Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2505-45930 SRA_Response with conditions_MCU25-0025

Attached to the e-mail MCU25/0025 - SARA Referral agency response – with conditions.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                              2505-45930 SRA




Attachment 2—Advice to the applicant

General advice
1.      Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
        or the State Development Assessment Provisions (SDAP) (version 3.2). If a word remains
        undefined it has its ordinary meaning.
2.      Transport noise corridor: Mandatory Part (MP) 4.4 of the Queensland Development Code
        (QDC) commenced on 1 September 2010 and applies to building work for the construction or
        renovation of a residential building in a designated transport noise corridor. MP4.4 seeks to
        ensure that the habitable rooms of Class 1, 2, 3 and 4 buildings located in a transport noise
        corridor are designed and constructed to reduce transport noise. Transport noise corridor
        means land designated under Chapter 8B of the Building Act 1975 as a transport noise
        corridor. A free online search tool can be used to find out whether a property is located in a
        designated transport noise corridor. This tool is available online at:
        https://www.business.qld.gov.au/industries/building-property-development/building-
        construction/lawscodes-standards/queensland-development-code/transport-noise-corridors

        This tool allows searches on a registered lot number and/or property address to determine
        whether and how the QDC applies to the land.
3.      Public utility works and connection approval: The applicant is advised that if any works
        and/or connections are required to public utility services within a State-controlled road corridor,
        approval must be given by the Department of Transport and Main Roads under the relevant
        public utility legislation (electricity, water/sewer, telecommunication), and in accordance with
        TMR technical standards (TN163). Approvals must be obtained prior to commencing any utility
        works within the state-controlled road corridor. Please contact the public utility team via
        [email protected] for further information on the application and approval process.




State Assessment and Referral Agency                                                              Page 5 of 7
Log in to download the original file

2505-45930 SRA_Response with conditions_MCU25-0025.pdf · 311 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.