Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Appendix D - Traffic Engineering Report · MCU23/0070

of 30

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

To quantify this, TTM have assessed this based on the estimated peak hour demands likely to access the car
park of 2vph (as detailed in Section 7). The time it would typically take for a vehicle to manoeuvre in/out of
the visitor space would be no more than say 30 seconds, which may occur say once during the peak hour.
Based on the Poisson Distribution of random vehicle arrivals (Equation 4.5 of Austroads Guide to Traffic
Management Part 2: Traffic Theory Concepts), for an average arrival rate of 2vph there is only a 1% chance
that a vehicle would arrive during the specific 30-second period in which the vehicle would be manoeuvring
out of the visitor space. This is well below the typical 5% confidence level (95th percentile) adopted for
determining acceptable queuing provisions.

On this basis, the proposed internal queueing provision is considered acceptable.

Maximum Driveway Grade

TTM has not assessed the driveway grades in detail as these are not identified on the development plans. It
is understood that the project teams’ civil engineer has documented and resolved the driveway grades and
has provided confirmation these meet the requirements of AS2890.1:2004. Refer to the civil engineers’
reporting/plans for further details.


Overall, TTM consider the proposed vehicular access arrangements (excluding grades, as these have not
been assessed) are acceptable for the proposed development).

5.2 Active Transport Access
Primary pedestrian access to the building and Food & Drink outlet tenancies from Duke Street. From here an
access corridor is provided to the building lifts and stairs servicing the Short Term Accommodation units.

Cyclist access is possible via the following means:

•    From the Duke Street footpath, to access the bicycle spaces located near the main building entry, or
     access bicycle spaces in the car park via the lifts.

•    From Douglas Lane with ride up access to the Short Term Accommodation bicycle spaces.




Site: 36 - 38 Duke Street, Sunshine Beach                                                                   15
Reference: 23BRT0004 RP01

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D - Traffic Engineering Report.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.