Street lighting and pathway lighting throughout the subdivision shall be provided in accordance
with Council’s Engineering Design Standards, section 11.3.3 and to the satisfaction of Council.
123. The requirements for TELECOMMUNICATION services shall be satisfied in relation to any existing
services that currently traverse the site and for the provision of new telephone services to the
proposed lots. In this regard written confirmation from an approved telecommunication agency
shall be submitted to the Council prior to Council endorsing the Plan of Survey.
Services Generally
124. Detailed design drawings and calculations shall be submitted with an application for a Development
Permit for Operation Works in respect of water, sewer and stormwater works. To avoid conflict with
other underground pipes or services, all existing and proposed services required by the
development shall be shown on the plans.
125. Conduits and kerb markers shall be installed for all necessary service crossings of roads to
Council's satisfaction. An "As Constructed" plan showing the locations of the conduits shall be
submitted to Council prior to acceptance of the works "On Maintenance".
126. Deleted.
127. Deleted.
128. Any alteration of a public utility or other facility necessitated by the development of the land or
associated construction works either internal or external to the site shall be at no cost to Council.
Service Easements
129. Registered easements shall be provided on the Plan of Survey over all Council services within
private property, such as water mains, sewerage reticulation pipes and stormwater drainage pipes.
130. Water main easements shall generally be parallel to and centred over the water main and be
equivalent in width to twice the depth to invert level of the main at the deepest point within the
allotment (measured from the finished surface) and be no less than 3.0 metres wide.
131. Sewer easements shall generally be parallel to and centred over the sewer main and be equivalent
in width to twice the depth to invert level of the main at the deepest point within the allotment
(measured from the finished surface) and be no less than 3.0 metres wide.
132. An easement over a stormwater drainage pipe shall be sufficient in width to provide a minimum of
1.5 metres either side of the designed drainage structure and shall have a minimum overall width of
4.0 metres.
133. Prior to Council endorsement of the Plan of Survey, a duly executed copy of any required Grant of
Easement shall be submitted to Council for perusal.
Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of
Survey.
Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to the
endorsing of the Plan of Survey.
134. Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's Solicitor
an appropriate undertaking in writing that in conjunction with lodgement of the Plan of Survey at the
Land Titles Office, the Title Deed and the easement documents will also be lodged and any
additional Titles Office forms or requisitions requiring the consent of Council being attended to
forthwith.
Pedestrian Paths / Bike Paths
135. A 2.0 metre wide meandering concrete path shall be constructed along the eastern side of Banksia
Avenue. This path shall commence from Grant Street and continue to the south along the eastern
side of Banksia Avenue, past Jan Street and down to the existing path that currently runs between
the southern end of Banksia Avenue and Noosa Drive.
H o:\database\onestop\decision.doc
Print Date: 26 February 2020, 3:13 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.