Skip to the record
For the highest quality transcripts.

Council archive · source document

Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                             Noosa on Weyba Water Network Performance Assessment




Figure 4-2 : Tewantin Reservoir Zone
As the Noosa on Weyba development is located outside of existing PIP boundaries it has not been
considerd in any previous water supply planning including allowance in reservoir sizing. Storage
assessment was undertake through application of the following DSS taken from the SEQ Water and
Sewerage Planning Guidelines.
Average Day Demand:
   • Detached Residential – 280 L/p/day
   • Attached Residential – 260 L/p/day
   • Non Residential – 280 L/EP/day
Mean Day Maximum Month Demand:
   • Detached Residential – 1.5 x AD demand
   • Attached Residential – 1.5 x AD demand
   • Non Residential – 1.5 x AD demand
Maximum Day Demand:
   • Detached Residential – 2 x AD demand
   • Attached Residential – 2 x AD demand
   • Non Residential – 2 x AD demand
Ground Level Storage Requirement:
   • Maximum Day (ML) + the higher of 4 hrs of MDMM or 0.5 ML
The 2012 Unitywater Demand Model was used in the storage assessment.
Assessment prior to inclusion of the Noosa on Weyba development identified a minor deficiency at the
2031 plannig horizon as shown in Table 4-3. Table 4-4 shows that with inclusion of the development
storage deficiency is bought forward to the 2016 plannig horizon. Addtional storage within the Tewantin
Suppied reservoir zone is required prior to 2016 for standards of service to be met with inclusion of the
Noosa on Weyba development. A total storage deficit of 1.64 ML is estimated at 2031.




Status: Draft                                                                                          22/06/2012
Project number:                                   Page 7               Our ref: Noosa on Weyba WS Assessment.docx

Used in these records

About this file

File size
11.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 15- Amended Water Supply and Sewerage Analysis MCU12_0208.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.