHLAND HABITAT
== POWERLlNE EASEMENT 25m -
= BUSH FIRE ACCESS TRAIL 6m
-
-
NOOSA ON WEYBA -_
~/ ~~ ..
NORTHBROOK CORP PTY LTDAND J & K HOFMANN
I1~00/Sa
.MASTER PLAN
on weyba -
Design
-
MlDesign Ply Ltd 0 SO.O 100 architecture I master plannirg I urban design I interior design
ACN100492304 ~
ABN 89159048228
PlotDate:8J08I2012
W~ SCALE-1:10000@A3 APPROVED FOR ISSUE:_ 07/08/2012@ ML Design Ply. Ltd. JOB NO: NORT0001 MP-004-[J] -
.
L File Path: P:INORTOOOCLake WeybalB_Dorumentatioo\BI_ProductionlB1_Olll’NingsVlrdliCADlLayoutsINORTOOO1_layout.pln
_j
Page 42
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
8 Appendix 2 -
Borelogs
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 33
Page 43
Borehole: GW1
Project: 10838 Drill Method: HD10s
Client: Northbrook Corporation Pty LId Easting: 504944
5.6 7076954
+Gn I
Depth (m): Northing:
Logged by: PK
SlJT1-ERI.AN)
Drilled by: G&S
Drill date: 03.04.12
Drilling
::::r Ol
(/) _Q
z
.r: :c Comments
15. 0..
Q) ~
0
c.9
SANDY CLAY LOAM, Bluish black (5PB2.5/1), Massive structure, sandy fabric, very weak consistence, diffuse to;
~~~~~~~
.\.- .\.- .\.- .\.- .\.- .\.- .
.(:).(J.(:):<.J .(J.(J.(J CLAY LOAM SANDY, Bluish grey (5PB5/1),Massive structure, sandy fabric, very weak consistence, diffuse to;
.\.- .\.- .\.- .\.- .\.- .\.- .
<,:) <,:) <,:) ~ ~ <,:) <,:)
.
.
.
.
. . . . .
HEAVY CLAY, Massive structure, sandy fabric, firm consistence, diffuse to;
HEAVY CLAY, White (10R8/1),with 20% Red (10R4/8)and 20% yellow (10yr7/6)mottles, massive structure,
very firm consistence, few <1 mm roots, diffuse to;
HEAVY CLAY, White (2.5YR8/1),with 10% reddish yellow (7.5yr6/8)mottles, Massive structure, very firm
consistence;
HEAVY CLAY, White (7.5YR8/1), Massive structure, firm consistence;
HEAVY CLAY, White (5Y8/1),with 40% strong brown (7.5yr5/8)mottles, Massive structure, firm consistence;
HEAVY CLAY, White (5YR8/1),with 20% Red (2.5yr5/8) mottles, Massive structure, very firm consistence;
HEAVY CLAY, Light reddish grey (2.5YR7/1),with 10% brown (7.5yr5/4)and 5% dark red (2.5yr3/6)mottles,
Massive structure, very firm consistence;
HEAVY CLAY, White (2.5YR8/1),with 30% dark red (2.5yr3/6)mottles, Massive structure, very firm consistence,
borehole terminated at 5.6 m below NSL.
Page 44
Borehole: GW2
Project: 10838 Drill Method: HD10s
Client: Northbrook Corporation Pty LId Easting: 504876
6 7077158
+Gn I
Depth (m): Northing:
Logged by: AAK
SlJT1-ERI.AN)
Drilled by: G&S
Drill date: 04.04.12
Drilling
::::r Ol
(/) _Q
z
.r: :c Comments
15. 0..
Q) ~
0
c.9
SANDY CLAY LOAM, Very dark grey (10YR3/1), Massive structure, very weak consistence, with fine grained
sand, few very fine roots, clear change to;
(10YR5/1), Massive structure, firm consistence, with fine grained sand, few very fine
MEDIUM HEAVY CLAY, Light grey (10YR7/1),with 40% brownish yellow (10yr6/6)mottles, Massive structure,
very firm consistence, clear change to;
MEDIUM HEAVY CLAY, Light grey (10YR7/1),with 15% -
20% brownish yellow (10yr6/8)mottles, Massive
structure, firm consistence, gradual change to;
HEAVY CLAY, Light grey (10YR7/1),with 25% dark yellowish brown (10yr4/6), 10% dark reddish brown
(2.5yr3/4)and 5% brownish yellow (10yr6/8)mottles, M<assive structure, strong consistence, gradual change to;
20% -
30% dark yellowish brown (1Oyr3/4) mottles, Massive structure,
LOAMY PEAT, Very dark grey (1OYR3/1), Weak subangular blocky (5-1Omm)structure, firm consistence, abrupt
change to;
HEAVY CLAY, Light grey (10YR7/1),with 50% light brownish grey (10yr6/2), 5% brownish yellow (10yr6/8)and
5% red (2.5yr4/6) mottles, Massive structure, very strong consistence, clear change to;
HEAVY CLAY, White (1OYR8/1), Massive structure, very strong consistence, clear change to;
HEAVY CLAY, Light grey (10YR7/1),with 30% red (2.5yr4/6)mottles, Massive structure, very strong
consistence, clear change to;
LIGHT CLAY, Light brownish grey (10YR6/2),with 25% grey (10yr5/1)mottles, Massive structure, firm
consistence, gradual change to;
MEDIUM HEAVY CLAY, White (1OYR8/1), with 20% red (2.5yr4/6) mottles, Massive structure, very firm
consistence, gradual change to;
MEDIUM HEAVY CLAY, White (10YR8/1),with 15% red (2.5yr4/6) mottles, Massive structure, strong
consistence, borehole terminated at 6.00m below NSL.
Page 45
Borehole: GW3
Project: 10838 Drill Method: HD10s
Client: Northbrook Corporation Pty LId Easting: 505092
6 7077233
+Gn I
Depth (m): Northing:
Logged by: AAK
SlJT1-ERI.AN)
Drilled by: G&S
Drill date: 04.04.12
Drilling
::::r Ol
(/) _Q
z
.r: :c Comments
15. 0..
Q) ~
0
c.9
subangular blocky (2.5mm)structure, moist, very
brown (10YR5/2),Massive structure, moderately moist, very weak consistence, few
FINE SANDY LOAM, Yellow (1OYR7/B), with 20% very dark grey (1Oy3/1) mottles, Massive structure,
moderately moist, very weak consistence, few very fine roots, gradual change to;
CLAYEY LOAMY FINE SAND, Brownish yellow (10YR6/B),with 15% grey (10yr6/1)mottles, Massive structure,
moderately moist, weak consistence, common fine roots, few medium angular quartz pebbles, diffuse change to;
MEDIUM HEAVY CLAY, Light grey (10YR7/1),with 30% yellowish brown (10yr5/6)and 20% red (2.5yr5/6)
mottles, Massive structure, dry, firm consistence, common course Ferromagniferous fragments, gradual change
to;
MEDIUM HEAVY CLAY, Light grey (10YR7/1),with 30% yellowish brown (2.5yr5/6)and brownish yellow
(10yr6/6)mottles, Massive structure, dry, very firm consistence, gradual change to;
MEDIUM HEAVY CLAY, Light grey (10YR7/1), Massive structure, dry, strong consistence, gradual change to;
MEDIUM HEAVY CLAY, Light grey (10YR7/1), Massive structure, dry, strong consistence, gradual change to;
MEDIUM HEAVY CLAY, Light grey (10YR7/1), Massive structure, dry, strong consistence, common course
weak Ferromagniferous fragments, clear change to;
MEDIUM HEAVY CLAY, Red (2.5YR4/6),with 30% light grey (10yr7/1)mottles, Massive structure, dry, strong
consistence, few small angular quartz pebbles, common course weak Ferromagniferous fragments, gradual
change to;
MEDIUM HEAVY CLAY, Red (2.5YR4/6),with 30% light grey (10yr7/1)mottles, Massive structure, dry, strong
consistence, few small angular quartz pebbles, common course weak Ferromagniferous fragments, borehole
terminated at 6.0m.
