NOOSA COUNCIL IDAS Development Application Decision Notice 19
116. A Master Plan of the planned water supply works shall be prepared by the applicant and
submitted to Council with the application for a Development Permit for Operational Works – Water
& Sewerage.
117. The applicant shall liaise with Council’s Water & Sewerage Section in order to prepare water supply
plans and associated documentation.
118. An underground electricity service shall be provided to each lot.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval
submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed
Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council
endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be
wholly at the applicant’s expense and shall not entail a financial encumbrance on future purchasers
of the proposed lots.
Street lighting and pathway lighting throughout the subdivision shall have a high energy efficient
rating to the reasonable satisfaction of Council.
Sewerage Reticulation
119. Each allotment shall be connected to Council’s sewerage reticulation systems and be constructed
in accordance with Council’s standards and requirements at no cost to Council. Connections to
sewer system shall be carried out either by Council or by a Council approved Contractor and at no
cost to Council.
120. Designs for a sewerage system to connect all new lots within the site to Council's existing
sewerage reticulation system shall be to the standards and requirements set out in Council’s
Engineering Design Standards. If the design requires the construction of a pump station and a
rising main, the connection point to Council's existing system will be nominated by the Manager -
Land Development.
Headworks
121. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and
PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions
respectively and at the rates applicable at the time of payment. An estimate only of the contribution
rates as of June 2003 under the current policies is as follows:
Water Supply $129,918
Sewerage $ 63,821
TOTAL $193,739
All headworks contributions must be paid prior to Council endorsing the Plan of Survey. Each
additional residential allotment shall be assessed as a dwelling house.
Electricity & Telecommunication
122. An underground electricity service shall be provided to each lot.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with
Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
The detailed deigns shall then be submitted to ENERGEX for approval and a copy of their approval
submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed
Subdivisions” (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council
endorsing the Plan of Survey.
Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be
wholly at the applicant’s expense and shall not entail a financial encumbrance on future purchasers
of the proposed lots.
H o:\database\onestop\decision.doc
Print Date: 26 February 2020, 3:13 PM