Skip to the record
For the highest quality transcripts.

Council archive · source document

Appendix D - Traffic Engineering Report · MCU23/0070

of 30

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

8.4          Impact on Surrounding Road Network
The proposed development is expected to result in a net decrease in traffic generation potential of 3vph
(peak hour) and 34vpd (daily) when compared to existing site uses. The traffic demands associated with the
on-site car park (required to use Douglas Lane) are also expected to be modest; up to 2vph (peak hour) and
15vpd (daily). Overall, TTM consider the proposed development will therefore have no adverse impacts on
the surrounding road network.

8.5          Conclusion
Based on the assessment contained within this report, TTM see no traffic engineering reason why the
relevant approvals should not be granted.




Site: 36 - 38 Duke Street, Sunshine Beach                                                               20
Reference: 23BRT0004 RP01

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D - Traffic Engineering Report.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.