Page 46
Borehole: GW4
Project: 10838 Drill Method: HD10s
Client: Northbrook Corporation Pty LId Easting: 505164
6 7076253
+Gn I
Depth (m): Northing:
Logged by: AAK
SlJT1-ERI.AN)
Drilled by: G&S
Drill date: 05.04.12
Drilling
::::r Ol
(/) _Q
z
.r: :c Comments
15. 0..
Q) ~
0
c.9
FINE SANDY LOAM, Very dark greyish brown (10YR3/2),Moderate 2-5mm subangular blocky structure, moist,
ve weak consistence, common 1-2mm roots, diffuse to;
CFS, Grey (1OYR5/1), with 20% dark grey (1OYR4/1) mottles, Moderate 5-10mm subangular blocky, moderately
moist, very weak consistence, few 1-2mm roots, clear to;
MEDIUM CLAY, Grey (10YR6/1),with 15% brownish yellow (10YR6/8)and 10% white (10YR8/1)mottles,
Massive structure, dry, very firm consistence, few <1 mm roots, gradual to;
HEAVY CLAY, Grey (1OYR6/1), Massive structure, dry, very firm consistence, clear to;
.
:;’-t. :’-t. :’-t. :’-t::’-t::"+::"
".+’ :.+’ :.+’ :.+’ :.+’ :.+’ :.+’
.
.’ :’ -+ .’ :’ -+. :’ +- .’ :’ +- :’,,: .- :’ -+ .- :’
.
:.+’,:.+’,:.+’ :.+’ :.+’ :.+’ :.+’
2 .
::.+::.+::"+::"+. :.+ ::.+ ::.
’,.+’,:.+’,:.+’ :.+’ :.+’ :.+’:.+
.
::-t. :-t. :-t. :-t::-t:;’-t::’
:.+.....+..:.+. :.+’ :.+’ :.+’ :.+’ FINE SANDY CLAY LOAM, Grey (10YR6/1),with 10% yellowish brown (10YR5/4)mottles, Massive structure,
.
::’ -+. :
-+. :-+. :-+ : -+ .- :’ -+ .’ :’.
"’+":’+"::+":.+’,:.+’,:.+’,:.+ moderately moist, weak consistence, gradual to;
’:-t. :-t. :-t. :-t. :-t::-t::
:.+’,:.+’,:.+’,:.+’,:.+’,:.+’,:.+
::’-t. :-t. :-t. :-t. :-t::’-t::’
:.+’,:.+’,:.+’ :.+’,:.+’,:.+’,:.+’
.
::’+. :’+::’-t. :’-t. :’-t::’-t::’
’,.+’,:.+’ :.+’ :.+’ :.+’,:.+’ :.+’
.
.’ :’ -+ .’ :’ -+ .’ :’ +- :’ +- :’ -+ .- :’ -+ .- :’
. .
’,.+’,:.+’,:.+’ :.+’ :.+’ :.+’ :.+’
.
:
.’:’ +- .’ :’ -+ .’ :’ +- .’ :’ -+ . -+ .- :’ -+ .- :.
"".+.":.+"":.+" :.+" :.+" :.+" :.+.
"
:
.. :" +. +. :+ : + : + .. :" + .. :
SANDY CLAY LOAM, Light grey (10YR7/1),Massive structure, wet, very weak consistence, clear to;
COURSE SANDY CLAY LOAM, Grey (10YR6/1),with 5% yellow (10YR7/8)mottles, Massive structure, wet, firm
consistence, gradual to;
COURSE SANDY CLAY LOAM, Grey (10YR5/1),with 30% yellow (10YR7/8)mottles, Massive structure,
moderatel moist, weak consistence, radual to;
HEAVY CLAY, Grey (10YR5/1),with 30% yellow (10YR7/8)and 30% very dark grey (10YR3/1)mottles, Massive
structure, moderately moist, strong consistence, clear to;
HEAVY CLAY, Brownish yellow (10YR6/8),with 20% grey (10YR5/1)and 20% yellowish brown (10YR5/8)
mottles, Massive structure, moderately moist, very firm consistence, borehole terminated at 6.0m below NSL.
Page 47
Borehole: GW5
Project: 10838 Drill Method: HD10s
Client: Northbrook Corporation Pty LId Easting: 505862
6 7076301
+Gn I
Depth (m): Northing:
Logged by: AAK
SlJT1-ERI.AN)
Drilled by: G&S
Drill date: 10.04.12
Drilling
::::r Ol
(/) _Q
z
.r: :c Comments
15. 0..
Q) ~
0
c.9
(10YR2/2),Massive structure, moderately moist, weak
MEDIUM CLAY, Grey (10YR6/1),with 40% red (10R4/8)mottles, Massive structure, moist, firm consistence,
few <1mm roots, common 6-20mm subrounded ironstone fragments, few iron-manganese <2mm weak
segregations, clear to;
MEDIUM HEAVY CLAY, Grey (10YR6/1),with 40% red (10R4/8)mottles, dry, firm consistence, gradual to;
MEDIUM HEAVY CLAY, White (10YR8/1),with 40% red (10R4/8)mottles, Massive structure, dry, firm
consistence, few 6-20mm subrounded ironstone fragments, diffuse to;
MEDIUM HEAVY CLAY, Light grey (10YR7/1),with 40% red (10R4/8)mottles, Massive structure, dry, firm
consistence, abundant 20-60mm subrounded ironstone fragments, common iron-manganese 2-6mm weak
segregations, clear to;
MEDIUM CLAY, Light grey (10YR7/1),with 30% grey (10YR6/1)mottles, Massive structure, dry, firm
consistence, clear to;
grey (10YR7/1),with 20% grey (10YR6/1)and 20% dark brown (10YR3/3)mottles,
,
firm consistence, few 6-20mm subrounded ironstone fragments, few iron-manganese
MEDIUM HEAVY CLAY, Greyish brown (10YR5/2),with 40% light reddish brown (2.5YR6/3)mottles, Massive
structure, dry, firm consistence, gradual to;
HEAVY CLAY, Very dark grey (1OYR3/1), Massive structure, dry, very firm consistence, gradual to;
HEAVY CLAY, Very dark grey (10YR3/1),with 15% grey (10YR6/1)and 15% grey (10YR5/1)mottles, Massive
structure, dry, very firm consistence, borehole terminated at 6.0m below NSL.
Page 48
Borehole: GW6
Project: 10838 Drill Method: HD10s
Client: Northbrook Corporation Pty LId Easting: 506029
6 7076365
+Gn I
Depth (m): Northing:
Logged by: AAK
SlJT1-ERI.AN)
Drilled by: G&S
Drill date: 11.01.12
Drilling
::::r Ol
(/) _Q
z
.r: :c Comments
15. 0..
