Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

09/1227 - Operational Works - Landscaping [As Published] · 142009.1227

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

?

~~.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

PLANNING SCHEME:

 

44 ls the proposed operational work assessable under any State planning regulatory provisions?

No [ Yes

If no, is the proposed operational work assessable under the planning scheme?
LJ No - Goto 04.2 (11 Yes - Compete Form 1, Part E and answer 04.1.1 - 4.1.7 below
|ASSOCIATED WITH RECONEIGURING A LOT; RESIDENTIALY COMMERCIAL OR INDUSTRIAL DEVELOPMENT |

 

    

 

     

3 : Be aha E
4.2 Is any of the proposed operational work associated with
1X] No -Gotoas3 [] Yes

IPA, schedute 8, part 1, table 4, item 2: IP Regulation, schedule 1, part 2. table 5, item t{e)
Wild Rivers code (Nolo: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
area}

 

 

4.38 ts any part of the premises in an interim koala habitat protection area?

X] No -Gotoas38 [7] Yes
IP Regulation. schedule 2, table 2. item 34A

 

  
  

[VEGETATION CLEARING; KOALA CONSERVATION; WILD-RIVER AREA isdeg eh
4.3B Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
EX] No -Gotoas4 [J Yes
IPA, schedule 8 part 1, table 4, items 1A-1G; IP Regulation, schedule 2, table 2. ilem 5 (vegetation clearing): IP Regulation, schedule 2, table 2, tem 34 {koala
conservation); IP Requtation. schedule 1, part 3, table 4. item (vegetation clearingswild river area}; Vegetation Management Act 1299, section 224 (vegetation
clearingAwikd river area), Wild Rivers Act 2005, sections 21F and 43A

 

TAKING.OR INTERFERING WITH WATER; WILD RIVER AREA th

 

44 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse or lake?

BX] No -Gotoa4.5 [] Yes - Answer (a} and (b) below

   
 
 

part 1, table 4,
Ss Act 2005, se

eguiation,
nt wild ricer

   

45 !s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
4] No Goto Q4.6 Oo Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA. schedule 8, part i. table 4, item 3(b}: IP Requtation, schedule 2, table 2, item 8; iP Regulation. schedule 1, part 3, table 4. item 3
Wild Rivers code (Note: the code does noi currently contain aoplicable provisions for taking or interfering with arlesian water}

4.6 ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[IX] No -Gotoas7 (] Yes - Answer (a) and (b) below

IPA, tule 8. 1 tabs 4, ie Re red table 2. it
Whid Rivers Act 2008, svetion 434; re id Rivers Code

 

 

‘egulation, scheduie |, pert 3, jable 4. item 3: Water Act 2000, sectit

 

mr SBGA fentd river areal,

 

47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
BX] No -Gotoass [] Yes

IPA. schedule 8, part |, table 4. tem 3jci{i): 1P Regulation, schedule 2. table 2. item 8, iP Regulation, scheduie 1. part 3 lable 4. item J
Water Act 2000, section 966A (wild tiver area)(Nole: no current Wild River declaration identifies taking or interfering with subartesian water as assessable}
Wild River code (Note: the coda dees noi curently contain applicable provisions for sub artesian weter}

     

48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
LX] No -Gotoa49 [_] Yes - Answer both (a) and (b) below

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1227 - Operational Works - Landscaping [As Published].pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.