Council archive · source document
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208
Very large file (60.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
www.ac ss.gs
+GILEERI
Sl
Groundwater encountered during excavation works within ASS areas or
within the vicinity of sensitive receptors shall be pumped to recharge
trenches.
pH shall be monitored weekly to ensure waters comply with the site’s
release criteria.
If dewatered groundwater is to be released off-site, it must be contained
within a temporary sediment pond and comply with the site’s release
criteria prior to release.
Trigger values will be set prior to the commencement of construction
works. These values will be derived from statistical analysis of the
background monitoring data set and will represent the site’s release
criteria. These proposed objectives would be submitted to SeRe for review
and approval prior to implementation.
Auditing will be undertaken by the site manager and/or the proponent’s
nominated representative.
Alternatively, auditing may be carried out by an independent consultant.
The audit should include an inspection of site activities, complaints,
corrective actions and reporting to assess compliance with the GWMP.
Water quality monitoring results to be submitted to SeRe as
requested.
All results to be kept on site for inspection by local and state
government officers at all times.
Discharge of waters to the recharge trenches without testing for pH to
ensure the specified range is met.
Discharge of dewatered groundwater off-site without appropriate
testing to ensure the site’s water quality criteria are met.
Deterioration in surface water quality downstream of the development
resulting from discharge of waters from the development site.
Variation in groundwater levels and/or flow direction outside the site
boundary or in the environmental protection zones beyond the effects
of drought or flood.
Take necessary steps to address the problem to prevent a recurrence
in consultation with the environmental consultant.
Addition of hydrated lime and/or liquid lime to contained waters as
required to maintain the pH within the recommended range.
Addition of gypsum to contained waters as required to reduce the
concentration of suspended solids.
Commitment 4
Management will ensure that on-site activities do not impact upon groundwater quality, levels or movement
outside of conditions experienced during drought or flood.
12 AGRICULTURE WATER ENVIRONMENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 17 of 37 Appendix 15 - Groundwater Assessment MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 60.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.