Attachment C further issues response table 2 stormwater
An extract from the landscape concept design is included below.
Issue
Stormwater management details and detention basin
sizing
Outstanding Information Request
Provide an updated SWMP and architectural/design
plans which address the following:
• Off-set the northern retaining wall from the The retaining wall will be offset to allow for a swale to be installed and direct the flows to the stormwater pits
property boundary a sufficient distance such that proposed to diver the external flows through the site. Final sizing of the swale and pits to be confirmed during
the 1%AEP (2100) flows from the external detailed design.
catchment can be collected within the
development site without causing ponding on the This is shown on the catchment plan at Appendix D of the SWMP. (see extract below)
upslope property
Page 2