               NOOSA COUNCIL IDAS Development Application Decision Notice                                                            19


                         116.      A Master Plan of the planned water supply works shall be prepared by the applicant and
                                   submitted to Council with the application for a Development Permit for Operational Works – Water
                                   & Sewerage.

                         117.      The applicant shall liaise with Council’s Water & Sewerage Section in order to prepare water supply
                                   plans and associated documentation.

                         118.      An underground electricity service shall be provided to each lot.
                                   In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
                                   Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
                                   The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval
                                   submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed
                                   Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council
                                   endorsing the Plan of Survey.
                                   Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be
                                   wholly at the applicant’s expense and shall not entail a financial encumbrance on future purchasers
                                   of the proposed lots.
                                   Street lighting and pathway lighting throughout the subdivision shall have a high energy efficient
                                   rating to the reasonable satisfaction of Council.

                         Sewerage Reticulation

                         119.      Each allotment shall be connected to Council’s sewerage reticulation systems and be constructed
                                   in accordance with Council’s standards and requirements at no cost to Council. Connections to
                                   sewer system shall be carried out either by Council or by a Council approved Contractor and at no
                                   cost to Council.

                         120.      Designs for a sewerage system to connect all new lots within the site to Council's existing
                                   sewerage reticulation system shall be to the standards and requirements set out in Council’s
                                   Engineering Design Standards. If the design requires the construction of a pump station and a
                                   rising main, the connection point to Council's existing system will be nominated by the Manager -
                                   Land Development.

                         Headworks

                         121.      Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and
                                   PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions
                                   respectively and at the rates applicable at the time of payment. An estimate only of the contribution
                                   rates as of June 2003 under the current policies is as follows:
                                   Water Supply         $129,918
                                   Sewerage             $ 63,821
                                   TOTAL                $193,739
                                   All headworks contributions must be paid prior to Council endorsing the Plan of Survey. Each
                                   additional residential allotment shall be assessed as a dwelling house.

                         Electricity & Telecommunication

                         122.      An underground electricity service shall be provided to each lot.
                                   In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
                                   Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
                                   The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval
                                   submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed
                                   Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council
                                   endorsing the Plan of Survey.
                                   Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be
                                   wholly at the applicant’s expense and shall not entail a financial encumbrance on future purchasers
                                   of the proposed lots.




               H o:\database\onestop\decision.doc


                                                                                                                    Print Date: 26 February 2020, 3:13 PM
Log in to download the original file

Approval Package.pdf · 280 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.