49.    Earthworks required on site shall be undertaken without the use of vibratory equipment and in a manner
       that does not compromise the stability of the site or adversely impact on the adjoining buildings and/or
       structures and/or lands.

50.    An existing Conditions Survey shall be carried out on adjoining structures and buildings prior to any
       construction works taking place on site. If distress already exists, a photographic survey shall be
       undertaken, the distress measured and a plan to monitor changes to distress shall be implemented. A
       copy of this report is to be submitted to Council prior to the issue of operational works approval.

51.    Certification of the completed works must be provided to Council by the supervising engineer. The
       certification shall state that the completed works conform with all aspects of the design and that the
       completed works will not have any adverse affects on the stability of adjoining buildings and/or structures
       and/or services and/or lands.
Site Stability
52.    A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
       soil classification, establish whether any measures are required to protect the stability of adjoining
       buildings and/or structures and/or land, and make recommendations on the type of foundation system(s)
       best suited for the proposed development. The recommendations of this report shall be incorporated into
       the design and construction of the proposed development.

53.    Should the recommendations of the geotechnical report require any part of the works (including
       excavation, retaining structures, tie backs etc) to be temporarily or permanently constructed within any
       adjoining property a letter of authority from the adjoining property owner shall be submitted to Council
       prior to the issue of operational works approval.
Erosion and Sediment Control
54.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
       control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
       waste, will be necessary.
       In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
       to the Council for approval prior to obtaining a Development Permit for Operational Works.

Contributions Towards Council Infrastructure
55.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
       various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
       amounts under the current Council policies and requirements is outlined in the table below:

         Contribution Required For:                                                          Amount:

         PSP12 – Public Open Space Contributions (Park)                                      $2,974
         PSP16 – Sewerage Headworks Contributions                                            $3,303
         PSP17 – Water Supply Headworks Contributions                                        $4,659
         PSP20 – Pathway Trunk Network Contributions                                         $669
         TOTAL Contribution Amount =                                                         $ 11,605
         Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
         from June 2007 until the date of payment.
       All contributions must be paid prior to the issue of a Development Permit for Operational Works.

       Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the contributions
       not be paid at the due time, Council shall call upon the trading bank guarantee in full.

       Processing of bonds for security where specific Council approval has been given for the bonding of
       contributions will incur an administration fee in accordance with Council’s Land Development Commercial
       & Regulatory Fees at the time of lodgement.

       In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
       the trading bank guarantee will be returned.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@400759ba\@[email protected]

Used in these records

About this file

File size
57 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001045.001 [As Published].pdf · 57 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.