Council archive · source document
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208
Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa on Weyba Water Network Performance Assessment Unitywater Noosa on Weyba Water Network Performance Assessment CONTENTS 1 Introduction .............................................................................................................................. 1 1.1 Methodology........................................................................................................................ 1 1.2 Assumptions........................................................................................................................ 1 2 Hydraulic Model ....................................................................................................................... 2 2.1 Model Update ...................................................................................................................... 2 2.2 Model Demand .................................................................................................................... 2 3 Standards of Service ................................................................................................................ 3 4 Network Performance ............................................................................................................... 4 4.1 Maximum Hour Pressure Performance .................................................................................. 4 4.2 Fire Flow Pressure Performance ........................................................................................... 6 4.3 Storage Assesment .............................................................................................................. 6 5 Conclusions ............................................................................................................................. 9 LIST OF TABLES Table 2-1: EP Summary for Proposed Noosa on Weyba Development ................................................ 3 Table 2-2: Model Demand for Proposed Noosa on Weyba Development ............................................. 3 Table 4-1: 2038 Maximum Hour Pressure Performance ..................................................................... 5 Table 4-2: 2038 Fire Flow Pressure Performance at 2/3 Maximum Hour .............................................. 6 Table 4-3: Tewantn Reservoir Storage Assesment without Noosa on Weyba ....................................... 8 Table 4-4: Tewantin Reservoir Storage Assessment including Noosa on Weyba .................................. 8 LIST OF FIGURES Figure 2-1: Updated Model Pipes ..................................................................................................... 2 Figure 4-1: Network Performance Critical Pressure Locations............................................................. 4 Figure 4-2 : Tewantin Reservoir Zone ............................................................................................... 7 APPENDICES Appendix A Cardno Assessment Brief Status: Draft 22/06/2012 Project number: Our ref: Noosa on Weyba WS Assessment.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.