Council archive · source document
Appendix D - Traffic Engineering Report · MCU23/0070
0 4) B9 Vehicle(R
c(Realist minradius)(2 ealistcminra
dius)(20 4)
B9 Vehicle
dius)(20 4)
ealistcminra
B9 Vehicle(R
B9 Vehicle(
Realistcmin
ra dius)(20 4)
CAR SPACE R4 - ENTRY MOVEMENT CAR SPACE R5 - ENTRY MOVEMENT
VEHICLE CLEARANCE
B9 Vehicle(R 300mm (DASHED LINE)
ealistcminra
dius)(20 4)
B9 Vehicle(
Realistcmin B9 Vehicle(
radius)(20 4) Realistcmin
BLUE - VEHICLE BODY
radius)(20 4)
5.2 B99 Vehicle (AS2890.1:2004)
Overall Length 5.200m
B9 Vehicle(R Overall Width
Overall Body Height
1.940m
1.878m
ealistcminra Min Body Ground Clearance 0.272m
dius)(20 4) 0.95 3.05
Track Width
Lock-to-lock time
Curb to Curb Turning Radius
1.840m
4.00s
6.250m
Design Speed Forward 5.0km/h
Clearance Envelope 0.300m
3-POINT CORRECTIVE
TURN REQUIRE
3-POINT CORRECTIVE FOR APPROVAL
TURN REQUIRE
19 Apr 2023
CAR SPACE R4 - EXIT MOVEMENT CAR SPACE R5 - EXIT MOVEMENT NOT FOR
CONSTRUCTION
SCALE PROJECT PROJECT NUMBER ORIGINAL SIZE
0 2 4 6 8 10m
TTM CONSULTING PTY LTD 36-38 DUKE STREET, SUNSHINE BEACH 23BRT0004 A3
ABN 65 010 868 621 DRAWING TITLE DRAWING NUMBER REVISION
SCALE 1:200 AT ORIGINAL SIZE
LEVEL 8, 369 Ann Street, BRISBANE QLD 4000
NORTH CLIENT P.O. BOX 12015, BRISBANE QLD 4003 23BRT0004-02 A
SWEPT PATH ANALYSIS
CAMBOOYA PTY LTD T: (07) 3327 9500 F: (07) 3327 9501 TYPICAL CAR PARKING SPACE MANEUVERING DATE SHEET
A 19-04-23 ORIGINAL ISSUE RB RB RB E: [email protected] W: www.ttmgroup.com.au
B99 DESIGN VEHICLE 19 Apr 2023 1 OF 1
REV. DATE AMENDMENT DESCRIPTION DRAWN CHECKED APPROVED
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D - Traffic Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.