Skip to the record
Every meeting, every word.

Council archive · source document

Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208

of 103

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

www.ac      ss.gs
                                                                                             +GIL.1
                                                                                          SUT1-ERI.Af



#.# Title



 Person responsible   This is the person who has accepted the responsibility of implementing the ASSMP

                      provisions detailed on this page.


                      The issue with which the table deals.




                      The operational policy or management objective that applies to the element.




                      Management outcomes or performance criteria for each element of the operation.




                      The strategies or tasks (to nominated operational design standards) that will be

                      implemented to achieve the performance criteria.


                      The monitoring requirements, which will measure actual performance (i.e. specified
                      limits to pre-selected indicators of change).



                      The auditing requirements, which will verify implementation of, agreed construction
                      and operation phase environmental management strategies and compliance with

                      agreed performance criteria.


                      Content, timing and responsibility for reporting and auditing of monitoring results.

                      Requirements for record keeping.


                      The circumstances under which the agreed performance criteria are unlikely to be
                      met leading to the potential for environmental harm to result.




                      The action to be implemented in case a performance requirement is not reached
                      and the company(s) responsible for action.




1 0838_GWMP_REH1 F.DOCX / NOOSA ON WEYBA / GWMP                                                              7

Used in these records

About this file

File size
60.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12_0208.pdf · 60.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.