Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208
Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
www.ac ss.gs
+GILEERI
Sl
2.1 Contractor management
Person Responsible ProponenUProject Engineer
Contractor management.
To verify the Proponent’s duty of care is met by ensuring the contractor is
aware of his/her responsibilities under the terms of the GWMP.
Each contractor is fully aware of his/her responsibilities under the terms of
the GWMP and their obligation to respond to environmental issues arising
from construction activities.
Monitoring and verifying that the GWMP is adhered to at all times and
taking action if the specifications are not followed.
The provision of advice, information and training to contractors and staff
with regard to the implementation of the GWMP.
Weekly site inspections are to be carried out by the site manager or
Proponent’s representative to ensure the provisions of the GWMP are
being adequately implemented.
Auditing will be undertaken by the site manager and/or the proponent’s
nominated representative.
Alternatively, auditing may be carried out by an independent consultant.
The audit should include an inspection of site activities, complaints,
corrective actions and reporting to assess compliance with the provisions
outlined within the GWMP.
Full details shall be available to the contractor together with suggested
corrective actions (if required).
Failure to comply with the conditions set out in the GWMP resulting in
environmental harm or unnecessary disturbance to neighbouring land
users.
The Proponent has the right to call a halt to any activity being undertaken
which is deemed in conflict with the GWMP.
Commitment 3
All contractors will be managed to ensure compliance with the GWMP for the duration of the site works.
10 AGRICULTURE WATER ENVIRONMENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.