Q) ~
0
c.9
SANDY LOAM, Very dark greyish brown (10YR3/2),Massive structure, moderately moist, very weak
consistence, man 2-5mm roots, few 2-6mm subrounded ironstone fra ments, radual to;
COURSE SANDY CLAY LOAM, Very dark greyish brown (10YR3/2),with 20% greyish brown (10YR5/2)and
10% strong brown (7.5YR4/6)mottles, Massive structure, moderately moist, very weak consistence, common
1-2mm roots, few 2-6mm subrounded ironstone fragments, clear to;
CLAY LOAM SANDY, Grey (10YR6/1),with 40% reddish yellow (10YR7/6)mottles, Massive structure, moist,
weak consistence, few <1 mm roots, common 6-20mm subrounded ironstone, diffuse to;
LIGHT CLAY, Light grey (10YR7/1),with 30% red (10R4/8)and 10% brownish yellow (10YR6/8)mottles,
Massive structure, dry, weak consistence, gradual to;
HEAVY CLAY, White (10YR8/1),Massive structure, dry, firm consistence, common 6-20mm subrounded
ironstone fragments, clear to;
HEAVY CLAY, 10YR7/1 (10YR7/1),Massive structure, dry, very firm consistence, many 20-60mm subrounded
ironstone fragments, clear to;
HEAVY CLAY, Light grey (10YR7/1),with 5% red (10R4/8)and 5% brownish yellow (10YR6/8)mottles, Massive
structure, dry, very firm consistence, common 6-20mm subrounded ironstone fragments, clear to;
HEAVY CLAY, Light grey (10YR7/1),with 20% white (10YR8/1)mottles, Massive structure, dry, very firm
consistence, many 20-60mm subrounded ironstone fragments, common iron-manganese fine weak
segregations, clear to;
~~;0~;0~;0d;0d/f~;~~; CLAY LOAM COARSE SANDY,White (1OYR8/1), with 20% ligh grey (1OYR7/1) mottles, Massive structure,
o...~ .~ ..J .~....~.~ wet, weak consistence, many 20-60mm angular ironstone fragments, common iron-manganese fine weak
J...o F_.of..o F_.of. o~F_.of.o segregations, abrupt to;
HEAVY CLAY, Light grey (10YR7/1),with 10% white (10YR8/1)and 5% yellow (10YR8/8)mottles, Massive
structure, moist, very firm consistence, clear to;
~....~....~....~....~....~....~... CLAY LOAM COARSE SANDY, 10YR7/1 (10YR7/1),with 10% grey (10YR5/1)and 10% white (10YR8/1)
’,Q."’,0," ’,0."’.0." ’,0." ’,0."’,0.’"
. . . . . .
’.
~
HEAVY CLAY, 10YR2.5/1 (10YR2.5/1),with 15% light grey (10YR7/1)and 10% grey (10YR5/1)mottles,
Massive structure, moderately moist, very firm consistence, few 6-20mm angular ironstone fragments, common
iron-man anese fine weak se re ations borehole terminated at 6.0m below NSL.
Page 49
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
9 Appendix 3 -
Groundwater monitoring results
34 AGRICULTURE WATER ENVIRONMENT
Page 50
+GILEERI
www.ac ss.gs
SlJ11
Table 10.1 Groundwater level RL M AHD recorded during Lake Weyba groundwater monitoring
I Sampling
date
27/03/12
.-
S
C)
C\J
S
C)
C")
S
C)
"’"
S
C)
l.{)
S
C)
CD
S
C)
"’"
I
co
(j)
I
co
0
C\J
I
co
C")
C\J
I
co
CD
C\J
I
co
co
C\J
I
co
0
C")
I
co
0
"’"
I
co
7.48
C")
"’"
I
co
8.61
l.{)
"’"
I
co
7.05
co
"’"
I
co
4.06
co
l.{)
I
co
13.77
l.{)
CD
I
co
11.71
12/04/12 6.09 5.58 5.28 7.57 7.23 7.35 5.85 7.50 7.88 6.81 3.55 12.57 11.04
13/04/12 3.03 6.73 2.53 1.70 9.64 2.66
01/05/12 3.27 7.15 3.15 1.92 10.38 3.12 6.55 6.07 5.19 7.96 8.01 7.82 6.63 7.48 8.16 6.88 4.05 12.57
09/05/12 3.22 7.05 2.78 1.91 9.99 2.86 6.48 5.88 5.20 7.78 7.87 7.64 6.32 7.40 7.90 6.77 3.65 12.56
23/05/12 2.99 6.80 2.48 1.79 9.56 2.59 6.29 5.75 6.08 7.58 7.64 7.57 5.86 7.33 8.48 6.51 3.68 12.56
07/06/12 3.30 7.16 3.20 1.94 10.24 3.03 6.65 6.06 5.66 8.04 8.07 7.83 6.61 7.46 8.38 7.03 4.03 13.10
Minimum 2.99 6.73 2.48 1.70 9.56 2.59 6.09 5.58 5.19 7.57 7.23 7.35 5.85 7.33 7.88 6.51 3.55 12.56 11.04
Maximum 3.30 7.16 3.20 1.94 10.38 3.12 6.65 6.07 6.08 8.04 8.07 7.83 6.63 7.50 8.61 7.05 4.06 13.77 11.71
Range 0.31 0.43 0.72 0.24 0.82 0.53 0.56 0.49 0.89 0.47 0.84 0.48 0.78 0.17 0.73 0.54 0.51 1.21 0.67
[OCR of page images]
+GILBERT
SUTHERLAND
www.access.gs
Table 10.1 Groundwater level RL M AHD recorded during Lake Weyba groundwater monitoring
Slaaleliiare}
eFC
27/03/12 7.48 8.61 7.05 4.06 13.77 | 11.71
12/04/12 6.09 5.58 5.28 7.57 7.23 7.35 5.85 7.50 7.88 6.81 3.55 12.57 | 11.04
13/04/12 3.03 6.73 2.53 1.70 9.64 2.66
01/05/12 3.27 | 7.15 | 3.15 1.92 10.38 | 3.12 | 655 |607 | 519 | 7.96 | 8.01 7.82 | 663 | 7.48 | 8.16 | 688 | 4.05 12.57
09/05/12 3.22 7.05 2.78 1.91 9.99 2.86 6.48 5.88 5.20 7.78 7.87 7.64 6.32 7.40 7.90 6.77 3.65 12.56
23/05/12 2.99 6.80 2.48 1.79 9.56 2.59 6.29 5.75 6.08 7.58 7.64 | 7.57 5.86 7.33 | 8.48 6.51 3.68 12.56
07/06/12 3.30 7.16 3.20 1.94 10.24 | 3.03 6.65 6.06 5.66 8.04 8.07 7.83 6.61 7.46 8.38 7.03 4.03 13.10
Minimum 2:99 6.73 2.48 1.70 9.56 2.59 6.09 5.58 5.19 7.57 7.23 7.35 5.85 7.33 7.88 6.51 3.55 12.56 | 11.04
Maximum | 3.30 | 7.16 | 3.20 | 1.94 10.38 | 3.12 | 665 | 6.07 | 6.08 | 804 | 807 |7.83 | 663 | 7.50 | 8.61 7.05 | 4.06 13.77 | 11.71
Range 0.31 0.43 | 0.72 | 0.24 0.82 0.53 | 0.56 | 0.49 | 0.89 0.47 0.84 | 0.48 0.78 | 0.17 | 0.73 0.54 | 0.51 leo 0.67
Page 51
www.access.gs
+GILEERI
SlJ11-ERlAN)
Figure 10.1 Groundwater levels
LalCe Weyb31 Groulildw,atelll" M:Olll1liltoring IIDepdml ’to’’Groundw3lter
U.M
.GWl
1.4.00 .GVi12
I!!!I!!!I
IIiiiiIP AGW~
.. .. - -
XGW4
12..00
Q!
xGws.
$
::t:: .""" ’:t:’ OG,WEo
W.OO
:::t:: :1(, +(!:H.t
o
% ,0 0 "8H9
<
"’00
....
E
kJ ~ -(!:H20
~
!:!;: $ ~ ~ ~
~ ~ * .8H2~
.L -
~ :f:
Eo.OO
~ ... ~ !!i!!!!’
lIiiI(!:H26
- ., ..
A8H28
4.00 Xf!:H30
"!I! ..
I!!!’
0 C 0 X8H.tO
~ 0 ’j(!:H.t3
:LOO ~ ~ ".....
:X .x.
+8H.t5.
-(!:H.t8
C.OO
27.0~.20.12 12:. ._2012 .13_0.t.21U 01_OS.20:U 09.G.S.21l.12 2l.05._2 l2: 07_06.2012 f!:H58
BOIfe number
36 AGRICULTURE WATER ENVIRONMENT
[OCR of page images]
+-GILBERT
SUTHERLAND
Figure 10.1 Groundwater levels
WWW.aCCeSS.gS
Rim AHD
#.00
6.00
4.00
2.00
0.00
Lake Weyba Groundwater Monitoring | Depth to Groundwater
eaw1
@ow2
Gwe.
