6119 - Att B - Current Approval - 132002.220527.1 (23069 DA)
132002.220527.1
Building
14. The geotechnical report submitted as part of your application has been appraised and
approved subject to the following conditions:
14.1. There is to be no uncontrolled discharge of water onto the slope.
14.2. Stripping of vegetation for construction purposes should be minimised. If
vegetation is destroyed it should be reinstated immediately after construction is
completed.
14.3. Additional load due to fill, construction equipment or stockpiled materials should
not be located on the dune slope.
14.4. The use of vibratory equipment of any kind is not permitted to be used, including
vibrating rollers, the use of vibrating installation techniques for sheet piling and
other construction vibrations caused by excavating, earthmoving or demolition
machinery or other similar construction techniques.
14.5. Copies of all inspection reports by engineers are to be submitted to Council within
5 business days of the inspection taking place.
14.6. The applicant shall pay Council’s reasonable costs in relation to any geotechnical
advice sought by it in relation to this development provided that a quotation of the
likely costs to be incurred be obtained from the Council’s consultants Messrs
Coffey Geosciences Pty Ltd and that the amount of such costs be agreed to by the
applicant before the advice is obtained.
14.7. The client is to re-engage the services of a suitably qualified engineer to oversee
the piling works and copies of all inspection reports are to be submitted to Council
within 5 business days of the inspection taking place.
Additional Conditions 26 May 2015
Approved Plans
15. Development undertaken in accordance with this change to existing approval
132002.220527.1 must generally comply with the approved plans of development. The
approved plans are listed in the following table unless otherwise amended by these
conditions.
Plan No. Rev. Plan/Document Name Date
Proposed Site Plan, prepared by PCA Architects as 26 May 2015
annotated by Council
Proposed Ground Floor Plan, prepared by PCA 26 May 2015
Architects as annotated by Council
Proposed First Floor Plan, prepared by PCA Architects 26 May 2015
as annotated by Council
Proposed East Elevation, prepared by PCA Architects 26 May 2015
as annotated by Council
Proposed North Elevation, prepared by PCA Architects 26 May 2015
as annotated by Council
Proposed West Elevation, prepared by PCA Architects 26 May 2015
as annotated by Council
Proposed South Elevation, prepared by PCA Architects 26 May 2015
as annotated by Council
Page 3 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.