Council archive · source document
Appendix D - Traffic Engineering Report · MCU23/0070
B9 Vehicle(R
ealistcminrad
ius)(20 4)
dius)(20 4)
ealistcminra
B9 Vehicle(R
dius)(20 4)
ealistcminra
B9 Vehicle(R
S
CAR SPACE V1 - ENTRY MOVEMENT CAR SPACE R3 - ENTRY MOVEMENT
VEHICLE CLEARANCE
300mm (DASHED LINE)
BLUE - VEHICLE BODY
5.2 B99 Vehicle (AS2890.1:2004)
Overall Length 5.200m
Overall Width 1.940m
Overall Body Height 1.878m
Min Body Ground Clearance 0.272m
Track Width 1.840m
dius)(20 4)
Lock-to-lock time 4.00s
0.95 3.05
Curb to Curb Turning Radius 6.250m
ealistcminra
Design Speed Forward 5.0km/h
ius)(20 4)
B9 Vehicle(R
Clearance Envelope 0.300m
ius)(20 4)
ealistcminrad
alistcminrad
B9 Vehicle(R
e
B9 Vehicle(R
FOR APPROVAL
19 Apr 2023
CAR SPACE V1 - EXIT MOVEMENT CAR SPACE R3 - EXIT MOVEMENT NOT FOR
CONSTRUCTION
SCALE PROJECT PROJECT NUMBER ORIGINAL SIZE
0 2 4 6 8 10m
TTM CONSULTING PTY LTD 36-38 DUKE STREET, SUNSHINE BEACH 23BRT0004 A3
ABN 65 010 868 621 DRAWING TITLE DRAWING NUMBER REVISION
SCALE 1:200 AT ORIGINAL SIZE
LEVEL 8, 369 Ann Street, BRISBANE QLD 4000
NORTH CLIENT P.O. BOX 12015, BRISBANE QLD 4003 23BRT0004-01 A
SWEPT PATH ANALYSIS
CAMBOOYA PTY LTD T: (07) 3327 9500 F: (07) 3327 9501 TYPICAL CAR PARKING SPACE MANEUVERING DATE SHEET
A 19-04-23 ORIGINAL ISSUE RB RB RB E: [email protected] W: www.ttmgroup.com.au
B99 DESIGN VEHICLE 19 Apr 2023 1 OF 1
REV. DATE AMENDMENT DESCRIPTION DRAWN CHECKED APPROVED
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - Traffic Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.