3.5.3    DETENTION TANK

Table 7 presents the detention tank parameters modelled. Refer to Appendix C for the stage vs area
relationship. Re-analysis will be required if the stage-area relationship is significantly altered.

                                         Table 7 – Detention Tank Details
                                Parameter                                     Value
                 Detention Tank Dimensions (m)                4.5m² surface area x 3m deep (min)
                 Available Volume (m³)                                         13.5
                 Available Depth (m)                                         3.0 (min)
                 Detention Tank IL (m AHD)                                    30.26
                 Orifice Outlet                                    75mm dia at IL 30.26m AHD
                 Weir Outlet                                   1200mm weir at RL 33.11m AHD


3.5.4    POST-DEVELOPMENT PEAK DISCHARGE

The XP-STORM was run for 63% AEP to 1% AEP storms with 15 to 180-minute standard durations.
Table 8 presents the peak flow results.

                             Table 8 – Pre & Post-Development Peak Flows (XP-STORM)
                                                        Peak Flow Results (m³/s)
                     63% AEP       39% AEP       20% AEP           10% AEP      5% AEP          2% AEP        1% AEP
    Post-Dev.          0.012         0.014           0.016          0.018        0.021           0.022         0.025
     Pre-Dev.          0.012         0.017           0.021          0.027        0.032           0.034         0.038
     Variance            0          -0.003           -0.005        -0.009       -0.011          -0.012         -0.013

The results show peak flow rates are not increased. Moreover, the 1% AEP flow is limited to 25L/s
(0.025m³/s).

3.5.5    DETENTION TANK RESULTS

Table 9 presents the detention tank performance. As can be seen, the 1% AEP volume is within the
nominated minimum tank volume.

                                         Table 9 – Detention Tank Results
                     63% AEP       39% AEP       20% AEP           10% AEP      5% AEP          2% AEP        1% AEP
   Tank Inflow
                       0.017         0.022           0.026          0.030        0.034           0.035         0.037
     (m³/s)
  Tank Outflow
                       0.011         0.013           0.015          0.017        0.019           0.021         0.023
     (m³/s)
    Detention
                        4.1           5.5             7.0            8.7         10.3            11.4           12.9
  Volume (m³)
    Depth of
                       0.90          1.22            1.56           1.93         2.29            2.53           2.85
    Water (m)




SITE BASED STORMWATER MANAGEMENT PLAN – Revision B                                    36 & 38 DUKE STREET, SUNSHINE BEACH
                                                      P a g e |9

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment F_Stormwater_Management_Plan.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.