3.5 POST-DEVELOPMENT SITE XP-STORM
3.5.1 CATCHMENT DATA
Table 6 presents the post-development catchment details. Drawing No. M3024E_DA1_SK02 in
Appendix D presents the catchment delineation.
Table 6 – Post-Development Catchment Data
Fraction Vectored Slope
Catchment Area (ha)
Impervious (%)
D1 0.0335 100% 10%
D2 0.0121 66% 10%
D3 0.0030 100% 10%
Total 0.0486 92% 10%
The following catchment arrangements have been modelled:
5% AEP from catchment D1 has been modelled to enter the detention tank. Larger flows bypass
detention.
1% AEP from catchment D2 has been modelled to enter the detention tank.
Catchment D3 bypasses the detention tank.
Figure 5 presents the XP-STORM layout for the post-development site.
Figure 5 – Post-Development XP-STORM Layout
3.5.2 RAINFALL DATA, HYDROLOGICAL LOSSES & BX FACTOR
As per the pre-development scenario.
SITE BASED STORMWATER MANAGEMENT PLAN – Revision B 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment F_Stormwater_Management_Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.