Skip to the record
Beware of cheap imitations.

Council archive · source document

Appendix D - Traffic Engineering Report · MCU23/0070

of 30

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

8            Summary and Conclusions
8.1          Parking Arrangements
The proposed development provides an on-site parking supply of 6 car spaces (including 1 PWD space), 2
motorcycle spaces and 8 bicycle spaces. The car parking supply is below the requirement of the Noosa Plan
2020 Driveways and Parking Code (10 spaces minimum), which is proposed to be overcome though enacting
the NC parking contributions policy. However, it is noted that when compared to the existing lawful site uses
(and lack of existing on-site parking supply), the proposed development will actually result in a net reduction
in demand for off-site parking. It would therefore be reasonable to suggest that no monetary contributions
need be provided for the proposed development. The motorcycle parking supply also falls below the
Driveways and Parking Code requirement, but is considered sufficient to accommodate the development
needs. Bicycle parking supply exceeds the requirements of the Driveways and Parking Code.

The on-site car parking layout meets all requirements of AS2890, with exception for a non-standard end aisle
treatment. All typical on-site parking spaces have been tested with swept path analysis which confirms
suitable access and manoeuvring for a B99 vehicle is possible; entering and exiting the site in a forward
manner.

8.2          Site Access Arrangements
The development plan includes a single 5.5m wide vehicular driveway crossover to Douglas Lane in the
middle of the site frontage. This access will be priority controlled and limited to right-in/right-out
movements given the one-way nature of Douglas Lane. The design provisions for the vehicular access have
been resolved as performance solutions for a number of elements, including driveway width/flares, sight
distance and internal queuing, which are considered acceptable given the practical operations of the car
park and constraints posed by Douglas Lane. Driveway grades have also not been assessed in detail by TTM
as these have been resolved by the civil engineer.

Active transport access provisions for the development scheme include primary pedestrian access to the
building from Duke Street and bicycle access via either the pedestrian access from Duke Street or vehicular
access from Douglas Lane.

8.3          Service Vehicle Arrangements
Servicing for the development will be similar to the existing site uses. Access for smaller vehicles is possible
via the on-site car park (parking in the visitor space). Larger delivery vehicles cannot physically access the site
given the constrained nature of Douglas Lane. Such vehicles can still service the site utilising the existing on-
street loading zones on Douglas Lane and Duke Street which are in close proximity to the site.

A storage area for bulk 1100L refuse bins is provided in close proximity to Douglas Lane, allowing collection
by a rear-loading RCV (as currently uses Douglas Lane to service the existing site uses and adjacent
properties).



Site: 36 - 38 Duke Street, Sunshine Beach                                                                      19
Reference: 23BRT0004 RP01

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D - Traffic Engineering Report.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.