©
=Gws.
+ BHA
*BHO
1+ 4,
S
x
( o>Hme
X Db.
HH) O x
IDS a
=BH20
@BH23
@BH26
ABH28
*BH30
= BH40
OBHA3
x
*BH4S
“BHas
27.03.2012
12.04.2012
13.04.2012
01.05.2012
Bore number
09.05.2012
23.05.2012
07.06.2012 ~ BHSS
36
AGRICULTURE WATER ENVIRONMENT
Page 52
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Table 10.2 pH recorded during Lake Weyba groundwater monitoring
I Sampling
date
27/03/12
,-
s:
~
--
C\J
s:
~
--
C")
s:
~
--
"<t
s:
~
--
L()
s:
~
--
<D
s:
~
--
"<t
I
en
--
0’>
I
en
--
0
C\J
I
en
--
C")
C\J
I
en
--
<D
C\J
I
en
--
ex:>
C\J
I
en
--
0
C")
I
en
--
0
"<t
I
en
7.23
C")
"<t
I
en
7.18
L()
"<t
I
en
7.21
ex:>
"<t
I
en
7.15
ex:>
L()
I
en
7.35
L()
<D
I
en
7.11
12/04/12 -- -- -- -- -- --
5.07 4.36 4.99 2.80 5.17 4.95 --
5.46 5.19 4.73 4.97 -- --
13/04/12 4.47 4.23 4.71 6.51 4.82 4.73 -- -- -- -- -- -- -- -- -- -- -- --
4.12
01/05/12 4.67 5.06 5.20 6.37 4.87 4.51 -- -- -- -- -- -- -- -- -- -- -- -- --
02/05/12 -- -- -- -- -- --
4.66 4.22 --
4.13 4.54 4.43 4.35 4.14 3.98 3.95 4.07 -- --
07/06/12 10.6 9.32 10.46 14.58 13.38 12.05 9.46 9.00 8.45 8.35 9.56 9.69 9.00 8.23 7.22 7.27 6.93 9.63 --
Average 4.57 4.65 4.96 6.44 4.85 4.62 6.40 4.87 4.99 3.47 4.86 4.69 4.35 5.61 5.45 5.79 5.30 7.35 5.62
Notes: Data recorded on 07/06/12 excluded from data set due to erroneous results.
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 37
[OCR of page images]
WWW.acCCeSss.gs
Table 10.2 pH recorded during Lake Weyba groundwater monitoring
27/03/12 = - - = - -
12/04/12 | -- - ~ = - = 4.36
13/04/12 | 4.47 [4.23 [471 |651 | 482 | 473 --
01/05/12 | 467 | 5.06 | 5.20 | 637 | 4.87 | 4.51 -
02/05/12 | -- - - = - - 4.66_| 4.22
o7/e/i2 | 10.6 | 9.32 | 10.46 | 14.58 | 13.38 | 12.05 | 9.46 | 9.00
+GILBERT
SUTHERLAND
Average 4.57 4.65 4.96 6.44 4.85 4.62 6.40 4.87
Notes: Data recorded on 07/06/12 excluded from data set due to erroneous results.
10838_GWA_ELH2F.DOCX / NOOSA ON WEYBA / NORTHBROOK CORPORATION P/L - GROUNDWATER ASSESSMENT
37
Page 53
www.access.gs
+GILEERI
SlJ11-ERlAN)
Figure 10.2 Groundwater pH results
Lake Weyba !Gmundwal~er MoniJtoriili1ll1 pH
16.00
.Wl
x
lA.OO .
W2
::r:
.W~
x’ W4
11.00 -
;2; WS
ft g’ wi5
1.UO ...
+BH4
~
-SH:!
:c
.
iii.
!HIO
-Btl2ib
C t; .SH21
x x
6.00 .SH2I
’j(
0 ~ 8 .
BH:l
4.00
’11[0
~’ @ x BH3.@
xBH4
.
:;’BH43
1.00
+BH4S
-
BH4!
UO
2’. ~.2 12 12_()4.2 il i3_()4.20U 1.()S.2 12 2.0S..1’ll: 07.0!5..2012 BH58
Samp’JI’n,g <date
38 AGRICULTURE WATER ENVIRONMENT
[OCR of page images]
+GILBERT
SUTHERLAND
Figure 10.2 Groundwater pH results
38
16.00
14.00
10.00
= an
6.00
2.00
0.00
Lake Weyba Groundwater Monitoring | pH
rh e.
(ae
OE
oa
¢
www.access.gs
owl
Scaw2
Gw3
*owd
=GWws
@owe
* BHA
=BHo
Cie © «|X
= BH20
&
BH23
@BH26
ABH28
* BHO
* BHAD
BHAR
BH45
~ BH48
27.03.2012 12.04.2012 13.04.2012 01.05.2012 02.05.2012
Sampling date
07.06.2012 BH5S
AGRICULTURE WATER ENVIRONMENT
Page 54
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Table 10.3 Electrical conductivity (mS/cm)recorded during Lake Weyba groundwater monitoring
~~~~~~~~~~
27/03/12 -- -- -- -- -- --
m
--
m
-- --
m
--
~
m
--
~
m
--
~
m
--
~
m
0.13
~
m
0.12
~
m
0.09
~
m
0.10
~
m
0.06
~
m
0.10
12/04/12 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --
13/04/12 0.37 0.64 0.21 0.64 0.72 0.51 -- -- -- -- -- -- -- -- -- -- -- --
0.14
01/05/12 0.37 0.56 0.21 0.61 0.52 0.33 -- -- -- -- -- -- -- -- -- -- -- -- --
02/05/12 -- -- -- -- -- --
0.07 0.11 --
0.08 0.15 0.11 0.11 0.13 0.10 0.10 0.10 -- --
07/06/12 0.322 0.578 0.204 0.61 0.377 0.316 0.08 0.095 0.197 0.088 0.11 0.85 0.087 0.149 0.112 0.107 0.162 0.121 --
Avera e 0.35 0.59 0.21 0.62 0.54 0.39 0.08 0.10 0.20 0.08 0.13 0.48 0.10 0.14 0.11 0.10 0.12 0.09 0.12
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 39
[OCR of page images]
WWW.acCCeSss.gs
Table 10.3 Electrical conductivity (mS/cm) recorded during Lake Weyba groundwater monitoring
27/03/12
12/04/12
13/04/12
01/05/12
02/05/12 0.07 0.11 0.11
07/06/12 0.08 0.095 | 0.197 0.85
Average 0.08 | 0.10 | 0.20 0.48
10838_GWA_ELH2F.DOCX / NOOSA ON WEYBA / NORTHBROOK CORPORATION P/L - GROUNDWATER ASSESSMENT
0.11
0.087
0.10
+GILBERT
SUTHERLAND
39
Page 55
www.access.gs
+GILEERI
SlJ11-ERlAN)
Figure 10.3 Groundwater electrical conductivity results
IlLake ’W’e’ybal Giro undwateli" lMoln,ito ring I Electricall Condluctiwity
.90
.. GWj
6.S0 S; GW2
... GWl
’:1(:
j’0 x GW4
.
IilI
-
x GW5
v v
ll). O
Q G~!J
i;iI
!I;II
+ Btt4.
0 .X:
0.50
...
Btt9
5
~ -
Btt2
E
O.ill 0
. . ::t: .BttLl
Q 0 g BtI~
.10
... Btt28
x Btl3G
A ^ ,r,.
1l).20 _.
::t: BttoiWl
. n ~
J Btt43
,~ m
O.jO
"’t" ~ t " Btl4S
..
