Water Supply and Sewerage Analysis
The existing design details of NVL011 and its rising main are shown in Table 6-1.
Table 6-1 NVL011 and Rising Main Design Capacities
Total Total Rising Velocity at Headloss at
Pump
Design Pump Power Main Total Pump Total Pump
Head
Capacity Flow Rating Diameter capacity capacity
EP
(L/s) (m) (kW) (mm) (m/s) (m)
1 1 1 1
3,267 34 23.6 22.00 200.00 1.08 15.15
Note: 1. Based on Pump Curve NP3171.181 and design operating point
6.2.1.1 NVL011 including Noosa on Weyba
The addition of the Noosa on Weyba Development represents an increase in the ultimate catchment size of
about 45%. The increase in population triggers an augmentation of NVL011. Based on the design capacity of
the pump station, it has sufficient capacity to accommodate a portion of the proposed Noosa on Weyba
development after 2016. The spare capacity available at NVL011 represents approximately 20% of the full
yield for the Noosa on Weyba development.
The ultimate size of the NVL011 with the inclusion of the Noosa on Weyba development is presented in
Table 6-2.
Table 6-2 NVL011 Ultimate Capacities
Required
Velocity Headloss
Single Rising
Design Design at Total at Total
Pump Main
PWWF Head Pump Pump
Design Existing power Diameter
capacity capacity
Scenario EP (kW)
(L/s) (m) (kW) (mm) (m/s) (m)
Ultimate 2,909 30.30 24.50 22.00 200 1.08 15.15
Ultimate with
1 5,280 55.00 41.00 34.00 200 1.75 37.04
Development
Note: 1 – Based on nominal pump station data and GIS information for the Rising main.
6.2.2 Eenie Creek Road Trunk Mains
Analysis of the parallel trunk 600 m and 525 mm diameter gravity mains along Eenie Creek Road has been
undertaken. A trunk network model was constructed in H20Map SWMM to represent the trunk mains from
the discharge point from NVL011 and the catchments to the north to NVL040.
The analysis indicated that the trunk mains do not surcharge with the inclusion of the Noosa on Weyba
Development as illustrated in the Figure 6-1
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.