Council archive · source document
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208
Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa on Weyba
Water Supply and Sewerage Analysis
4 Noosa on Weyba Flow Projections
The water supply demands and sewerage flows for the proposed Noosa on Weyba development are based
on the adopted DSS and population projections.
4.1 Water Supply Demands
The projected water supply demands for the Noosa on Weyba development are provided in Table 4-1 below.
Table 4-1 Water Supply Demands
Maximum 2/3 Maximum Required
Average Day
EP Hour Hour Fire Flow
(ML/d) (L/s) (L/s) (L/s) (L/s)
2,370 0.66 7.68 28.67 19.1 30
4.2 Sewerage Flows
The projected sewerage flows for Noosa on Weyba are provided in Table 4-2 below.
Table 4-2 Sewerage Flow Projections
Peak Dry
Average Day Weather Flow Peak Wet Weather
Weather Flow
(ADWF) Flow (PWWF)
EP (PDWF)
(ML/d) (L/s) (L/s) (L/s)
2,370 0.43 4.94 12.76 24.69
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.