Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208

of 63

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Unitywater Caboolture

\BN: 89

   

 

1300 0 UNITY (1300 ¢
onira www.unitywater.com

Joshua Lake

Planning Engineer

Cardno

Locked Bag 4006
Fortitude Valley QLD 4006

23 May 2013

Dear Josh

Noosa on Weyba

We offer the following comments in relation to water and sewerage network details provided in
the report;

External Network

1.

Our current Standards of Service allow 2.7 EP/detached and 1.8 EP/attached
residential dwelling.

The analysis needs to consider the possibility of the higher loadings (notionally 3155
EP) suggested in your email of 19 April.

Can you confirm that the analysis of the trunk mains along Eenie Creek Road
recognises that it is a single 600 mm main initially, and that it does not become a twin
main until about CH 480. A schematic illustrating the connectivity and inflows would be
helpful (Figure 2 is not clear).

Further assessment of NVL011 is required to establish that no major augmentation of
either the station or the pressure main is necessary. This will entail;

A review of the as-constructed drawings and a possible inspection onsite of NVLO11 is
required to confirm that the station has sufficient storage, adequately sized internal
pipework, and space to accommodate the required pumps. Mr. lan Grieve from
Unitywater will provide whatever record information we have and will arrange an
inspection if required.

Following on from above, some further analysis is required to confirm the existing
station and pressure main can carry the relatively large additional load without any
major augmentation. In particular, we would like to review the proposed pumps and
duties (Normal and under PWWF) to check that the upgraded station operates
efficiently over the required range of new flows.

Page 1 of 3

 

Unitywater is a statutory authority that services the Moreton Bay and Sunshine Coast local authority areas on behalf of its citizens

Unitywater is governed by an independent board. Councils do not have control or direction over day to day operations

Used in these records

About this file

File size
11.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 15- Amended Water Supply and Sewerage Analysis MCU12_0208.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.