Council archive · source document
Appendix D - Traffic Engineering Report · MCU23/0070
As can be seen Table 7.1, the proposed development is expected to result in a net reduction in traffic generation potential of 3vph in the peak hours and 34vpd daily. This means the development will have a net improvement in terms of impacts on the wider surrounding road network. With regards to traffic movement demands using the on-site car park, as previously noted the parking supply will be primarily related to the Short Term Accommodation uses. All traffic/parking demands associated with the Food and Drink Outlet uses will be off-site (i.e. surrounding streets to access street parking). This means that the increase in traffic demands using Douglas Lane and accessing the on-site car park will be: • 2vph in peak hours • 15vpd daily. These traffic movement demand increases are minor and expected to have no adverse impacts to the function of Douglas Lane. Given the overall net reduction in traffic generation potential, and expected only minor increase in traffic using Douglas Lane due to the new on-site car park, no further assessment of the external traffic impacts of the development is considered necessary. Site: 36 - 38 Duke Street, Sunshine Beach 18 Reference: 23BRT0004 RP01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - Traffic Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.