Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208

of 103

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

www.ac   ss.gs                                                                          +GILBERI
                                                                                     SlJT1-ERlAN)




SUMMARY


Northbrook Corporation Pty Ltd commissioned Gilbert & Sutherland

Pty Ltd (G&S)to prepare a conceptual Groundwater Assessment
and Management Plan for the proposed Noosa on Weyba

development, Noosaville, Queensland.

A total of 15 groundwater bores were constructed across the

Hofmann Land by Golder Associates in 2007, however some of
these have since been damaged or destroyed. Our initial site

inspection located 13 existing bores suitable for groundwater
monitoring. No existing groundwater bores were located on the
Northbrook land. To augment the existing monitoring bore network
on the Hofmann land and establish a monitoring network on the

Northbrook land, G&S installed a total of six (6)additional

groundwater bores.

Six (6)rounds of groundwater monitoring were conducted at the site
from March to June 2012 and the collected data used to prepare a

conceptual groundwater model using the USGS groundwater
modelling package MODFLOW. The model was used to
conceptualise the existing groundwater environment and predict the
likely impacts of the proposed development.

Groundwater impacts predicted during the construction phase are
limited to the impacts of groundwater drawdown during trenching/
excavation works. The results of this assessment indicate that
where groundwater drawdown occurs, the lateral extent will vary
between 20m and 1,281 m. The larger drawdown extents are

predicted to occur in areas of the site where Tenosols (sandy soils)
have been identified. Whilst Hooghoudt’s equation predicts the
lateral extent of drawdown to extend up to 1,281 m in these soil

types, in reality, the true extent of drawdown will be limited to the
extent of this soil type.


Instances of groundwater drawdown are unlikely to be prolonged
with excavations such as services trenches excavated and
backfilled on a progressive basis. The extent of groundwater
drawdown calculated in this report is based on a scenario where no

mitigation measures are in place. Implementation of mitigation
measures such as those described      in the attached Groundwater




1 0838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PTY LTD   _
                                                                              GROUNDWATER ASSESSMENT   3

Used in these records

About this file

File size
60.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12_0208.pdf · 60.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.