3.4 PRE-DEVELOPMENT SITE XP-STORM
A peak flow analysis has been undertaken using the XP-STORM version 2021.3 for sizing the detention
tank. The pre-development site was modelled using a single node and peak flows verified against the
Rational Method Calculation.
3.4.1 CATCHMENT DATA
Table 3 presents the catchment modelled in XP-STORM. Refer to Drawings No. M3024E_DA1_SK01 in
Appendix D for the catchment plan.
Table 3 – Pre-Development Catchment Data
Fraction Vectored Slope
Catchment Area (ha)
Impervious (%)
E1 0.0486 57% 10%
3.4.2 RAINFALL DATA
The site specific 2016 rainfall intensities obtained from BOM coupled Australian Rainfall & Runoff (AR&R)
1987 temporal patterns for zone 3 have been used to generate peak flow hydrographs in XP-STORM.
3.4.3 HYDROLOGICAL LOSSES
The following initial loss, continuous loss and Manning’s n values have been adopted for the
hydrological modelling. They are within the ranges recommended in the AR&R (1987) for Southeast
Queensland.
Table 4 – Hydrological Losses
Continuing Loss
AEP Area Type Initial Loss (mm) Manning’s n
(mm/hr)
Impervious Area 0 0 0.014
63% to 1%
Pervious Area 15 2 0.07
3.4.4 BX FACTOR
A Bx factor of 1.8 has been used across all AEPs modelled.
3.4.5 EXISTING PEAK DISCHARGE
The XP-STORM hydrology was run for the standard AEPs from a 63% AEP to a 1% AEP and 15 to 180-
minute standard durations. Table 5 presents pre-development site peak flows.
Table 5 – Pre-Development Peak Flows
Pre-Development Peak Flows (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Rational Calc 0.010 0.013 0.018 0.022 0.026 0.033 0.037
XP-STORM 0.012 0.017 0.021 0.027 0.032 0.034 0.038
Variance +0.002 +0.004 +0.003 +0.005 +0.006 +0.001 +0.001
The XP-STORM peak flows are generally similar to the Rational Method Calculation, particularly for the
larger 1% and 2% AEP storms. On that basis, the XP-STORM peak flow rates have been used for the
peak flow and detention tank analysis for this site.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment F_Stormwater_Management_Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.