-
Btt4:8
6.00
27.03.201Z 12.04.2 12 13.M.20l2 i. .z0H 00.05.2012 0’)’.(Iij.2 12 Btt.s:8
Sam p;J I’n.g ,Ill :ate
40 AGRICULTURE WATER ENVIRONMENT
[OCR of page images]
+GILBERT WWw.access.gs
SUTHERLAND
Figure 10.3 Groundwater electrical conductivity results
Lake Weyba Groundwater Monitoring | Electrical Conductivity
0.90
a * cw
0.80 @ cw
& aw3
0.70 eeu
a i x GWSs
0.60
® awe
e . + BHA
x
oso 2
§ BH
a = BH20
° ° “ ® BH29
o @ sH26
0.30 >
& BH28
“ BH3O
0.20 4a a = .
BH4O
e x
®@ pHaa
a0 ¥
= © BHaS
- BHAS
0.00 - - - ,
27.03.2012 12.04.2012 13.04.2012 01.05.2012 02.05.2012 07.06.2012 = BHSe
Sampling date
40 AGRICULTURE WATER ENVIRONMENT
Page 56
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Table 10.4 Concentration of dissolved iron, dissolved aluminium, dissolved cadmium, dissolved chromium, dissolved copper, dissolved nickel, dissolved lead
and dissolved zinc (mg/L)recorded during Lake Weyba groundwater monitoring (results from sampling on the 13/04/12)
Sampling
date
l!’J C’J <0 ex:> 0 C’J l!’J ex:> l!’J
C\J C’J ’<I’ <0
’<I’ O’l C\J C\J C\J ’<I’ ’<I’ ’<I’ ’<I’ <0
S S S S S S I I I I I I I I I I
(9 (9 (9 (9 (9 (9 III III III III III III III III III III
Dissolved 0.23 5.19 0.18 <0.05 1.25 2.94 1.36 0.18 2.13 1.18 0.08 3.49 0.55 0.5 1.71 0.68
iron
Dissolved 1.0 0.45 0.04 0.02 0.13 0.14 0.27 0.06 0.18 0.05 0.05 0.06 0.04 <0.01 0.04 0.02
aluminium
Dissolved <0.0001 0.0003 <0.0001 <0.0001 0.001 0.0002 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001 <0.0001
cadmium
Dissolved 0.001 0.001 <0.001 <0.001 <0.001 <0.001 0.002 <0.001 <0.001 <0.001 <0.001 0.001 <0.001 <0.001 <0.001 <0.001
chromium
Dissolved 0.009 0.002 0.002 0.006 0.018 0.008 <0.001 <0.001 <0.001 0.001 <0.001 0.002 0.001 0.001 <0.001 0.001
copper
Dissolved 0.0012 0.047 0.002 0.002 0.048 0.047 0.001 0.002 0.004 0.002 0.001 0.004 0.002 0.002 0.001 0.003
nickel
Dissolved 0.002 0.003 <0.001 <0.001 <0.001 0.001 <0.001 0.009 0.008 <0.001 0.002 0.002 0.001 <0.001 <0.001 0.003
lead
Dissolved 0.292 0.446 0.151 0.112 0.742 0.40 0.022 0.05 0.069 0.048 0.02 0.149 0.065 0.081 0.071 0.051
zinc
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 41
[OCR of page images]
WWW.acCCeSss.gs
+GILBERT
SUTHERLAND
Table 10.4 Concentration of dissolved iron, dissolved aluminium, dissolved cadmium, dissolved chromium, dissolved copper, dissolved nickel, dissolved lead
and dissolved zinc (mg/L) recorded during Lake Weyba groundwater monitoring (results from sampling on the 13/04/12)
Sampling
(oE\
Dissolved
iron
Dissolved 1.0 0.45 0.04 0.02 0.13 0.14 0.27 0.06 0.18 0.05 0.05 0.06 0.04 <0.01 0.04 0.02
aluminium
Dissolved <0.0001 | 0.0003 <0.0001 | <0.0001 | 0.001 0.0002 <0.0001 | <0.0001 | <0.0001 | <0.0001 | <0.0001 | <0.0001 | <0.0001 | <0.0001 | <0.0001 | <0.0001
cadmium
Dissolved 0.001 0.001 <0.001 <0.001 <0.001 <0.001 0.002 <0.001 <0.001 <0.001 <0.001 0.001 <0.001 <0.001 <0.001 <0.001
chromium
Dissolved 0.009 0.002 0.002 0.006 0.018 0.008 <0.001 <0.001 <0.001 0.001 <0.001 0.002 0.001 0.001 <0.001 0.001
copper
Dissolved 0.0012 0.047 0.002 0.002 0.048 0.047 0.001 0.002 0.004 0.002 0.001 0.004 0.002 0.002 0.001 0.003
nickel
Dissolved 0.002 0.003 <0.001 <0.001 <0.001 0.001 <0.001 0.009 0.008 <0.001 0.002 0.002 0.001 <0.001 <0.001 0.003
lead
Dissolved 0.292 0.446 0.151 0.112 0.742 0.40 0.022 0.05 0.069 0.048 0.02 0.149 0.065 0.081 0.071 0.051
zinc
10838_GWA_ELH2F.DOCX / NOOSA ON WEYBA / NORTHBROOK CORPORATION P/L - GROUNDWATER ASSESSMENT
a
Page 57
www.access.gs
+GILEERI
SlJ11-ERlAN)
Figure 10.4 Groundwater dissolved iron results
Lake W’eyba Groull’IldwaJter Moniitorill’llg I Diissolvoo Ilron
6
.
s.
4.
.
,d
1il;,3. ..
E
.
2.
.
.
. .
l!.
.
..
. . .
.
0
GWl G\1!/.2 W~ GW4 Gws. W6 flH.:l. 8H9 BH2:3 8H26 Bti2.8 BH.:lO 8H4I3 B.H4S BH48 BH6S
Bore nlJJRber
42 AGRICULTURE WATER ENVIRONMENT
Page 58
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Figure 10.5 Groundwater dissolved aluminium results
Lake Wevba GroulIl,dw,ater MloDlitorhmg I DJessolived .Alumilll1liiulm
1..2
.A
.1
’:0"
.a.
,d
1il;, IHi
.
E
.
0.4
.
0.2
.
..
. ... .
. .
. .
0
aWl Gw2 GW~ ,I5W4 GWS GW6 HifI ElH!) ~H2~ I’!H21’i BH2S Eltl4 ElH4~ H~5 ElH4S Eltl65
Bore nl!J:m’ber
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 43
Page 59
www.access.gs
+GILEERI
SlJ11-ERlAN)
Figure 10.6 Groundwater dissolved cadmium results
La,ke Weyba Groundw3111er Monlltorlli1lg I Diissolv,ed Cadmium
Oi2
1).001
O.Oooa.
~
’lli I) 0006
’
E
0,0004.
.
A.
U002 ...
. .. ..........
0
~Wl aM G’Wl GW4 aws (!;IN6 EHt4 flH9 H23 IlIH26 BtiU! BH4 8H.t3 IlIH4S etl48 HfiS
Bore number
44 AGRICULTURE WATER ENVIRONMENT
Page 60
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Figure 10.7 Groundwater dissolved chromium results
Lake W!evba GiroUlndwater Monlitoring I Dls;solved !ChromlulU,
025
A
(,-002 ....
0.0015
~
’l!i,
E
A ... ... .... ... .... ... .... .... ... .... ... ... .... ...
01 .... ,.. .... ,.. ".. ".. ,.. .... .... .... .... .... .... ....
