                                                                                                          Noosa on Weyba
                                                                                        Water Supply and Sewerage Analysis




Figure 6-1 Eenie Creek Road Trunk Main Hydraulic Analysis Results



6.2.3          Pump Station NVL040
The parallel gravity mains discharge into the existing major pump station NVL040. This pump station collects
flows from several local catchments and conveys flow via a 450 mm diameter rising main to the Noosa
Heads STP. It services an existing population of almost 19,600EP with an ultimate service population near
23,500EP.
The inclusion of the Noosa on Weyba 2,370EP represents a 10% increase in service population ultimately.
An analysis of this pump station and downstream infrastructure was undertaken to assess the impact of the
development.
The existing design details of NVL040 and its rising main are detailed in Table 6-3.

Table 6-3      NVL040 Design capacities
                                                              Velocity       Headloss
              Total                  Total        Rising
                           Pump                               at Total       at Total
              Pump              1    Power        Main
 Existing          1       Head             1                 Pump           Pump
              Flow                   Rating       Diameter
                                                              capacity       capacity
 EP

              (L/s)        (m)       (kW)         (mm)        (m/s)          (m)


 21,600       225.00       41.80     123.00       450         1.38           11.19

Note: 1. Based on Pump Curve CS3231 /735and design operating point




6.2.3.1        NVL040 including Noosa on Weyba
The addition of the Noosa on Weyba Development represents an increase in the ultimate catchment size of
about 10%. The increase in population does not trigger an augmentation to NVL040. It is expected that the
existing pump should be adequate to accommodate the increase in flow. However it would be operating at a
lower efficiency. Table 6-4 details the pump station requirements with the inclusion of the proposed
development.


Northbrook Corporation Pty. Ltd.                        Version 4                                       17 September 2013
5101-19                                           Commercial in Confidence                                       Page 11

Used in these records

About this file

File size
11.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 15- Amended Water Supply and Sewerage Analysis MCU12_0208.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.