Council archive · source document
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208
Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
www.ac ss.gs +GILtEHI
SUT1-ERI.AN)
Table 4.4.1 -
Measured site permeability results 4.7.6 Earthworks phase impacts on nearby
sensitive receivers
I (m~m)I (m2)
Q K A
BH
(m3/day) Sensitive receivers identified for the Noosa on
(m/day)
Weyba development include the vegetation
GW1 0.005 1.98 x 10-7 0.29 1
communities identified on the DERM RE mapping
GW2 0.042 1.27 x 10-5 0.04 1 and surface waters in the vicinity of the site
GW4 0.011 1.25 x 10-6 0.10 1 including Lake Weyba and associated tributaries.
GW5 0.025 3.32 x 10-6 0.09 1 Based on the groundwater drawdown estimates
BH20 0.052 3.92 x 10-6 0.05 1 detailed in Section 4.7.3 the lateral extent of
groundwater drawdown is calculated to range
BH58 0.935 1.39 x 10-3 0.005 1
from approximately 20m up to 1,281 m. The larger
drawdown extents are predicted to occur in areas
Assuming a maximum excavation depth of 3m, of the site where Tenosols (sandy soils) have
groundwater seepage within excavations is likely been identified. The occurrence of Tenosols within
to be in the order of 0.005m3/day up to 0.935m3/ the development area is shown on Drawing No.
day for each square metre of excavation face. 10838.3.3.
Management of groundwater seepage should be
undertaken in accordance with the attached Whilst Hooghoudt’s equation predicts a lateral
Groundwater Management Plan. extent of drawdown up to 1,281 m in these soil
types, in reality, the true extent of drawdown will
4.7.5 Earthworks phase groundwater quality be limited to the extent of this soil type.
impacts
Earthworks at the site including regrading are Groundwater drawdown can have impacts on
likely to be minimal, however some excavations ecological communities that are sensitive to
will be necessary to facilitate the installation of modification of the groundwater regime.
services and stormwater treatment devices. It is Groundwater drawdown associated with the
earthworks phase of the development is unlikely
likely that groundwater will be encountered during
these excavations however the duration of to be prolonged with excavations such as services
disturbance is likely to be minimal. For example, trenches excavated and backfilled on a
services trenches are typically excavated and progressive basis.
backfilled progressively.
The vegetation at the site identified through the
An acid sulfate soil investigation was undertaken DERM RE mapping includes various species of
Melaleuca and Eucalypts, which are unlikely to be
by Cardno Pty Ltd with results reported in the
Cardno Geotechnical Investigation report of June sensitive to short-term impacts on the
2012. Results of the investigation indicated that groundwater regime.
some acid sulfate soil materials may be present at
As noted earlier, the drawdown extents estimated
the site and are likely to be disturbed during
above are based on a scenario where no
excavation works.
mitigation measures are in place. Implementation
Disturbance of acid sulfate soil has the potential to of mitigation measures such as those described in
the attached Groundwater Management Plan
impact upon groundwater quality if appropriate
management techniques are not implemented. (Appendix 5) will substantially reduce the level of
groundwater drawdown likely to be experienced at
To preventlminimise groundwater quality impacts the site and reduce the potential for impacts on
during the earthworks phase of the development, the identified ecological communities.
works should be undertaken in accordance with a
site specific Acid Sulfate Soils Management Plan Acid sulfate soils are likely to be present at the
and the Groundwater Management Plan attached site and can impact upon groundwater quality and
in Appendix 5. the quality of associated surface waters if
26 AGRICULTURE WATER ENVIRONMENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.