Council archive · source document
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208
Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
www.ac ss.gs
+GILBERI
SU1’l
Management Plan, will substantially reduce the level of groundwater
drawdown likely to be experienced at the site.
Disturbance of acid sulfate soil through excavation and/or
groundwater drawdown has the potential to impact upon groundwater
quality if appropriate management techniques are not implemented.
To preventlminimise groundwater quality impacts during the
earthworks phase of the development, works should be undertaken in
accordance with a site specific Acid Sulfate Soils Management Plan.
Operational phase groundwater impacts are limited to a localised
decrease in groundwater level beneath the development footprint as
a result of reducedgroundwater recharge. No offsite impacts are
predicted by the groundwater model. It is important to note that the
benefits of groundwater recharge from the outflows of the
stormwater treatment devices have not been included in the
groundwater model. The results presented in this report therefore
represent the predicted maximum decrease in groundwater level as
a result of the development.
Activities and/or land uses likely to impact on groundwater quality
(such as onsite effluent disposal or industrial activities) are not
proposed for the Noosa on Weyba development. Operational phase
impacts to groundwater quality are not anticipated.
The effect of groundwater drawdown has the potential to impact on
sensitive receivers such as the identified ecological communities
located throughout and adjacent to the development site. For the
Noosa on Weyba development, groundwater drawdown is limited to
the earthworks phase of the development and is unlikely to occur for
prolonged periods of time. At this stage of the development
proposal, the exact location of services trenches is unknown.
Should these be proposed for areas adjacent to sensitive receiving
environments, mitigation measures such as those proposed in the
attached Groundwater Management Plan should be implemented.
Groundwater impacts that are likely to result from the proposed
Noosa on Weyba Development are anticipated to be minimal and
are not predicted to extend beyond the boundaries of the
development. Where impacts are predicted to occur, the
techniques, measures and strategies described in the attached
groundwater management plan should be implemented to prevent
and/or minimise any impacts to groundwater and sensitive receivers
at the site.
4 AGRICULTURE WATER ENVIRONMENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.