Council archive · source document
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208
Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
www.ac ss.gs
+GIL.1
SUT1-ERI.Af
#.# Title
Person responsible This is the person who has accepted the responsibility of implementing the ASSMP
provisions detailed on this page.
The issue with which the table deals.
The operational policy or management objective that applies to the element.
Management outcomes or performance criteria for each element of the operation.
The strategies or tasks (to nominated operational design standards) that will be
implemented to achieve the performance criteria.
The monitoring requirements, which will measure actual performance (i.e. specified
limits to pre-selected indicators of change).
The auditing requirements, which will verify implementation of, agreed construction
and operation phase environmental management strategies and compliance with
agreed performance criteria.
Content, timing and responsibility for reporting and auditing of monitoring results.
Requirements for record keeping.
The circumstances under which the agreed performance criteria are unlikely to be
met leading to the potential for environmental harm to result.
The action to be implemented in case a performance requirement is not reached
and the company(s) responsible for action.
1 0838_GWMP_REH1 F.DOCX / NOOSA ON WEYBA / GWMP 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.