0.0005
o
~Wl aW:2 aWl GW4 I:3WS GVi,!6 El<H4 flH9 f!,H23 I3H26 BtiU! BH4 flH.t3 I3H4S fl,ti48 HfiS
(lOll!number’
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 45
[OCR of page images]
www.access.gs
Figure 10.7 Groundwater dissolved chromium results
Lake Weyba Groundwater Monitoring | Dissolved Chromium
0.0025
o002 + ¢
0.0015 +
mel
0.001 +—@ + ¢ + ¢ wr ¢ ¢ @ ¢
0.0005 9
cowl Gwe Gw3 ows Gws Gwe BHA BHI BH23 BH26 BH28
Bore nurnber
10838_GWA_ELH2F.DOCX / NOOSA ON WEYBA / NORTHBROOK CORPORATION P/L — GROUNDWATER ASSESSMENT
BRAG
HAS
BHaS
BHAS
BHES
+GILBERT
SUTHERLAND
45
Page 61
www.access.gs
+GILEERI
SlJ11-ERlAN)
Figure 10.8 Groundwater dissolved copper results
Lake Weyba GroulI’lIldwater Mlonitorlng IllDi:Ssoluedl Copper
2
....
0.018 ...
O.cll
0.0141
0.012
~
foli, IH l
.
E
.
......
.~ ,...
o.oOEi
0.0001
’"" ...... ’""
0.002 ....
- -
..... ....
o
OW.1 2 aW3 ,1SW4 GW.s. GW!5 ~H4 ElH:9 BHn f3H26 E!;H2S ElH40 ~H43 ElH4S flH48 Ml S,
filor’lef’lwmer
46 AGRICULTURE WATER ENVIRONMENT
[OCR of page images]
+ GILBERT www.access.gs
SUTHERLAND
Figure 10.8 Groundwater dissolved copper results
Lake Weyba Groundwater Monitoring | Dissolved Copper
0.02
o.o18 +
0.016
0.014
0.012
0.01
mel
0.008 +
0.006 ¢
0.004
0.002 ¢ ¢ *
e we ¢ ¢ e ¢ ¢ ¢ ¢
Gwi ew Gw3 ow ows Gwe BHA BHS BH23 BH26 BH26 BH4aG BH43 BHAS BHa8 BHES
Bore number
46 AGRICULTURE WATER ENVIRONMENT
Page 62
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Figure 10.9 Groundwater dissolved nickel results
Lake Weyba ’Groull’lldwat,er Monij1nrln~ I Di:Ssoht,ed [Nickel
IHI6
(I.OS
.
. .
OJht
~
~’ 03
.
E
0.02
.
0..01
. .
.
.. . . ..
. . .
0
GWl ,GW2 GW3 G.....4 GWs. rGW6 f!H4 BH9 f!H23 f!H26 f!H28 BH4 EHt43 BH4S BH4S I’IH1
Borenumiler
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 47
[OCR of page images]
www.access.gs
Figure 10.9 Groundwater dissolved nickel results
Lake Weyba Groundwater Monitoring | Dissolved Nickel
0.06
0.05
0.02
0.01
¢
e¢ ¢ o ? @ «6
Gwi GW? GW3 ow ows ‘GWE BH4 BHO BH23 BH26 BH2a
Bore number
10838_GWA_ELH2F.DOCX / NOOSA ON WEYBA / NORTHBROOK CORPORATION P/L — GROUNDWATER ASSESSMENT
¢
BRAD
e
BHAS
¢
BHAS
Ad
BHAS
¢
BHES.
+GILBERT
SUTHERLAND
47
Page 63
www.access.gs
+GILEERI
SlJ11-ERlAN)
Figure 10.10 Groundwater dissolved lead results
La,ke Weyba Groundwater Moniitorl.,g I Dlssoh/,ed lead
i
"""
0.009 ’:’"
...
!)_OM ’""
o.oo’,\’
O.OM
~
’lli 0005
.
E
O.OM
....
0.003 .. ..
... ... ....
0.002 ... ... :-or
... A. ... .... A. ... ... A.
0.001 ..- ..
...... ..... .-
..... .....
. .
o
r::;Wi GWl aW3 GW4 a:w.s. GW6 EJ;H4 ElH9’ Bti2:3. H2 E!;H2S f3H40 H43 Bti4S flH48 Ml S,
I>iore IIlllJmlber
48 AGRICULTURE WATER ENVIRONMENT
[OCR of page images]
+GILBERT
SUTHERLAND
Figure 10.10 Groundwater dissolved lead results
48
0.01 7
0.009 +
0.008 +
0.007 +
o.006 +
a
3 0.005
o.00a +
oo03 +
0.002 +
0.001 7
Lake Weyba Groundwater Monitoring | Dissolved Lead
www.access.gs
Gwi
Gwe
GW
ow
SWS
Gwe
BHa
BHS BH23
Bore number
BH26
BH28
BHAG
BHaS
BHAS BHas BHBES
AGRICULTURE WATER ENVIRONMENT
Page 64
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Figure 10.11 Groundwater dissolved zinc results
La,ke W’eyba Groundwatter Monlitloring I DilSiSOlved Zinc
.a.
.
.?
O.S
.S
.
~
1iJ 0..4
.
-
0.3
.,
0..2
. .
.
III
..
. .
. . .
. .
(I
.~Wl GW:2 G’\I\,!’l GW4 ~ws GW6 BH4 H9 BHll BH2S BH28 ElH<lO BH4S HotS BH48 BH6S
ore’ number
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 49
Page 65
www.access.gs
+GILEERI
SlJ11-ERlAN)
Table 10.5 Total anions (meq/L),total cations (meq/L)and ionic balance (%)recorded during Lake Weyba groundwater monitoring (results from sampling on
the 13/04/12)
I Sampling
date
Total
,-
S
C)
4.01
I~
8.27
CI)
S
C)
1.49
’<t
S
C)
6.60
L{)
S
C)
8.85
to
S
C)
5.25
’<t
I
III
0.77
I
(j)
III
0.70
CI)
C\J
I
III
0.60
to
C\J
I
III
1.38
co
C\J
I
III
0.69
0
’<t
I
III
1.01
CI)
’<t
I
III
0.81
L{)
’<t
I
III
1.68
co
’<t
I
III
1.69
L{)
to
I
III
0.74
anions
Total 4.16 8.01 1.45 6.44 8.54 5.20 0.69 0.69 0.48 1.22 0.65 0.99 0.77 1.56 1.82 0.73
cations
Ionic 1.8 1.61 1.58 1.28 1.78 0.52 5.19 1.00 11.4 6.40 3.42 0.85 2.04 --
3.66 0.67
balance
50 AGRICULTURE WATER ENVIRONMENT
Page 66
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Figure 10.12 Groundwater total anion results
Lake Weyba Gmul1ldwater Mlonltorlng I Total Anhms
ill
9
.
.
8
,
.
Ii;
i5 .
~
A.
4 ....
~
2.
..
. .
’"’"
1 -
.. . . .
.
I)
GiliV1. {;;\’i2 GWl G\’14 GINS G’w6 IiH4 (lif!i EJ,H 3: 1!11-I26 0028 81-1otCl Eiti4l 81-145 BHlI Bit6~
Bore’lRwmjber
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 51
Page 67
www.access.gs
+GILEERI
SlJ11-ERlAN)
Figure 10.13 Groundwater total cation results
La,ke Weyba Groundwarter Monlitli!)ri~g I TrO’tal1 Caltffions
9
.
.....
8: .....
1
.
6
.
5
i
~ .
4
3
:1
.
. .
. .....
1 .....
.. . .
.
.
o
G~Vl GW2 ClW3 GW4 GWS GWIS Bti4 flH9’ BH23 Ii 1-126 ii S Bti4JO BHII3 Ii1-1 <is ii48 Bti6S
BOlle I’1UIin brer
52 AGRICULTURE WATER ENVIRONMENT
[OCR of page images]
+-GILBERT
SUTHERLAND
Figure 10.13 Groundwater total cation results
WWW.aCCeSS.gS
Lake Weyba Groundwater Monitoring | Total Cations
L
meq/l
A °
e e
¢ a
SW1 Gw2 Gw3 ows ows GWE BH4 BHI BH23
Bore number
BH26 BH28
BH40
BH43 BHaS BRAS BHeS.
52
AGRICULTURE WATER ENVIRONMENT
Page 68
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Figure 10.14 Groundwater ionic balance
Lake Weyba Groull’ldwat!er Monitoring I ~oni:c:: Bal1a,nce
1.2.
