Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208
Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
Table 3.2.1 Groundwater bore survey details
I Borehole Constructed by I Easting Northing Elevation RL (m)AHD
GW1 G&S 504944.7 7076954.6 3.3
GW2 G&S 504873.4 7077157.7 7.3
GW3 G&S 505091.2 7077233.5 3.2
GW4 G&S 505168.1 7076251.9 1.3
GW5 G&S 505859.6 7076305.3 10.8
GW6 G&S 506024.9 7076366.1 3.5
BH4 Golder & Assoc. 503897.5 7076626.9 6.7
BH9 Golder & Assoc. 503957.3 7076821.1 6.3
BH20 Golder & Assoc. 503983.3 7077074.7 6.6
BH23 Golder & Assoc. 503908.6 7076930.8 8.2
BH26 Golder & Assoc. 503862.5 7076799.9 8.3
BH28 Golder & Assoc. 503802.9 7076701.9 7.9
BH30 Golder & Assoc. 504069.8 7076638.8 6.8
BH40 Golder & Assoc. 504394.7 7076992.9 7.5
BH43 Golder & Assoc. 504463.8 7077119.3 9.0
BH45 Golder & Assoc. 504555.1 7077185.3 7.4
BH48 Golder & Assoc. 504658.2 7077369.6 4.2
BH58 Golder & Assoc. 504374.8 7076844.6 14.7
BH65 Golder & Assoc. 504315.7 7076626.3 12.9
The gravel pack surrounding the well screens conducted on each monitoring occasion with
consisted of washed, inert, 1.8-3mm river sand. A levels initially measured as depth from the top of
filter sock was placed over the screened section the monument and later converted to RL m AHD.
of the wells. Bentonite pellets were placed above
the gravel pack at a thickness of at least 200mm Prior to collection of samples for water quality
and hydrated for at least 3hrs to promote swelling. analyses groundwater bores were purged and
A minimum 200mm of cement grout was then allowed to recharge. Recharge rates were slow at
a number of locations requiring sample collection
placed over the bentonite and a lockable Steel
monument (100x1 OOmm)was concreted in place to be undertaken the following day.
over the well-head for protection. The well-head
Insitu analyses was undertaken on a total of 6
stickup (from NSL) wasgenerally 750mm in
occasions. Collected groundwater samples were
height. The borelogs are attached as Appendix 2.
ana lysed insitu for pH, temperature and electrical
JFP Urban Consultants surveyed the location and conductivity. Full laboratory analyses was
elevation of each bore in May 2012. The results of undertaken on one (1)occasion with samples
analysed for major cations (calcium, magnesium,
the survey are provided in Table 3.2.1. The
location of each of the bores is shown on Drawing sodium, potassium) and anions (chloride, sulfate,
No. 10838.3.2. alkalinity) and total and dissolved metals
(aluminium,arsenic, cadmium, chromium, copper,
3.3 Groundwater monitoring nickel, lead, zinc and iron. Samples were
collected in laboratory-supplied containers and
Monitoring of groundwater levels and quality was
transported in a chilled esky to a NATA-accredited
undertaken on a number of occasions to
laboratory for sample analysis.
characterise groundwater at the site and to inform
preparation of the conceptual groundwater model. 3.4 Site soil permeability
A total of 6 rounds of groundwater monitoring To assist in the set-up of the MODFLOW model,
were conducted at the site from March to June permeability testing of the soils surrounding each
2012. Groundwater level monitoring was of the groundwater bores was undertaken using
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)