Council archive · source document
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208
Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
www.access.gs
+GILtERI
SlJT1-ERlAN)
CONTENTS
1 Introduction........................................................................9
1.1 Background.......................................................................9
1 .2 Proposed development.................. ..........................
.........9
1 .3 Scope of works............................... ..........................
.........9
1 .4 Aims and objectives....................... .................................
10
1.5 Standards and guidelines................................................10
2 Site description ...............................................................
.11
2.1 Property description ........................................................11
2.2 Geology...........................................................................11
2.3 Topography.....................................................................12
2.4 Drainage..........................................................................12
2.5 Vegetation.......................................................................12
2.6 Current land use............................. .................................
13
2.7 Surrounding land use ......................................................13
3 Method ............................................................................14
3.1 Desktop assessment............... .............................
...........14
3.2 Groundwater monitoring bore network ............................
14
3.3 Groundwater monitoring.......... ........................................
15
3.4 Site soil permeability .......................................................15
3.5 Groundwater model development ...................................16
3.5.1 Software............................. .................................
16
3.5.2 Model domain.... .................................................
16
3.5.3 Topography.........................................................16
3.5.4 Stratigraphy........................ ..........................
.......16
3.5.5 Boundary conditions ...........................................
17
3.5.6 Recharge and evaporation ....................
..............17
3.5.7 Hydraulic characteristics.. ............................
.......18
3.6 Calibration...... ...........18
......................................................
3.7 Sensitivity........................................................................18
3.8 Model limitations......................... ..........................
...........18
3.9 Construction phase groundwater impacts.. .....................
19
10838_GWA_ELH2F.DOCX I NOOSA ON WEYBA I NORTHBROOK CORPORATION PIL -
GROUNDWATER ASSESSMENT 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.