Attachment C further issues response table 2 stormwater
As this is clearly shown in the SWMP it is not necessary to update architectural plans which are conceptual
only. This will be incorporated into the design at detail design phase.
• Updated the figure in Appendix C of the SWMP Appendix C has been amended to correctly reflect the bio basin parameters outlined within the report.
to refer to the correct (updated) filter area and
correctly label the different elements of the bio-
detention basin profile/section
• Explain the reduction in detention volume from
the original submission and provide further
details in relation to the detention modelling:
o Clarify what initial and continuing loss ILSAX has been utilized in drains and the hydrological model parameters have now been added to the report
values have been adopted for pervious and in section 5.1 Table 1
impervious surfaces in the models,
consistent with ARR2019 recommendations
and DataHUB
o Provide a comparison of existing and Rational method peak flow comparison has now been included within the report in section 5.3 Table 3.
developed (unmitigated) flows estimated
from the Rational Method and DRAINS in
order to confirm acceptable results are
achieved
o It appears that rational method results for Results have been amended to correctly show the drains results.
the existing site have been compared to
DRAINS results for the developed site. The
same hydrologic method should be used
when comparing results/impacts