NOOSA COUNCIL IDAS Development Application Decision Notice 16
◊ dissolved oxygen,
◊ trash and gross pollutants,
◊ algal count and identification, and
◊ faecal coliforms.
86. The Developer shall continue this water quality monitoring for a period of 3 years from completion
of the final stage of construction.
87. In addition, the Developer shall undertake inspections for erosion and deposition, the build-up of
trash and gross pollutants, and other water pollution. These inspections will be carried out every
third month as well as after significant rainfall events, for a period of 3 years from completion of the
final stage of construction.
88. An operational phase Water Quality Management Plan shall be prepared to the reasonable
satisfaction of Council and address water quality performance targets, water treatment devices,
water quality maintenance, requirements for stormwater management measures and devices,
contingency measures for aquatic plant growth, loss of vegetation in swales and filter strips,
pollution response and algal blooms. It shall also include a mosquito management strategy. The
plan shall demonstrate compliance with the prescribed water quality objectives.
88.1 Responsibilities shall be clearly delineated.
88.2 Non-compliance with prescribed water quality standards will trigger the implementation of
measures to rectify the problem(s).
88.3 Reports on monitoring, incidents, corrective action and plan updates shall be submitted to
Council every three (3) months with Council being notified if any incident is recorded. These
reports shall include information collected during the monthly monitoring program, shall
highlight any non-standard results, and be submitted in a form acceptable to Council. The
format and content of these reports shall be in hard copy and digital form, generally in
accordance with the following:
◊ including tables of the monitoring results (digital form should be in Excel);
◊ include individual charts plotting the results for all parameters required in the monitoring
(digital form should be in Excel);
◊ include a brief written discussion of the results and recommend any necessary actions.
Water Quality Devices
89. Water quality control devices shall be installed generally in accordance with the Stormwater and
Water Quality Management Plan. Detailed staging plans and specifications, based on and
generally in accordance with the Plan shall be prepared and submitted (after consultation with
officers of the Council) with the relevant applications for operational works.
Drainage Works
90. The Developer shall complete the drainage works progressively in conjunction with development of
the site and generally in accordance with the approved Stormwater and Water Quality Management
Plan. Detailed drainage plans and specifications, based on and generally in accordance with the
approved Drainage Plan, the EMP and these Conditions, shall be prepared and submitted (after
consultation with officers of the Council) with the relevant applications for operational works.
91. All drainage works as required by the Drainage Plan shall be provided by the Developer at its own
cost.
H o:\database\onestop\decision.doc
Print Date: 26 February 2020, 3:13 PM