Skip to the record
The only place to find full transcripts.

Council archive · source document

Attachment F_Stormwater_Management_Plan · MCU23/0070

of 35

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
SITE BASED STORMWATER MANAGEMENT PLAN


Proposed Development at
36 & 38 DUKE STREET, SUNSHINE BEACH
for
Cambooya Pty Ltd


M3024E_DA1_SBSMP –Revision B
September 2023

JFP Urban Consultants Pty Ltd
Prepared by: C. Blair
Approved by: A. Fraser



  Revision        Date                       Details           Prepared By           Approved By
     A        20/04/2023      For Authority Submission       CB (RPEQ 19190)        AF (RPEQ 5691)
     B        18/09/2023      Information Request Response   CB (RPEQ 19190)        AF (RPEQ 5691)




SITE BASED STORMWATER MANAGEMENT PLAN – Revision B                   36 & 38 DUKE STREET, SUNSHINE BEACH

Used in these records

About this file

File size
5.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment F_Stormwater_Management_Plan.pdf · 5.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.