Proposed Bunnings trade centre, Gateway Drive, Noosaville
Response to further issues email of 17 April 2023 (stormwater)

                  Council request                                                                Applicant’s response
Issue                                                  A preliminary section of the basin has now been provided within the SWMP as part of the preliminary
The proposed bioretention/detention basin is deep      stormwater layout sketch. This shows that the maintenance access will be via a ladder located outside the
compared to the surrounding pavement levels and it bioretention area. However, due to the limited space batters cannot be achieved and the basin will require
has not been demonstrated how adequate                 walls. Accordingly, safety fencing will be provided around the basin.
maintenance access and landscape integration will
be achieved.                                           It is should be acknowledged that fencing would be provided around the basin in any case, to ensure
Outstanding Information Request                        customers do enter the basin. This is consistent with the existing basin (that serves the existing retail
Provide additional preliminary design plans, including warehouse). This existing basing also has fencing, as shown below.
design sections, which demonstrate how
maintenance access, safety (without the need for
fencing) and landscape amenity integration will be
achieved for the bio-detention system based on the
depth proposed for the device




                                                      The landscape concept design allows for a substantial landscaped zone between the street frontage and the
                                                      bio-detention basin. This will contain three tiered planting. The basin will also be landscaped in accordance
                                                      with Council guidelines. In combination this will ensure the attractive appearance of the building setback
                                                      zone (including the basin) from the street.


further issues email response table v2.0 stormwater.docx                                                                                                        Page 1
Log in to download the original file

Attachment C further issues response table 2 stormwater.pdf · 470 KB (small file)

Full text of the other 2 pages

Page 2

                                                        An extract from the landscape concept design is included below.




Issue
Stormwater management details and detention basin
sizing
Outstanding Information Request
Provide an updated SWMP and architectural/design
plans which address the following:
• Off-set the northern retaining wall from the         The retaining wall will be offset to allow for a swale to be installed and direct the flows to the stormwater pits
     property boundary a sufficient distance such that proposed to diver the external flows through the site. Final sizing of the swale and pits to be confirmed during
     the 1%AEP (2100) flows from the external          detailed design.
     catchment can be collected within the
     development site without causing ponding on the This is shown on the catchment plan at Appendix D of the SWMP. (see extract below)
     upslope property




                                                                                                                                                                     Page 2

Page 3

                                                         As this is clearly shown in the SWMP it is not necessary to update architectural plans which are conceptual
                                                         only. This will be incorporated into the design at detail design phase.

•   Updated the figure in Appendix C of the SWMP         Appendix C has been amended to correctly reflect the bio basin parameters outlined within the report.
    to refer to the correct (updated) filter area and
    correctly label the different elements of the bio-
    detention basin profile/section
•   Explain the reduction in detention volume from
    the original submission and provide further
    details in relation to the detention modelling:
    o    Clarify what initial and continuing loss  ILSAX has been utilized in drains and the hydrological model parameters have now been added to the report
         values have been adopted for pervious and in section 5.1 Table 1
         impervious surfaces in the models,
         consistent with ARR2019 recommendations
         and DataHUB
    o    Provide a comparison of existing and            Rational method peak flow comparison has now been included within the report in section 5.3 Table 3.
         developed (unmitigated) flows estimated
         from the Rational Method and DRAINS in
         order to confirm acceptable results are
         achieved
    o    It appears that rational method results for     Results have been amended to correctly show the drains results.
         the existing site have been compared to
         DRAINS results for the developed site. The
         same hydrologic method should be used
         when comparing results/impacts


                                                                                                                                                                  Page 3

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.