Skip to the record
Accept no substitutions.

Council archive · source document

Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208

of 103

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                  www.ac   ss.gs
    +GILEERI
Sl



1      Groundwater management plan


1 .1   Aims and objectives

The principal objective of this GWMP is to provide mitigation measures to minimise the potential impacts of
the development scenario.


Additionally, the management plan provides information on specific site management issues relating to
potential environmental impacts of the earthworks phase of the development. It is intended that this GWMP
would be amended and expanded where required to incorporate additional information at the detailed design

phase of the development.

The control measures detailed in this GWMP have been developed to minimise impacts on the environment
and achieve the following objectives:


       Appropriate stewardship of natural resources,

       Protection of flora and fauna habitats,


       Confirmation of the success of impact control measures by the means of monitoring,


       Compliance with statutory requirements.

1.2    Implementation
This management plan requires the Developer to mitigate the potential environmental impacts associated
with the development of Noosa on Weyba site.


It is intended that the management plan will provide a set of performance criteria and guiding principles with
which the engineering designs for the development will comply. The plans and specifications forming part of
the construction contract for each stage should also include these performance criteria.


1.3    GWMP structure

The GWMP is based on a series of tables which detail the issues to be managed during the construction

phase of the project, the performance criteria, implementation measures, monitoring, reporting, and the
corrective action. The party responsible for the implementation of the measures will be included in the table

prior to works commencing.

The format is presented below for reference purposes.




6                                                                         AGRICULTURE WATER ENVIRONMENT

Used in these records

About this file

File size
60.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12_0208.pdf · 60.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.