Council archive · source document
AS PUBLISHED - Information Request - 132008.299.02
(iv) The assessment of patron noise has been provided for the LAeq parameter only,
include assessment of the LAmax parameter also for outdoor areas that will be
used in the 10pm to 7am time period.
(v) Justify the patron numbers used in the assessment as Table 7 indicates only 18
persons spread over three outdoor areas whereas the proposal is for 48
persons. Provide revised assessment with more realistic patron numbers in
outdoor areas.
9. The Report did not consider amplified sound i.e. music in either indoor or outdoor
areas. Provide assessment including amplified sound (music) in at least outdoor areas
reflecting the common practice of use of Bluetooth speakers.
10. Provide assessment of noise from within accommodation rooms and how this complies
with the relevant noise criteria and provide specifications for acoustic ratings of façade
elements.
11. Provide clarification of the adopted location of air-conditioning units for the development
on an elevation and how these are included in the noise model.
12. Assessment of carparking noise appears to only represent car movements, include
assessment of carparking noise including car door closures, engine starts and people
talking the carparking area.
13. Assessment of service vehicles appears to only represent the noise of vehicle
movements, include noise associated with loading/unloading and refuse collection.
Issue - Car Parking
Car Parking Plan (CD-D05, Rev A) prepared by Andrew Bock Architecture details the
carparking and manoeuvring arrangement, including multiple vehicles swept paths.
The plan involves parking and manoeuvring areas within the 2-metre road frontage setback.
Information Required
14. On‑site vehicle manoeuvring has not been clearly demonstrated, as the submitted plan
shows multiple vehicle swept paths overlaid on a single drawing.
Provide revised swept path plans prepared by a Registered Professional Engineer of
Queensland (RPEQ) separated across multiple drawings to demonstrate a B85 and B
99 vehicle as described in AS/NZS2890.1:2004 can enter and exit in a forward gear in
accordance with AO10 of the Driveways and Parking Code.
Provided amended plans demonstrating a carparking arrangement compliant with
AO8.1/PO8 of the Driveways and Parking Code.
15. In accordance with A06.1 of the Driveways and Parking Code it is unclear how onsite
carparking will be allocated based on a 102 persons and 1 Manager unit, sufficient to
accommodate 8.5 / 9 spaces for guests, 1 space for a Manager, staff (tbc) and a Mini
bus as well as Motor cycle and Bicycle spaces.
It is noted within the planning report that Lot 5 includes provision for a van space,
however a preliminary review of the approved plans does not clearly indicate a minibus
park within Lot 5.
Backpackers’ accommodation
i. one space per 12 guests capable of being accommodated; and
ii. one space per staff member; and
iii. one space for a courtesy shuttle bus
Motor cycle spaces
Page 4 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
AS PUBLISHED - Information Request - 132008.299.02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 231 KB (small file)
- File type
No other editions are linked here.