Council archive · source document
Appendix D - Traffic Engineering Report · MCU23/0070
It is noted that the car parking layout is constrained site area, has access limitations (due to turning right- in/right-out from Douglas Lane) and includes parallel parking spaces on one side of the car park. Given these combination of factors, TTM has completed swept path analysis for all typical parking spaces (including end space R3 with the reduced parking aisle extension) to confirm adequate on-site manoeuvring for vehicles is possible; allowing forward entry and exit form Douglas Lane. These swept paths have also been completed for a worst case AS2980.1:2004 B99 vehicle, as requested by NC during the pre-lodgement meeting. A copy of these swept path plans is included in Appendix B, which confirms that access to all parking spaces is possible; with at worst a 3-point turn being required. This is considered reasonable given the small and low turnover nature of the car park. This analysis also shows that access to Space R3 (PWD bay) is possible despite the reduced parking aisle extension, with vehicles able to utilise part of the shared zone adjacent and backing zone for manoeuvring purposes. Overall, TTM consider the car parking layout is acceptable. Site: 36 - 38 Duke Street, Sunshine Beach 12 Reference: 23BRT0004 RP01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - Traffic Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.