NOOSA COUNCIL IDAS Development Application Decision Notice 21
136. A 1.5 metre wide meandering path shall be constructed along the southern and eastern sides of
the new extension to Banksia Avenue (referred to as Grosvenor Terrace) and shall extend to the
narrow strip of road reserve proposed between Lots 23 & 24.
137. In choosing the alignment of these paths care shall be taken to protect any significant vegetation or
any underground services.
138. Pram ramps shall be installed at intersections (and wherever else required) in accordance with
Council’s Standard Drawing 9006.
139. All paths and pram ramps shall be designed and constructed to ensure pedestrian safety using
non-slip materials and to produce an evenly graded surface finish.
140. A Development Permit for Operational Works shall be obtained prior to the commencement of any
works.
141. Where footpaths are located in cut or where site conditions indicate the presence of groundwater in
proximity of the natural ground level, subsoil drains shall be constructed between the back of path
and the property boundary.
142. Prior to works being taken “On Maintenance”, the remainder of the footpath areas shall be topsoiled
and established with couch free of weeds, where consistent with the Landscape Master Plan.
143. The Applicant is advised, that to avoid damage being caused to these paths during the construction
phase Council may consider accepting an Uncompleted Works Bond equal to 150% of the cost of
providing the paths likely in the opinion of Council to be subject to damage from the further
development of the site, in order to enable the Plan of Survey to be endorsed by the Council.
144. Deleted.
Contributions to External Major Pathways
145. A pathway contribution of $7,514.56 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to
obtaining a Development Permit for Operational Works. This amount will be subject to variations in
the Price Index, All Groups Brisbane from June 2003 until the date of payment.
Earthworks
146. Prior to excavating any material to be used for fill on this site or areas adjoining the site, a
Development Permit for Operational Works shall have been obtained for the site or areas adjoining
the site from which the excavated material is taken. A soil report shall be submitted with the
application certifying that the material is free of acid sulphate soils and other deleterious materials.
147. Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A.
A registered practicing Geotechnical Engineer shall supervise the placement of all fill and shall
certify that all lots/roads have been compacted to the required standard. To this extent Level 1
supervision in accordance with AS3798-1996 is recommended.
Any existing fill on the site or areas adjoining the site that does not comply with Council’s
requirements shall be removed at the direction of the Manager - Land Development prior to
additional filling works commencing.
148. The transportation of all materials to and from the site or areas adjoining the site shall be
undertaken in a manner such that no particulate matter escapes onto a public road. All vehicles
carrying materials either to or from the site shall be covered to prevent materials including dust
being windblown from the vehicle.
149. Following completion of the filling works and prior to endorsement of the Plan of Survey, the
registered practicing Geotechnical Engineer supervising the works shall submit compaction tests
across the entire filled areas and a site classification report for each lot subject to filling. The extent
of fill and each lot site classification shall be shown on a metes and bounds survey plan.
H o:\database\onestop\decision.doc
Print Date: 26 February 2020, 3:13 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.