Unitywater

5. We confirm that NVLO40 and the downstream main to the STP have sufficient capacity
to accommodate the proposed development.

Treatment.

6. The Noosa STP is operating close to its design capacity. A new Licence for the plant is
still to be finalised. Unitywater are negotiating with the contracted plant operator
(Degremont) for a minimalist augmentation to cover the limited future growth anticipated
for Noosa. We have included a higher load option that would accommodate this
development. Note, although the expected load from this development is small in
absolute terms, it is significant relative to both the remaining available capacity at the
plant, and to the anticipated future growth within Noosa. It could therefore trigger some
step-change in process or operational improvements. Negotiations are ongoing with
Degremont and it is expected that we will have some further information on this by
August 2013.

7. Inrelation to local or onsite treatment options, Unitywater are not involved in the
assessment or approval of these schemes. Our only comment in relation to these
schemes is that Unitywater would not be interested in taking over ownership or
operation of a small treatment facility.

8. The suggestion of carting sullage waste offsite as a possible treatment option is not
something we would comment on, other than in relation to the proposed destination.
Note, we have recently redirected sullage waste away from Noosa (for reasons of load)
to Nambour STP. Carting sullage to Coolum STP would also be problematic as this
facility is also well loaded.

Works Internal

9. The proposal for 5 sewage pump stations servicing 800 customers is not acceptable.
The configuration as proposed would entail 1 pump station for as few as 160
customers. An alternative configuration is required.

10. Unitywater are not predisposed to permitting low pressure sewer systems except in
circumstances relating to infill or backlog schemes. If they are to be used, they would
need to be privately owned and operated. In addition, if these systems are to be owned
by individual customers of Unitywater (as opposed to being owned by a body
corporate), it would need to be demonstrated that the low pressure system proposed
provides the least cost whole-of-life solution.

Page 2 of 3

Unitywater is a statutory authority that services the Moreton Bay and Sunshine Coast local authority areas on behalf of its citizens
Unitywater is governed by an independent board. Councils do not have control or direction over day to day operations

Used in these records

About this file

File size
11.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 15- Amended Water Supply and Sewerage Analysis MCU12_0208.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.