.
10
8
.
*’ 6
.
4
.
.
2
.
.. .
.
. .
. .
-
I)
GiliV1. {;;\’i2 GWl G\’14 GINS G’w6 IiH4 (lif!i EJ,H 3: 1!11-I26 0028 81-1otCl Iiti43. 81-145 BHlI Bit6~
Bore’lRwmjber
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 53
[OCR of page images]
www.access.gs
Figure 10.14 Groundwater ionic balance
Lake Weyba Groundwater Monitoring | lonic Balance
12
e
10
a
e
# 6
¢
4
*
¢
? e
+ o ¢ *
° e
e ° °
0 a
GW Gw2 awa awd GWS ‘Gwe BH4 BH9 BH23 BH26. BH28 BHO BH43 BHAS BHag BHES
Bore number
10838_GWA_ELH2F.DOCX / NOOSA ON WEYBA / NORTHBROOK CORPORATION P/L — GROUNDWATER ASSESSMENT
+GILBERT
SUTHERLAND
53
Page 69
www.access.gs
+GILEERI
SlJ11-ERlAN)
Figure 10.15 Piper diagram
Piper Diagram
Legend
GW1
.
:z: GW2
D GW3
o GW4
6. GW5
GW6
o BH4
BH9
BH23
BH26
.
BH28
BH40
BH43
BH45
.
:z: BH48
*BH65
I
6 ’ ’bo 0\0
~* -*" "*" 0" ~ ~
_Ca- -CI_
54 AGRICULTURE WATER ENVIRONMENT
[OCR of page images]
+GILBERT
SUTHERLAND
Figure 10.15 Piper diagram
54
Piper Diagram
se
S
Legend
ecw
Gw2
Gw3
Gw4
\ GWS
Gwe
BH4
BHO
BH23
m BH26
BH28
BH40
BH43
® BH4S
BH48,
* BHES
www.access.gs
AGRICULTURE WATER ENVIRONMENT
Page 70
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Figure 10.16 Durov diagram
Durov Diagram
Legend
GW1
.
:z: GW2
D GW3
o GW4
6 GW5
TDS (mgIL)
GW6
"" ’" ... ’" ’" ..... co < o BH4
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 BH9
BH23
BH26
.
BH28
BH40
BH43
BH45
.
:z: BH48
G’" GW1
*BH65
Xl’, .
*0 "
0
).
pH
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 55
[OCR of page images]
WWW.acCCeSss.gs
Figure 10.16 Durov diagram
100% Mg
&
ols
3
Durov Diagram
100% SO,
%
%
g, ge TDS (mg/L)
SRA wa “OF ie
gy ee gagegaggs
5 3335 53 3 3 8
[ ews
gil XA 7
ns
10838_GWA_ELH2F.DOCX / NOOSA ON WEYBA / NORTHBROOK CORPORATION P/L —- GROUNDWATER ASSESSMENT
Legend
ecw
Gw2
Gw3
Gw4
\ GWS
Gwe
BH4
BHO
BH23
m BH26
BH28
BH40
BH43
® BH4S
BH48,
* BHES
+GILBERT
SUTHERLAND
55
Page 71
www.access.gs
+GILEERI
SlJ11-ERlAN)
Table 10.6 Total nitrogen (mg/L)recorded during Lake Weyba groundwater monitoring
Sampling
date ,- N ~ ~ ~ ~
~ ~ 00 0 ~ ~ 00 ~
~ m N N N ~ ~ ~ ~ ~
s S s s s s I I I I I I I I I I
~ ~ ~ ~ ~ ~ rn rn rn rn rn rn rn rn rn rn
_1B!II....___~___I.Em__..._...__
56 AGRICULTURE WATER ENVIRONMENT
Page 72
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Figure 10.17 Groundwater total nitrogen results
Lalk,e W’eylba Gr,oundWalter Monlitorlng I Total Nitrogenl
!it
.
!ro
10
6
5
~
’l!i,
E
.w
34)
20
10
. .
..... . .A .. .A . ..
I)
G’\o’l,i’l ’(3w2 G\Il!:3 Gw4 aws GW I3H4. BJf9 flHn H2fi I3H2! BH40 f!H43 flH4S f!H.tS I’!H5S
lio:re number
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 57
Page 73
www.access.gs
+GILEERI
SlJ11-ERlAN)
Table 10.7 Total phosphorous (mg/L)recorded during Lake Weyba groundwater monitoring
Sampling
date ,- N ~ ~ ~ ~
~ ~ 00 0 ~ ~ 00 ~
~ m N N N ~ ~ ~ ~ ~
s S s s s s I I I I I I I I I I
~ ~ ~ ~ ~ ~ rn rn rn rn rn rn rn rn rn rn
-----------------
58 AGRICULTURE WATER ENVIRONMENT
Page 74
+GILtERI
www.ac ss.gs
SUT1-ERlAN)
Figure 10.18 Groundwater total phosphorus
Ilake Weybal Girol.llndwater Mon itol1i’lling I Totall Ph;osphomus
l6
.
14
i.l
lO
~
’l!i, 8
E
6
4
1
.
.....
..A. .. ..... A .6. A ..
I) ... ... ...
G’\o’l,i’l ’(3w2 GW:3 Gw4 aws GW6 I3H4. Btf9 flHn H2fi BH2! fl.tt40 8H43 flH4S 8H-tS BH5S
lio:re number
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 59
Page 75
+GILBERI
Sl
10 Appendix 4 -
Laboratory certificates
60 AGRICULTURE WATER ENVIRONMENT
[OCR of page images]
+GILBERT
SUTHERLAND
10 Appendix 4 — Laboratory certificates
60
AGRICULTURE WATER ENVIRONMENT
Page 76
FDod&
Pharmaceutical Industrial
-
~
.iI’=>.
~,^
.~
-
GrDUp
Environmental Division
CERTIFICATE OF ANALYSIS
Work Order :
EB1209942 Page : 1 of 10
Client : GILBERT & SUTHERLAND PTY LTD Laboratory : Environmental Division Brisbane
Contact : MS KATE BAIRSTOW Contact : Charles Tibbitts
Address : SU ITE 20 115 WICKHAM ST Address : 32 Shand Street Stafford OLD Australia 4053
FORTITUDE VALLEY OLD, AUSTRALIA 4006
E-mail : bairstow,ka@access,gs E-mail : Charles.Tibbitts@alsglobaLcom
Telephone : +61 0738523999 Telephone : +61732437122
Facsimile : +61 0738523933 Facsimile : +61732437218
Project : 10838 QC Level : NEPM 1999 Schedule B(3) and AlS OCS3 requirement
Order number
C-O-C number Date Samples Received : 13-APR-2012
Sampler : Katy Bairstow Issue Date : 23-APR-2012
Site : lake Weyba
No. of samples received : 16
Quote number : BN/694/11 No. of samples analysed : 16
This report supersedes any previous report(s) with this reference. Results apply to the sample(s) as submitted. All pages of this report have been checked and approved for
release.
This Certificate of Analysis contains the following information:
.General Comments
.Analytical Results
^ NATA Accredited Laboratory 825 Signatories
This document has been electronically signed by the authorized signatories indicated below. Electronic signing has been
Accredited for compliance with carried out in compliance with procedures specified in 21 CFR Part 11.
NATA ISO/IEC 17025. Position Accreditation Category
Signatories
V Andrew Epps
Jonathon Angell
Metals Production Chemist
Inorganic Coordinator
Brisbane Inorganics
Brisbane Inorganics
WORLD RECOGNISED
ACCREDITATION Stephen Hislop Senior Inorganic Chemist Brisbane Inorganics
Address 32 Shand Street Stafford QlO Australia 4053 PHONE +61-7-32437222 Facsimile +61-7-32437218
Environmental Division Brisbane ABN 84009936029 P rt f th ALS G A C
.. b II B th L’ de .
www.alsglobal.com
RIGHT SOLUTions RIGHT PARTnER
Page 77
Page
Work Order
Client
Project
2 of 10
EB1209942
GILBERT & SUTHERLAND PTY LTD
10838
A
General Comments
The analytical procedures used by the Environmental Division have been developed from established internationally recognized procedures such as those published by the USEPA, APHA, AS and NEPM. In house
developed procedures are employed in the absence of documented standards or by client request.
