Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208
Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
Cardno June 2012. ’Geotechnical
3 Method
Investigation, Noosa on Weyba Master Plan
Development’.
An overview of the scope and methods adopted to
3.2 Groundwater monitoring bore
complete this study are briefly outlined below:
network
A desktop assessment of relevant, available,
A total of 15 groundwater bores were previously
current and historical aerial photographs,
constructed across Lot 53 on SP163571 by
topographic maps and LlDAR data.
Golder Associates in 2007. A number of bores
A site inspection to locate and examine
have since been damaged or destroyed and our
existing groundwater bores. initial site inspection located a total of 13
Construction of six (6)additional bores in remaining bores suitable for groundwater
selected locations across the developable monitoring. No existing groundwater bores were
area of the site. located on Lot 11 on RP893393.
Groundwater monitoring across the entire
To supplement the existing monitoring bore
bore network (13existing, 6 new).
network on Lot 53 and establish a monitoring
Full laboratory analysis across the monitoring network on Lot 11, G&S installed a total of six (6)
bore network (one round). additional groundwater bores. The groundwater
Monitoring for in-situ parameters including bores were located to achieve the following:
groundwater level across the monitoring bore Supplement the existing groundwater
network (6 rounds).
monitoring network at the site
Development of a conceptual groundwater Assess the influence of site stratigraphy on
model using Visual MODFLOW Pro to
groundwater quality and flow
characterise groundwater levels, velocities
Facilitate collection of a data set upon which
and flow direction.
to base an initial groundwater model
Scenario testing to predict the likely impact of
Increase reliability of groundwater calculations
the proposed development on the
and modelling.
groundwater environment.
Drilling was conducted by Gilbert & Sutherland
3.1 Desktop assessment Pty Ltd using a Wirth 10s drilling rig. Boreholes
The following reports and information were (1OOmm diameter) were drilled to a maximum
considered as part of this report: depth of 6 metres below NSL.
Golder Associates Pty Ltd, ’Geo-
Monitoring wells were constructed and installed in
Environmental Investigation Proposed Lot
accordance with the Minimum Construction
Reconfiguration Lot 53 on SP163571, Hollett
Requirements for Water Bores in Australia.1
Road Noosaville’, Queensland, Version 1.0,
Machine-slotted well screens, casing and end
July 2010.
caps were constructed using PN 9 PVC-U
Gilbert & Sutherland Pty Ltd, ’Effluent pressure pipe and secured by threaded joints. The
Disposal and Stormwater Assessment, inside diameter of each well was 50mm to allow
Proposed Windsong Resort and Spa for development and sample collection using a
Development, Noosa’, September 2002. stainless steel bailer.
Sunshine Coast Regional Council Land
Information Services, L1DAR Data.
Geological Survey of Queensland 1 :100,000 1
Minimum Construction Requirements for Water Bores in
Geology Series Map No 9543 (Brisbane).
Australia, Edition 3 (2012). National Uniform Drillers Licensing
Committee.
14 AGRICULTURE WATER ENVIRONMENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.