2 Management of potential impacts
The management plan requires the Proponent to mitigate the potential environmental impacts associated
with the earthworks phase of the Noosa on Weyba development.
Groundwater at the site should be assessed during the earthworks phase and care should be taken when
treating and disposing of any dewatered groundwater associated with the works. Treatment may be required
prior to disposal.
This GWMP provides indicative management strategies and measures for the disturbance of groundwater
associated with the bulk earthworks phase of the Noosa on Weyba development. Due to the preliminary
nature of the development proposal at the time of preparation of the GWMP, the proposed management
measures are also general in nature. It is intended that additional detail would be added to the GWMP
(where required) at the detailed design phase of the development.
The following detachable pages detail the provisions of this management plan for the earthworks phase.
1 0838_GWMP_REH1 F.DOCX / NOOSA ON WEYBA / GWMP 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.