Council archive · source document
Appendix D - Traffic Engineering Report · MCU23/0070
8.4 Impact on Surrounding Road Network The proposed development is expected to result in a net decrease in traffic generation potential of 3vph (peak hour) and 34vpd (daily) when compared to existing site uses. The traffic demands associated with the on-site car park (required to use Douglas Lane) are also expected to be modest; up to 2vph (peak hour) and 15vpd (daily). Overall, TTM consider the proposed development will therefore have no adverse impacts on the surrounding road network. 8.5 Conclusion Based on the assessment contained within this report, TTM see no traffic engineering reason why the relevant approvals should not be granted. Site: 36 - 38 Duke Street, Sunshine Beach 20 Reference: 23BRT0004 RP01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - Traffic Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.