Town Planning Assessment Report (3) · MCU26/0012
avoided or minimised. least 300 millimetres above the
Defined flood event (DFE).
OR
AO16.2 Where the DFE has not
been modelled for the area, the Not applicable.
finished floor level of habitable
rooms is at least 500 millimetres
above the highest recorded flood.
Editor's Note—The QDC mandatory
provisions MP3.5 also apply to the
construction of buildings in flood hazard
areas.
Major Electricity Infrastructure AO18.1 Development including any Not applicable.
& Substations sensitive land uses is at least:
PO18 Development is sufficiently (a) 50 metres from a
separated from major electricity transmission substation;
infrastructure and substations to (b) 10 metres from any other
minimise the likelihood of nuisance substation; and
or complaint.
(c) 30 metres from a
transmission line easement.
AO18.2 Habitable buildings are not
located within an easement for a
distribution line.
PO20 Wherever practicable AO20 Where adjoining substations Not applicable.
habitable buildings are orientated to or major electricity infrastructure,
avoid direct overlooking of major habitable buildings are orientated
electricity infrastructure or so that the majority of outdoor
substations. living areas and windows of
habitable rooms face away from the
infrastructure.
Earthworks and Drainage AO21 Filling other than Can comply with PO21 - Refer
PO21 Earthworks and drainage accessways: to Earthworks Plans.
operational works do not directly, (a) does not extend more than
indirectly or cumulatively cause the equivalent of 1.5
adverse impacts external to the metres within the urban
development site by: area boundary and 3m for
(a) causing ponding of water rural areas, measured from
on the site or nearby land; the outer walls of the main
building;
(b) increasing flooding, which
adversely affects the safety (b) is limited to a maximum of
or use of any land 500m2; and
upstream and downstream; (c) does not impact on the
(c) adversely affecting the flow local drainage of adjoining
of water in any overland properties.
flow path; and
27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Assessment Report (3).pdfRelated documentApplication case desk ↗
Town Planning Assessment Report (3).pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.