Council archive · source document
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208
Very large file (11.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa on Weyba
Water Supply and Sewerage Analysis
3.2 Sewerage
The adopted DSS for sewer is detailed in Table 3-2.
Table 3-2 Adopted Sewerage Network Planning DSS
Item Detail
Average Dry Weather Flow (ADWF) 180 L/EP/d
Peak Wet Weather Flow (PWWF) 900 L/EP/d
Minimum velocity @ PDWF 0.7 m/s
Gravity Main Design Criteria Maximum velocity @ PWWF 3 m/s
Depth of flow @ PWWF 0.75d of pipe diameter
Minimum [email protected] m/s
Rising Main Design Criteria Preferred Velocity 1.0-1.5 m/s
Maximum velocity @ PWWF 2.5 m/s
For SPS with 2 pumps, EACH pump delivers minimum 5 x
ADWF
Pump Station Design Criteria Overflows should not occur at flow < 5 x ADWF or C1 x
ADWF (whichever is the larger).
6hrs at ADWF of “in catchment storage
Northbrook Corporation Pty. Ltd. Version 4 17 September 2013
5101-19 Commercial in Confidence Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 15- Amended Water Supply and Sewerage Analysis MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.