Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208

of 103

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                  www.ac   ss.gs
     +GILEERI
Sl


2.1   Contractor management


 Person Responsible      ProponenUProject Engineer


                         Contractor management.


                         To verify the Proponent’s duty of care is met by ensuring the contractor is
                         aware of his/her   responsibilities under the terms of the GWMP.

                         Each contractor is fully aware of his/her responsibilities under the terms of
                         the GWMP and their obligation to respond to environmental issues arising
                         from construction activities.


                         Monitoring and verifying that the GWMP is adhered to at all times and
                         taking action if the specifications are not followed.

                         The provision of advice, information and training to contractors and staff
                         with regard to the implementation of the GWMP.


                         Weekly site inspections are to be carried out by the site manager or
                         Proponent’s representative to ensure the provisions of the GWMP are
                         being adequately implemented.

                         Auditing will be undertaken by the site manager and/or the proponent’s
                         nominated representative.


                         Alternatively, auditing may be carried out by an independent consultant.
                         The audit should include an inspection of site activities, complaints,
                         corrective actions and reporting to assess compliance with the provisions
                         outlined within the GWMP.


                          Full details shall be available to the contractor together with   suggested
                         corrective actions (if required).


                         Failure to comply with the conditions set out in the GWMP resulting in
                         environmental harm or unnecessary disturbance to neighbouring land
                         users.



                         The Proponent has the right to call a halt to any activity being undertaken
                         which is deemed in conflict with the GWMP.




Commitment 3

All contractors will be managed to ensure compliance with the GWMP for the duration of the site works.




10                                                                       AGRICULTURE WATER ENVIRONMENT

Used in these records

About this file

File size
60.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12_0208.pdf · 60.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.