Council archive · source document
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208
Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
www.ac ss.gs +GILEEHI
SUT1-ERJ.AN)
appropriate management techniques are not The shaded areas identified on Drawing No.
employed. To prevent/minimise groundwater 10838.3.5 represent areas of the site where
quality impacts during the earthworks phase of the groundwater level will decrease by approximately
development, works should be undertaken in 0.1 m to 0.22m as a result of the development. As
accordance with a site specific Acid Sulfate Soils shown in this drawing the area of impact is largely
Management Plan. limited to the area of the development footprint,
with no offsite impacts predicted by the
Provided all works are undertaken in accordance
groundwater model.
with the requirements of a site specific ASSMP
and Groundwater Management Plan the impacts Groundwater flow direction during the operational
on nearby sensitive receivers can be prevented phase remains largely consistent with the pre-
and/or minimised. development condition flowing toward low-lying
areas and drainage features. Groundwater on the
4.7.7 Operational phase groundwater level eastern perimeter of the site continues to drain
and flow direction changes toward Lake Weyba.
The pre-development condition of groundwater
flow direction and height was compared with the 4.7.8 Operational phase drawdown
post development outcome conditions. As all excavation works will be complete and the
stormwater treatment devices installed and
The post development model assumed the
operational, no ongoing groundwater drawdown is
following impervious fractions for the various anticipated during the operational phase of the
types of development within each precinct; development.
Residential lots = 0.6
4.7.9 Operational phase seepage
Retirement living and townhouses = 0.7
As all excavation works will be complete and the
Apartment living/mixed use = 0.9
stormwater treatment devices installed and
operational, no ongoing groundwater seepage is
Parks, green-space, buffer zones and the
anticipated during the operational phase of the
undeveloped balance of the large rural residential
development.
lots remained unchanged from the pre-
development condition. 4.7.10 Operational phase groundwater quality
The introduction of impermeable surfaces to the impacts
Activities and/or land uses likely to impact on
site will result in a reduction in groundwater
groundwater quality such as onsite effluent
recharge and a corresponding increase in runoff.
disposal or industrial activities are not proposed
The additional runoff from the developed areas for the Noosa on Weyba development. Provided
would be collected within the stormwater that acid sulfate soil disturbance has been
treatment devices and report as diffuse discharge appropriately managed throughout the
into the natural drainage features of the site. In earthworks/construction phase of the
order to demonstrate the worst case scenario, the development, operational phase impacts to
benefit of increased recharge within the drainage groundwater quality are not anticipated.
lines that would result from the outflows of the
4.7.11 Operational phase impacts on nearby
stormwater treatment devices has not been
included in the groundwater model. sensitive receivers
Given that groundwater flow direction will remain
The predicted post-development groundwater largely unchanged and that any impacts on
conditions are shown on Drawing NO.1 0838.3.4 groundwater level are restricted to within the
and the elevation difference between the pre and development footprint, impacts on sensitive
post development scenarios is shown on Drawing receivers such as vegetation and nearby surface
No. 10838.3.5. water bodies are likely to be negligible.
1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL _
GROUNDWATER ASSESSMENT 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.