NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 12
Roof Water & Stormwater Drainage
37. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
storage 3000 litres per attached dwelling/unit) that is installed to ensure water from the tank is used for
external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up
swimming pools, outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All
rainwater tanks are to be designed and installed in accordance with the Queensland Development Code
(QDC), Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
building approval. The location and capacity of the tanks shall be clearly shown on the plans submitted
for Building Works / Operational Works approval and any overflow shall be directed to the stormwater
drainage system.
38. All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater
drainage permitted to drain from the site shall be discharged to Council’s kerb & channel street drainage
system in Duke Street. Plans of the drainage design shall be prepared by a Registered Professional Civil
Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
system at any one location is 25 litres/second.
39. A grated drain shall be provided across the access driveway within the site adjacent to the street
boundary to collect runoff from the manoeuvring area and the access driveway.
40. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
41. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
42. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
43. Each individual water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
44. All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
fences or locked gates. In this regard approval of the water meter configuration and location must be
obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
hydraulic drawings.
45. For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development shall be
served by:
A single Body Corporate water meter to measure the total water consumption (including fire hose reels,
but excluding fire hydrants and fire sprinkler systems), and
Individual water meters to each tenement capable of being separately rated, and
A fire service (fully testable single detector check with metered bypass), where applicable, for flows to fire
hydrants and fire sprinkler systems (excluding fire hose reels).
Earthworks
46. Earthworks required on site shall be carried out in accordance with Section 3.8 of Council’s Engineering
Design Standards Manual and so as not to cause the additional ponding of water on any adjoining lands
or the blockage of, or interference with, any natural watercourses.
47. Excavation of the site and the construction of the proposed works shall not have any adverse affects on
the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a
Registered Professional Engineer Queensland shall supervise the excavation of the site and the
construction of the new works to determine whether any additional measures are required to protect the
stability of adjoining buildings and/or structures and/or services and/or lands.
48. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences that
border the development site. Fences that are affected shall be replaced prior to the Building Certifier
issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on
the plans submitted for Operational Works approval.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00001045.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.