Where moisture determination has been performed, results are reported on a dry weight basis.
Where a reported less than (<)result is higher than the LOR, this may be due to primary sample extract/digestate dilution and/or insufficient sample for analysis.
Where the LOR of a reported result differs from standard LOR, this may be due to high moisture content, insufficient sample (reduced weight employed) or matrix interference.
When sampling time information is not provided by the client, sampling dates are shown without a time component. In these instances, the time component has been assumed by the laboratory for processing purposes.
Key: CAS Number = CAS registry number from database maintained by Chemical Abstracts Services. The Chemical Abstracts Service is a division of the American Chemical Society.
LOR = Limit of reporting
^ =
This result is computed from individual analyte detections at or above the level of reporting
.EG020-T (Total Metals): LORs for EB1209942-010 (BH65)have been raised due to matrix interference.
Page 78
Page
Work Order
Client
Project
:
:
3 of 10
EB1209942
GILBERT & SUTHERLAND PTY LTD
10838
A
Analytical Results
Sub-Matrix: WATER Client sample 10
Client sampling date /time
EB 1209942-001 EB1209942-002 EB 1209942-003 EB1209942-004 EB 1209942-005
---
EG020F: Dissolved Metals by ICP-MS I
0.06
--
EG020T: Total Metals by ICP-MS I
13.2
Page 79
Page
Work Order
Client
Project
: 4 of 10
:
EB1209942
GILBERT & SUTHERLAND PTY LTD
10838
A
Analytical Results
Sub-Matrix: WATER Client sample 10
Client sampling date /time
EB 1209942-001 EB1209942-002 EB 1209942-003 EB1209942-004 EB 1209942-005
Page 80
Page
Work Order
Client
Project
:
:
5 of 10
EB1209942
GILBERT & SUTHERLAND PTY LTD
10838
A
Analytical Results
Sub-Matrix: WATER Client sample 10
Client sampling date /time
EB 1209942-006 EB1209942-007 EB1209942-008 EB1209942-009 EB 1209942-010
---
EG020F: Dissolved Metals by ICP-MS I
0.05
--
EG020T: Total Metals by ICP-MS I
2.20
Page 81
Page
Work Order
Client
Project
:
:
6 of 10
EB1209942
GILBERT & SUTHERLAND PTY LTD
10838
A
Analytical Results
Sub-Matrix: WATER Client sample 10
Client sampling date /time
EB 1209942-006 EB1209942-007 EB1209942-008 EB1209942-009 EB 1209942-010
Page 82
Page
Work Order
Client
Project
:
:
7 of 10
EB1209942
GILBERT & SUTHERLAND PTY LTD
10838
A
Analytical Results
Sub-Matrix: WATER Client sample 10
---
EG020F: Dissolved Metals by ICP-MS I
0.45
--
EG020T: Total Metals by ICP-MS I
0.88
Page 83
Page
Work Order
Client
Project
:
:
8 of 10
EB1209942
GILBERT & SUTHERLAND PTY LTD
10838
A
Analytical Results
Sub-Matrix: WATER Client sample 10
Page 84
Page
Work Order
Client
Project
:
:
9 of 10
EB1209942
GILBERT & SUTHERLAND PTY LTD
10838
A
Analytical Results
Sub-Matrix: WATER Client sample 10
---
EG020F: Dissolved Metals by ICP-MS I
---
EG020T: Total Metals by ICP-MS I
Page 85
Page
Work Order
Client
Project
:
10 of 10
EB1209942
GILBERT & SUTHERLAND PTY LTD
10838
A
Analytical Results
Sub-Matrix: WATER Client sample 10
Page 86
www.ac
+GILtERI
ss.gs
SUT1-ERJ.AN)
11 Appendix 5 -
Groundwater Management Plan
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT
Page 87
PROJECT
rwo~)sa
on weyba
CONCEPTUAL
GROUNDWATER
MANAGEMENT PLAN
NOOSA ON WEYBA
DEVELOPMENT,WEYBA
DOWNS, QUEENSLAND
PREPARED FOR
NORTHBROOK CORPORATION PTY LTO
DATE
JULY 2012
Page 88
DOCUMENT CONTROL
DOCUMENT 1 0838_GWMP_REH1 D.docx
TITLE Conceptual Groundwater Management Plan, Noosa on Weyba Development,
Weyba Downs, Queensland
PROJECT MANAGER E. Holton
AUTHOR(S) E. Holton
CLIENT Northbrook Corporation Pty Ltd
CLIENT CONTACT Steve MacRae
CLIENT REFERENCE _
Noosa on Weyba Development
SYNOPSIS This report constitutes a groundwater management plan for the earthworks
phase of the Noosa on Weyba Development, Weyba Downs, Queensland.
REVISION HISTORY
REVISION # DATE EDITION BY APPROVED BY
20/07/2012 E. Holton L. Varcoe & C. Anderson
2
DISTRIBUTION
REVISION NUMBER
Distribution 2 345 6 7 8 9 10
Northbrook Corporation Pty Ltd
G&S library and file
Brisbane Sydney Melbourne and regions Agriculture.Water. Environment.
20/115 Wickham Street Fortitude Valley Brisbane OLD 40061 PO Box 694 Fortitude Valley OLD 4006
Phone 07 3852 3999 I Email [email protected] I www.access.gs
Page 89
www.ac ss.gs +GIL. 1
SlJT1-ERI.AN)
SUMMARY
Northbrook Corporation Pty Ltd commissioned Gilbert & Sutherland
Pty Ltd (G&S)to prepare a Groundwater Management Plan
(GWMP)for the earthworks phase of the Noosa on Weyba
Development, Weyba Downs, Queensland.
This GWMP provides indicative management strategies and
measures for the disturbance of groundwater associated with the
bulk earthworks phase of the Noosa on Weyba development. Due
to the preliminary nature of the development proposal at the time of
preparation of the GWMP,the proposed management measures
are alsogeneral in nature. It is intended that additional detail would
be added to the GWMP (where required) at the detailed design
phase of the development.
1 0838_GWMP_REH1 F.DOCX / NOOSA ON WEYBA / GWMP 3
Page 90
www.ac ss.gs
+GILI
SUT1-ERI.AN)
CONTENTS
Groundwater management plan ..........................................
.......6
1.1 Aims and objectives.......................................................... 6
1.2 Implementation..................................................................6
1.3 GWMP structure................................................................6
1.4 Definitions ............................8
.............................................
1.5 Commitments............ ............................8
............................
2 Management of potential impacts ..................
............................9
2.1 Contractor management .................................................
10
2.2 Construction phase drawdown management.................. 11
2.3 Groundwater monitoring ..................................................
13
3 Administration of the GWMP ....................................................
15
3.1 Amendment of the GWMP ..............................................
15
3.2 Incident management............. .........................................
15
4 Limitations of reporting....... ......................................................
16
4 AGRICULTURE WATER ENVIRONMENT
Page 91
www.ac ss.gs +GILtERI
Sl
ABBREVIATIONS
TERM MEANING
Australian Height
National reference for relative height measurement in Australia
Datum (AHD)
ASSMP Acid Sulfate Soil Management Plan
DEHP Department of Environment and Heritage Protection (formerly DERM)
EP Act Queensland Environmental Protection Act 1994
EPBC Act Environmental Protection and Biodiversity Conservation Act 1999
GWMP Groundwater Management Plan
1 0838_GWMP_REH1 F.DOCX / NOOSA ON WEYBA / GWMP 5
The text continues on page 92.
Used in these records
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.