2.3 Groundwater monitoring
Person Responsible Proponent/Contractor
Groundwater monitoring
To establish and maintain stable groundwater conditions and verify that
development management is appropriate.
Water quality objectives for the construction phase of works will be derived
from the background monitoring data set. Trigger values will be set
following statistical analysis of the data set and will be incorporated into the
GWMP at the detailed design phase. These proposed objectives would be
submitted to SCRC for review and approval prior to implementation.
No variation in groundwater levels and/or flow direction outside the site
boundary or in the environmental protection zones beyond the effects of
drought or flood.
Monitoring of groundwater (levels and quality) should be undertaken
monthly within the established boreholes during the earthworks phase to
identify any deleterious effects that site activities may have on groundwater
levels and/or quality.
Carry out monthly groundwater level and quality monitoring at the
established monitoring locations.
Auditing will be undertaken by the site manager and/or the proponent’s
nominated representative.
Alternatively, auditing may be carried out by an independent consultant.
The audit should include an inspection of site activities, complaints,
corrective actions and reporting to assess compliance with the GWMP.
Quarterly reports are to be submitted to SCRC.
Reports to include raw data, a results summary and a discussion
comparing results with the sites trigger values.
Result sheets to be compiled for monitoring results. All results to be
available for inspection by local and state government officers at any
reasonable time.
Sustained decline of groundwater quality at the monitoring points outside
the range specified in the site’s release criteria (to be set following
statistical analysis of the background monitoring data set and prior to the
commencement of earthworks).
Variations in groundwater levels beyond typical seasonal fluctuations.
1 0838_GWMP_REH1 F.DOCX / NOOSA ON WEYBA / GWMP 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.